[Ord. 1-2012, 9/19/2012, § 301]
1. Applicants proposing regulated activities in the Township which do not fall under the exemption criteria shown in §
19-106 shall submit a stormwater management site plan consistent with this chapter and the applicable watershed stormwater management plan to the Township for review. The stormwater management criteria of this chapter shall apply to the total proposed development even if development is to take place in stages.
2. No regulated activity within Thornbury Township shall commence until
Thornbury Township issues approval of an SWM plan which demonstrates
compliance with the requirements of this chapter.
[Amended by Ord. No. 3-2022, 9/21/2022]
|
For any site with proposed regulated earth disturbance equal
to or greater than one acre where, after a close evaluation of alternative
site designs, it proves to be impracticable to meet the mandatory
minimum volume and infiltration control standards of this chapter
on site, the Township may approve measures other than those in this
chapter after consultation with and evaluation by PADEP that the alternate
site design meets state water quality requirements and does not conflict
with state law, including, but not limited to, the Clean Streams Law,
35 P.S. § 691.1 et seq. The evaluation referenced above
shall include, but not be limited to, in depth soil profile and infiltration
testing at locations across the entire site and at different elevations
as witnessed by and to the satisfaction of the Township Engineer.
|
|
For any site with proposed regulated earth disturbance that
is less than one acre where, after a close evaluation of alternative
site designs, it proves to be impracticable to meet any one or more
of the mandatory minimum volume and infiltration standards of this
chapter on site, the Township may approve measures other than those
in this chapter. The evaluation referenced above shall include, but
not be limited to, in depth soil profile and infiltration testing
at locations across the entire site and at different elevations as
witnessed by and to the satisfaction of the Township Engineer.
|
|
"Regulated earth disturbance" is defined to mean any activity
involving earth disturbance subject to regulation under 25 Pa.Code,
Chapter 92, 25 Pa.Code, Chapter 102, or the Clean Streams Law, 35
P.S. § 691.1 et seq.
|
3. The applicant is required to design the site to minimize surface
discharge of stormwater and the creation of impervious surfaces in
order to maintain, as much as possible, the natural hydrologic regime.
4. The SWM site plan must be designed consistent with the sequencing provisions of §
19-304 to ensure maintenance of the natural hydrologic regime, to promote infiltration, and to protect groundwater and surface water quality and quantity. The SWM site plan designer must proceed sequentially in accordance with this article of this chapter.
5. Stormwater drainage systems shall be designed in order to preserve
natural flow conditions to the maximum extent practicable.
6. Alteration of existing drainage discharge onto adjacent property
shall only be proposed in accordance with PADEP guidance document
"Chapter 102 Off-Site Discharges of Stormwater to Non-Surface Waters
- Frequently Asked Questions (FAQ)" dated January 2, 2019, or latest
guidance document from PADEP. Such discharge shall be subject to any
applicable discharge criteria specified in this chapter and still
must meet the requirements of Act 167.
[Amended by Ord. No. 3-2022, 9/21/2022]
7. Areas of existing diffused drainage discharge, whether proposed to
be concentrated or maintained as diffused drainage areas, shall be
subject to any applicable discharge criteria in the general direction
of existing discharge, except as otherwise provided by this chapter.
If diffused drainage discharge is proposed to be concentrated and
discharged onto adjacent property, the applicant must document that
adequate downstream conveyance facilities exist to safely transport
the concentrated discharge or otherwise prove that no erosion, sedimentation,
flooding, or other impacts will result from the concentrated discharge.
8. Where a development site is traversed by a stream, drainage easements
of 50 feet or meeting the one-hundred-year flood elevation as established
by FEMA mapping, or the calculated one-hundred-year floodplain, but
in no case less than 10 feet from the top of bank shall be provided
on either side of, and conform to the line of, such streams.
9. Minimization of impervious surfaces and infiltration of runoff through
seepage beds, infiltration trenches, etc., is encouraged where soil
conditions permit in order to reduce the size or eliminate the need
for detention facilities or other structural BMPs.
10. All stormwater runoff from new development or redevelopment shall
be pretreated for water quality prior to discharge to surface or groundwater.
Rooftop runoff may go directly to an infiltration BMP or be evapotranspirated.
11. All regulated activities within the Township shall be designed, implemented,
operated, and maintained to meet the purposes of this chapter, through
these two elements:
A. Erosion and sediment control during earth disturbance activities
(e.g., during construction).
B. Water quality protection measures after completion of earth disturbance
activities (i.e., after construction), including operations and maintenance.
12. The BMPs shall be designed, implemented, and maintained to meet state
water quality requirements and any other more stringent requirements
as determined by Thornbury Township. Applicants shall utilize the
Pennsylvania Stormwater Best Management Practices Manual (PA BMP Manual),
as amended, or other sources acceptable to the Municipal Engineer,
for testing and design standards for BMPs, and where there is a conflict
with the provisions of this chapter, the most restrictive applies.
[Amended by Ord. No. 3-2022, 9/21/2022]
13. Post-construction water quality protection shall be addressed as required by §
19-306.
14. Operations and maintenance of permanent stormwater BMPs shall be addressed as required by Article
7.
15. All BMPs used to meet the requirements of this chapter shall conform
to the state water quality requirements and any more stringent requirements
as set forth by the Township.
16. Techniques described in Appendix 19-E (Low Impact Development) of
this chapter shall be considered because they reduce the costs of
complying with the requirements of this chapter and the state water
quality requirements.
17. In selecting the appropriate BMPs or combinations thereof, the applicant
shall consider the following:
A. Total contributing drainage area.
B. Permeability and infiltration rate of the site's soils.
C. Slope and depth to bedrock.
D. Seasonal high water table.
E. Proximity to building foundations and wellheads.
G. Land availability and configuration of the topography.
H. Peak discharge and required volume control.
J. Efficiency of the BMPs to mitigate potential water quality problems.
K. The volume of runoff that will be effectively treated.
L. The nature of the pollutant being removed.
M. Maintenance requirements.
N. Creation/protection of aquatic and wildlife habitat.
P. Enhancement of aesthetic and property values.
18. The design of all stormwater management facilities shall incorporate
sound engineering principles and practices in a manner that does not
aggravate existing stormwater problems. The Township reserves the
right to disapprove any design that would result in construction in
or continuation of a stormwater problem area.
19. The applicant may meet the stormwater management criteria through
off-site stormwater management measures as long as the proposed measures
are in the same subwatershed as shown in Appendix 19-A.
20. Stormwater Hotspots. Stormwater runoff from hot spots shall be pretreated
prior to surface or groundwater infiltration to prevent pollutant
runoff. Industrial sites referenced in 40 CFR 125 are examples of
hot spots.
A. Below is a list of examples of hot spots:
(1)
Vehicle salvage yards and recycling facilities.
(2)
Vehicle fueling stations.
(3)
Vehicle service and maintenance facilities.
(4)
Vehicle and equipment cleaning facilities.
(5)
Fleet storage areas (bus, truck, etc.).
(6)
Industrial sites based on Standard Industrial Classification
Codes.
(7)
Marinas (service and maintenance areas).
(8)
Outdoor liquid container storage.
(9)
Outdoor loading/unloading facilities.
(10)
Public works storage areas.
(11)
Facilities that generate or store hazardous materials.
(12)
Commercial container nursery.
(13)
Contaminated sites/brownfields.
(14)
Other land uses and activities as designated by an appropriate
review authority.
B. The following land uses and activities are not normally considered
hot spots:
(1)
Residential streets and rural highways.
(3)
Institutional development.
(6)
Pervious areas, except golf courses and nurseries (which may
need an integrated pest management (IPM) plan).
C. While streets and highways (average daily traffic volume (ADT) greater
than 30,000 are not considered stormwater hot spots, it is important
to ensure that highway stormwater management facilities are designed
to adequately protect receiving streams and/or groundwater.
D. The Environmental Protection Agency's (EPA) NPDES stormwater program
requires some industrial sites to prepare and implement a stormwater
pollution prevention plan.
21. The
following standards for protection of adjacent and downgradient properties
from off-site conveyance must be accomplished:
[Amended by Ord. No. 3-2022, 9/21/2022]
A. For
any location where a new concentrated discharge of stormwater from
any frequency rainfall event, up to and including the 100-year storm,
and the volume of runoff, up to and including the two-year storm,
onto or through adjacent property(ies) or downgradient property(ies),
the following are required:
(1)
A drainage easement (or other legal agreement/approval) must
be obtained for conveyance of discharges onto or through adjacent
properties, per the PADEP guidance document, "Chapter 102 Off-Site
Discharges of Stormwater to Non-Surface Waters - Frequently Asked
Questions (FAQ)," dated January 2, 2019, or latest guidance document
from PADEP.
(2)
The conveyance must be designed to avoid erosion, flooding,
or other damage to the properties through which it is being conveyed.
22. Additional Water Quality Requirements. The Township may require additional
stormwater control measures for stormwater discharges to special management
areas including, but not limited to:
A. Water bodies listed as "impaired" by PADEP.
B. Any water body or watershed with an approved total maximum daily
load (TMDL). Areas of known existing flooding problems.
C. Critical areas with sensitive resources (e.g., state-designated special
protection waters, cold water fisheries, carbonate geology or other
groundwater recharge areas that may be highly vulnerable to contamination,
drainage areas to water supply reservoirs, etc.).
[Ord. 1-2012, 9/19/2012, § 302]
1. The following permit requirements may apply to certain regulated
earth disturbance activities and must be met prior to commencement
of regulated earth disturbance activities, as applicable:
A. All regulated earth disturbance activities subject to permit requirements
by PADEP under regulations at 25 Pa.Code, Chapter 102.
B. Work within natural drainageways subject to permit by PADEP under
25 Pa.Code, Chapter 105.
C. Any stormwater management facility that would be located in or adjacent
to surface waters of the commonwealth, including wetlands, subject
to permit by PADEP under 25 Pa.Code, Chapter 105.
D. Any stormwater management facility that would be located on or discharging
to a state highway right-of-way, or require access to or from a state
highway shall be subject to approval by PennDOT.
E. Culverts, bridges, storm sewers, or any other facilities which must
pass or convey flows from the tributary area and any facility which
may constitute a dam subject to permit by PADEP under 25 Pa.Code,
Chapter 105.
[Ord. 1-2012, 9/19/2012, § 303]
1. No regulated earth disturbance activities within the Township shall
commence until the Township receives an approval from the PADEP in
compliance with 25 Pa.Code, Chapter 102, of an erosion and sediment
control plan for construction activities if applicable.
2. PADEP has regulations regarding an erosion and sediment control under
25 Pa.Code, Chapter 102.
3. In addition, under 25 Pa.Code, Chapter 92, a PADEP "NPDES Construction
Activities" Permit is required for regulated earth disturbance activities.
4. Evidence of any necessary permit(s) for regulated earth disturbance activities from the appropriate PADEP regional office or County Conservation District must be provided to the Township. The issuance of an NPDES Construction Permit (or permit coverage under the Statewide General Permit (PAG-2)) satisfies the requirements of §
19-403, Subsection
1A.
5. A copy of the erosion and sediment control plan and any required
permit, as required by PADEP regulations, shall be available on the
project site at all times.
6. Additional erosion and sediment control design standards and criteria
are recommended to be applied where infiltration BMPs are proposed.
At a minimum, they shall include the following:
A. Areas proposed for infiltration BMPs shall be protected from sedimentation
and compaction during the construction phase to maintain maximum infiltration
capacity.
B. Infiltration BMPs shall not be constructed nor receive runoff until
the entire drainage area contributory to the infiltration BMP has
achieved final stabilization.
[Ord. 1-2012, 9/19/2012, § 304]
1. The design of all regulated activities shall include the following
to minimize stormwater impacts to reduce the surface discharge of
stormwater, reduce the creation of unnecessary impervious surfaces,
prevent the degradation of waters of the commonwealth, and maintain
as much as possible the natural hydrologic regime of the site.
A. The applicant shall apply low impact development (LID) methods such
as those listed in Appendix 19-E, provided that use of this method
does not conflict with other local codes.
B. The applicant shall demonstrate that the design process follows the
sequence noted below. The goal of the sequence is to minimize the
increases in stormwater runoff and impacts to water quality resulting
from the proposed regulated activity:
(1)
The following items in this subparagraph shall be addressed
prior to development of other stormwater management site plan design
elements:
(a)
Prepare an Existing Resource and Site Analysis Map (ERSAM) showing environmentally sensitive areas including, but not limited to, steep slopes, ponds, lakes, streams, wetlands, hydric soils, vernal pools, stream buffers, and hydrologic soil groups. Land development, any existing recharge areas, and other requirements outlined in the Township SALDO [Chapter
22] shall also be included.
(b)
Establish a stream buffer according to §
19-311.
[Amended by Ord. No. 3-2022, 9/21/2022]
(c)
Prepare a draft project layout avoiding sensitive areas identified in Subsection
1B(1)(a).
(d)
Identify site-specific existing conditions drainage areas, discharge
points, recharge areas, and hydrologic soil groups A and B (areas
conducive to infiltration).
(e)
Evaluate nonstructural stormwater management alternatives:
1)
Minimize earth disturbance.
2)
Minimize impervious surfaces.
3)
Break up large impervious surfaces.
(f)
Determine into what management district the site falls (Appendix
19-A), and conduct an existing conditions runoff analysis.
(2)
The following items in this subsection may be addressed in any order provided that all items in Subsection
1B(1) have been completed.
(a)
Satisfy the infiltration objective (§
19-305) and provide for stormwater pretreatment prior to infiltration.
(b)
Provide for water quality protection in accordance with §
19-306 water quality requirements.
(c)
Provide stream bank erosion protection in accordance with §
19-307 stream bank erosion requirements.
(d)
Prepare final project design to maintain existing conditions
drainage areas and discharge points, to minimize earth disturbance
and impervious surfaces, and, to the maximum extent possible, to ensure
that the remaining site development has no surface or point discharge.
(e)
Conduct a proposed conditions runoff analysis based on the final design that meets the management district requirements (§
19-308).
(f)
Manage any remaining runoff prior to discharge through detention,
bioretention, direct discharge, or other structural control.
[Ord. 1-2012, 9/19/2012, § 305]
1. Providing for infiltration consistent with the natural hydrologic
regime is required. Design of the infiltration facilities shall consider
infiltration to compensate for the reduction in the recharge that
occurs when the ground surface is disturbed or impervious surface
is created.
2. If it cannot be physically accomplished, then the design professional shall be responsible for demonstrating to the satisfaction of Thornbury Township that this cannot be physically accomplished on the site (e.g., shallow depth to bedrock or limiting zone, open voids, steep slopes, etc. A financial hardship, as defined in §
19-202, is not acceptable to avoid implementing infiltration facilities. If infiltration can be physically accomplished, the volume of runoff to be infiltrated shall be determined from Subsection
3B depending on demonstrated site conditions, and shall be the greatest volume that can be physically infiltrated or alternative methods consistent with the PA BMP Manual (as amended) or other PADEP guidance, such as the Managed Release Concept, may be used to manage this volume with approval from the Municipal Engineer. For example:
[Amended by Ord. No. 3-2022, 9/21/2022]
A. Any applicant (developer or redeveloper) shall first attempt to infiltrate the volume required in Subsection
3B(1).
B. If the Subsection
3B(1) requirement cannot be physically accomplished, then the applicant is required to attempt to infiltrate the volume required in Subsection
3B(2).
C. Finally, if the Subsection
3B(2) infiltration volume cannot be physically accomplished, the applicant must, at a minimum, infiltrate the volume required in Subsection
3B(3).
3. Infiltration BMPs shall meet the following minimum requirements:
A. Infiltration BMPs intended to receive runoff from developed or redeveloped
areas shall be selected based on suitability of soils and site conditions
and shall be constructed on soils that have the following characteristics:
(1)
A minimum depth of 24 inches between the bottom of the BMP and
the top of the limiting zone.
(2)
An infiltration rate sufficient to accept the additional stormwater
volume and dewater completely as determined by field tests conducted
by the applicant's design professional.
(3)
The infiltration facility shall be capable of completely draining
the retention (infiltration) volume (Rev) within
three days (72 hours) from the end of the design storm.
B. The size of the infiltration facility and Rev shall be based upon the following volume criteria:
(1)
Modified Control Guideline One (MCG-1) of the PA BMP Manual.
The retention (infiltration) volume (Re
v) to
be captured and infiltrated shall be the net two-year, twenty-four-hour
volume. The net volume is the difference between the post-development
runoff volume and the predevelopment runoff volume. The post-development
total runoff volume for all storms equal to or less than the two-year,
twenty-four-hour duration precipitation shall not be increased. For
modeling purposes, existing (predevelopment) nonforested pervious
areas must be considered meadow in good condition or its equivalent,
and 20% of existing impervious area, when present, shall be considered
meadow in good condition.
[Amended by Ord. No. 3-2022, 9/21/2022]
(2)
Infiltrating the entire Rev volume in
subparagraph (1) (above) may not be feasible on every site due to
site-specific limitations such as shallow depth to bedrock or the
water table. If it cannot be physically accomplished, then the following
criteria from Modified Control Guideline Two (MCG-2) of the PA BMP
Manual must be satisfied:
(a)
At least the first one-inch of runoff from new or replacement
impervious surfaces shall be infiltrated.
|
Rev = one (inch) * impervious area (square
feet)
|
12 (inches) = cubic feet
|
---|
|
An asterisk (*) in equations denotes multiplication.
|
(3)
Only if infiltrating the entire Rev volume
in subparagraph (2) (above) cannot be physically accomplished, then
the following minimum criteria from Modified Control Guideline Two
(MCG-2) of the PA BMP Manual must be satisfied:
(a)
Wherever possible, infiltration facilities should be designed
to accommodate infiltration of the entire water quality volume (WQ
v) (§
19-306, Subsection
3); however, in all cases at least the first 1/2 inch of the WQv shall be infiltrated. The minimum infiltration volume (Re
v) required
would, therefore, be computed as:
|
Rev = I * impervious area (square feet)
|
12 (inches) = cubic feet
|
---|
|
An asterisk (*) in equations denotes multiplication.
|
|
Where:
|
---|
|
|
I
|
=
|
The maximum equivalent infiltration amount (inches) that the
site can physically accept or 0.50 inch, whichever is greater.
|
(b)
The retention volume values derived from the methods in subparagraphs
(1), (2) or (3) is the minimum volume the applicant must control through
an infiltration BMP facility. If site conditions preclude capture
of runoff from portions of the impervious area, the infiltration volume
for the remaining area should be increased an equivalent amount to
offset the loss.
(c)
Only if the minimum of 0.50 inch of infiltration requirement
cannot be physically accomplished, a waiver from this section, infiltration
volume requirements is required from the Township.
4. Soils. A detailed soils evaluation of the project site shall be required
to determine the suitability of infiltration facilities. The evaluation
shall be performed by a qualified design professional and at minimum
address soil permeability, depth to bedrock, and subgrade stability.
The general process for designing the infiltration BMP shall be:
A. Analyze hydrologic soil groups as well as natural and man-made features
within the site to determine general areas of suitability for infiltration
practices. In areas where development on fill material is under consideration,
conduct geotechnical investigations of sub-grade stability; infiltration
may not be ruled out without conducting these tests.
B. Provide field tests as required in the PA BMP Manual.
[Amended by Ord. No. 3-2022, 9/21/2022]
C. Design the infiltration structure for the required retention (Rev) volume based on field determined capacity at the level
of the proposed infiltration surface.
D. If on-lot infiltration structures are proposed by the applicant's
design professional, it must be demonstrated to the Township that
the soils are conducive to infiltrate on the lots identified.
5. Infiltration facilities should, to the greatest extent practicable,
be located to avoid introducing contaminants via groundwater, and
be in conformance with an approved source water protection assessment
or source water protection plan.
6. Roadway drainage systems should provide an opportunity to capture
accidental spills. Road de-icing material storage facilities shall
be designed to avoid salt and chloride runoff from entering waterways
and infiltration facilities. The qualified design professional shall
evaluate the possibility of groundwater contamination from the proposed
infiltration facility and perform a hydrogeologic justification study
if necessary.
7. The Township may require additional water quality and runoff control measures for stormwater discharging to special management areas such as those listed in §
19-301, Subsection
22. The antidegredation analysis found in [25 Pa.Code] Chapter 93 shall be applied in HQ or EV streams.
8. An impermeable liner will be required in detention basins where the
possibility of groundwater contamination exists. The Township may
require a detailed hydrogeologic investigation.
9. The applicant should provide safeguards against groundwater contamination
for land uses that may cause groundwater contamination should there
be a mishap or spill.
[Ord. 1-2012, 9/19/2012, § 306]
1. The applicant shall comply with the following water quality requirements
of this article.
2. To control post-construction stormwater impacts from regulated activities
and conform to state water quality requirements, BMPs which replicate
predevelopment stormwater infiltration and runoff conditions must
be provided in the site design such that post-construction stormwater
discharges do not degrade the physical, chemical, or biological characteristics
of the receiving waters. The green infrastructure and low-impact development
(LID) practices provided in the PA BMP Manual, as well as the guidance
on green infrastructure and LID provided in Appendix 19-E, shall be
utilized for all regulated activities wherever possible. This may
be achieved by the following:
[Amended by Ord. No. 3-2022, 9/21/2022]
A. Infiltration: replication of preconstruction stormwater infiltration
conditions;
B. Treatment: use of water quality treatment BMPs to provide filtering
of chemical and physical pollutants from the stormwater runoff; and
C. Stream Bank and Stream Bed Protection: management of volume and rate
of post-construction stormwater discharges to prevent physical degradation
of receiving waters (e.g., from scouring).
3. Developed areas shall provide adequate storage and treatment facilities necessary to capture and treat stormwater runoff. The infiltration volume computed under §
19-305 may be a component of the water quality volume if the applicant chooses to manage both components in a single facility. If the calculated water quality volume (WQv) is greater than the volume required to be infiltrated as described in §
19-305, Subsection
3B, then the difference between the two volumes shall be treated for water quality by an acceptable stormwater management practice(s). The required water quality volume (WQv) is the storage capacity needed to capture and treat a portion of stormwater runoff from the developed areas of the site.
4. To achieve this requirement, the following criterion is established:
A. The post-construction total runoff volume shall not exceed the predevelopment
total runoff volume for all storms equal to or less than the two-year,
twenty-four-hour duration precipitation (design storm). If the Municipal
Engineer concurs that this criterion cannot be met, a minimum of 0.5
inch of runoff from all regulated impervious surfaces shall be managed.
For modeling purposes, existing (predevelopment) nonforested pervious
areas must be considered meadow in good condition or its equivalent,
and 20% of existing impervious area, when present, shall be considered
meadow in good condition.
[Amended by Ord. No. 3-2022, 9/21/2022]
B. This volume requirement can be managed by the permanent volume of
a wet basin or the detained volume from other BMPs. Where appropriate,
wet basins shall be utilized for water quality control and shall follow
the guidelines of the PA BMP Manual referenced in Appendix 19-G.
C. Release of water can begin at the start of the storm (i.e., the invert
of the water quality orifice is at the invert of the facility). The
design of the facility shall provide for protection from clogging
and unwanted sedimentation.
5. The temperature of receiving waters shall be protected through the
use of BMPs that moderate temperature.
6. Evapotranspiration may be quantified and credited towards meeting
volume requirements according to the PADEP Post Construction Stormwater
Management (PCSM) Spreadsheet and Instructions (December 2020) or
the most recent guidance from PADEP.
[Amended by Ord. No. 3-2022, 9/21/2022]
7. If an existing buffer is legally prescribed (i.e., deed, covenant,
easement, etc.) and it exceeds the requirements of this chapter, the
existing buffer shall be maintained.
[Ord. 1-2012, 9/19/2012, § 307]
1. In addition to controlling the water quality volume (in order to
minimize the impact of stormwater runoff on downstream stream bank
erosion), the primary requirement to control stream bank erosion is
to design a BMP to detain the proposed conditions two-year, twenty-four-hour
design storm to the existing conditions one-year flow using the SCS
Type II distribution. Additionally, provisions shall be made (such
as adding a small orifice at the bottom of the outlet structure) to
release the proposed conditions one-year storm for a minimum of 24
hours from a point in time when the maximum volume of water from the
one-year storm is stored in a proposed BMP (i.e., the maximum water
surface elevation is achieved in the facility). Release of water can
begin at the start of the storm (i.e., the invert of the water quality
orifice is at the invert of the facility).
2. The minimum orifice size in the outlet structure to the BMP shall
be three inches in diameter where possible, and a trash rack shall
be installed to prevent clogging. On sites with small drainage areas
contributing to this BMP that do not provide enough runoff volume
to allow a twenty-four-hour attenuation with the three-inch orifice,
the calculations shall be submitted showing this condition. When the
calculated orifice size is below three inches, gravel filters (or
other methods) are recommended to discharge low-flow rates subject
to the Township Engineer's satisfaction. When filters are utilized,
maintenance provisions shall be provided to ensure filters meet the
design function. All facilities shall make use of measures to extend
the flow path and increase the travel time of flows in the facility.
[Ord. 1-2012, 9/19/2012, § 308]
1. Each watershed has been divided into either stormwater management
districts or release rate districts as shown on the respective Management
District or Release Rate Maps in Appendix 19-A.
A. In addition to the watershed-specific requirements specified in Tables 19-308-1 and 19-308-2 below, the erosion and sedimentation control (§
19-303), the nonstructural project design (§
19-304), the infiltration (§
19-305), the water quality (§
19-306), and the stream bank erosion (§
19-307) requirements shall be implemented.
B. Standards for managing runoff from each subarea in a watershed for
the two-, five-, ten-, twenty-five-, fifty-, and one-hundred-year
design storms are shown in Tables 19-308-1 and 19-308-2. Development
sites located in each of the management/release rate districts must
control proposed conditions runoff rates to existing conditions runoff
rates for the design storms in accordance with the Tables.
C. In all cases, and in all subareas, the rate of runoff for the proposed
condition two-year storm shall not exceed the existing condition one-year
storm.
2. General. Proposed conditions rates of runoff from any regulated activity
shall not exceed the peak release rates of runoff from existing conditions
for the design storms specified on the Stormwater Management District
Watershed Maps (Appendix 19-A) and this section of this chapter.
3. District Boundaries. The boundaries of the stormwater management
districts are shown on official maps that are available for inspection
at the Township and County planning offices. A copy of the official
maps at a reduced scale are included in Appendix 19-A. The exact location
of the stormwater management district boundaries as they apply to
a given development site shall be determined by mapping the boundaries
using the two-foot topographic contours (or most accurate data required)
provided as part of the SWM site plan.
4. Sites Located in More than One District or Watershed. For a proposed
development site located within two or more stormwater management
district subareas, the peak discharge rate from any subarea shall
meet the management district criteria for which the discharge is located.
The natural hydrology of each respective subarea shall be maintained,
and drainage shall not be redirected from one subarea to another.
Under circumstances where the applicant shows this cannot be accomplished,
a waiver is required by the Township.
Table 19-308-1
Peak Rate Control Standards in the
Ridley Creek Watershed
|
---|
Sub-area
|
Release Rate Percentage
|
Sub-area
|
Release Rate Percentage
|
---|
3
|
85
|
26, 27
|
50
|
4-7
|
50
|
28
|
60
|
8
|
80
|
29, 30
|
50
|
9-14
|
50
|
31
|
60
|
16
|
95
|
32-39
|
50
|
17-22
|
50
|
31
|
60
|
23
|
70
|
32-39
|
50
|
24
|
80
|
40
|
85
|
25
|
95
|
49-65
|
50
|
Table 19-308-2
Control Criteria for Chester Creek Watershed
Stormwater Management Districts
|
---|
District
|
Control Criteria
|
---|
100%
|
Post-development peak discharge for all design storms must be
no greater than predevelopment peak discharges.
|
75%
|
Post-development peak discharge for all design storms must be
no greater than 75% of the predevelopment peak discharges.
|
50%
|
Post-development peak discharge for all design storms must be
no greater than 50% of the predevelopment peak discharges.
|
5. Off-Site Areas. Off-site areas that drain through a proposed development
site are not subject to release rate criteria when determining allowable
peak runoff rates. On-site drainage facilities shall be designed to
safely convey off-site flows through the development site.
6. Site Areas. Where the site area to be impacted by a proposed development
activity differs significantly from the total site area, only the
proposed impact area utilizing stormwater management measures shall
be subject to the peak rate control standards noted above. Unimpacted
areas for which the discharge point has not changed are not subject
to the peak rate control standards.
7. Alternate Criteria for Redevelopment Sites. For redevelopment sites,
one of the following minimum design parameters shall be accomplished,
whichever is most appropriate for the given site conditions as determined
by the Township:
A. Meet the full requirements specified by Tables 19-308-1, 19-308-2 and Subsections
1 through
4.
B. Reduce the total predevelopment impervious surface on the site by
at least 20%; based upon a comparison of existing impervious surface
to regulated impervious surface. In this case, calculations must be
provided that show the peak rate has not increased.
[Amended by Ord. No. 3-2022, 9/21/2022]
[Ord. 1-2012, 9/19/2012, § 309]
1. Stormwater runoff from all development sites with a drainage area
of greater than five acres shall be calculated using a generally accepted
calculation technique that is based on the NRCS Soil Cover Complex
Method. Table 19-309-1 summarizes acceptable computation methods.
The method selected by the design professional shall be based on the
individual limitations and suitability of each method for a particular
site. The use of the Rational Method to estimate peak discharges for
drainage areas greater than five acres shall be permitted only upon
approval of the Township.
Table 19-309-1
Acceptable Computation Methodologies for SWM Site Plan
|
---|
Method
|
Developed by
|
Applicability
|
---|
TR-20 (or commercial computer package based on TR-20)
|
USDA NCRS
|
Applicable where use of full hydrology computer model is desirable
or necessary.
|
Applicable where use of full TR-55 (or commercial computer package
based on TR-55)
|
USDA NCRS
|
Applicable for land development plans where limitations described
in TR-55.
|
HEC-1/HEC-HMS
|
US Army Corps of Engineers
|
Applicable where use of a full hydrologic computer model is
desirable or necessary.
|
Rational Method (or commercial computer package based on Rational
Method)
|
Emil Kuichling (1889)
|
For sites up to five acres, or as approved by the Township and/or
Township Engineer.
|
Other methods
|
Varies
|
Other computation methodologies approved by the Township and/or
Township Engineer.
|
2. All calculations consistent with this chapter using the Soil Cover
Complex Method shall use the appropriate design rainfall depths for
the various return period storms. Rainfall depths shall be according
to NOAA Atlas 14 values consistent with a partial duration series.
When stormwater calculations are performed for routing procedures
or water quality functions, the duration of rainfall shall be 24 hours.
3. The following criteria shall be used for peak rate runoff calculations:
A. For all development sites including redevelopment, the ground cover
used in determining the existing conditions flow rates shall be as
follows:
(1)
Wooded sites shall use a ground cover of "woods in good condition."
(CN=55) Portions of a site having more than one viable tree measuring
a diameter at breast height (DBH) of six inches or greater per 1,500
square feet shall be considered wooded where such trees existed within
three years of application.
(2)
All portions of the site regardless of existing ground cover
shall be considered as "meadow in good condition," (CN=58, c=0.12)
unless the natural ground cover generates a lower curve (CN) number
or Rational "c" value (i.e., woods) as listed in Tables 19-F-1 or
19-F-2 in Appendix 19-F of this chapter.
B. Through Township waiver, and only for redevelopment sites, the ground
cover used in determining the existing conditions flow rates for the
developed portion of the site could be based upon actual land cover
conditions. Additional conditions and stormwater requirements may
apply with this waiver.
4. All calculations using the Rational Method shall use rainfall intensities
consistent with appropriate times-of-concentration (duration) and
storm events with rainfall intensities obtained from NOAA Atlas 14
partial duration series estimates, or the latest version of the PennDOT
Drainage Manual (PDM Publication 584). Times-of-concentration shall
be calculated based on the methodology recommended in the respective
model used. Times of concentration for channel and pipe flow shall
be computed using a minimum of five minutes.
[Amended by Ord. No. 3-2022, 9/21/2022]
5. Runoff curve numbers (CN) for both existing and proposed conditions
to be used in the Soil Cover Complex Method shall be obtained from
Table 19-F-1 in Appendix 19-F of this chapter.
6. Runoff coefficients (c) for both existing and proposed conditions
for use in the Rational Method shall be obtained from Table 19-F-2
in Appendix 19-F of this chapter.
7. Hydraulic computations to determine the capacity of pipes, culverts,
and storm sewers shall be consistent with methods and computations
contained in the Federal Highway Administration Hydraulic Design Series
No. 5 (Publication No. FHWA-NHI-01-020 HDS No. 5). Hydraulic computations
to determine the capacity of open channels shall be consistent with
methods and computations contained in the Federal Highway Administration
Hydraulic Engineering Circular No. 15 (Publication No. FHWANHI-05-114
HEC 15). Values for Manning's roughness coefficient (n) shall be consistent
with Table 19-F-3 in Appendix 19-F of this chapter.
8. Outlet structures for stormwater management facilities shall be designed
to meet the performance standards of this chapter using any generally
accepted hydraulic analysis technique or method.
9. The design of any stormwater detention facilities intended to meet
the performance standards of this chapter shall be verified by routing
the design storm hydrograph through these facilities using an acceptable
method. The design storm hydrograph shall be computed using a calculation
method that produces a full hydrograph. The Township may approve the
use of any generally accepted full hydrograph approximation technique
that shall use a total runoff volume that is consistent with the volume
from a method that produces a full hydrograph.
[Ord. 1-2012, 9/19/2012, § 310]
1. All wet basin designs shall incorporate biologic controls consistent
with the West Nile Guidance found in Appendix H, PADEP document 363-0300-001
"Design Criteria-Wetlands Replacement/Monitoring," or contact the
Pennsylvania State Cooperative Wetland Center (www.wetlands.psu.edu/)
or the Penn State Cooperative Extension Office (www.extension.psu.edu/extmap.html).
2. Any stormwater basin required or regulated by this chapter designed
to store runoff and requiring a berm or earthen embankment shall be
designed to provide an emergency spillway to handle flow up to and
including the one-hundred-year proposed conditions. The height of
embankment must provide a minimum 1.0 of freeboard above the maximum
pool elevation computed when the facility functions for the one-hundred-year
proposed conditions inflow. Should any stormwater management facility
require a dam safety permit under PADEP [25 Pa.Code] Chapter 105,
the facility shall be designed in accordance with Chapter 105 and
meet the regulations of Chapter 105 concerning dam safety. Chapter
105 may require the passing of storms larger than one-hundred-year
event.
3. Any drainage conveyance facility and/or channel not governed by [25
Pa.Code] Chapter 105 regulations must be able to convey, without damage
to the drainage structure or roadway, runoff from the twenty-five-year
storm event. The larger events (fifty-year and one-hundred-year) must
also be safely conveyed in the direction of natural flow without creating
additional damage to any drainage structures, nearby structures, or
roadways.
4. Conveyance facilities transporting flow to or exiting from stormwater
management facilities (i.e., detention basins) shall be designed to
convey the 100-year frequency storm.
[Amended by Ord. No. 3-2022, 9/21/2022]
5. Roadway crossings or structures located within designated floodplain
areas must be able to convey runoff from a one-hundred-year design
storm consistent with Federal Emergency Management Agency National
Flood Insurance Program-Floodplain Management Requirements.
6. Any facility located within a PennDOT right-of-way must meet PennDOT
minimum design standards and permit submission requirements.
7. Adequate erosion protection and energy dissipation shall be provided
along all open channels and at all points of discharge. Design methods
shall be consistent with the Federal Highway Administration Hydraulic
Engineering Circular No. 11 (Publication No. FHWA-IP-89-016) and the
PADEP Erosion and Sediment Pollution Control Program Manual (Publication
No. 363-2134-008).
[Added by Ord. No. 3-2022, 9/21/2022]
1. Except
as required by Chapter 102, if a perennial or intermittent stream passes through,
or a waterbody (i.e., lake, pond, wetland) is present on the site,
the applicant shall create a riparian buffer, extending a minimum
of 75 feet, to either side of the top-of-bank of the channel, stream,
lake, and/or from the edge of wetlands, whichever results in the greatest
buffer distance.
2. The riparian
buffer shall be planted with native vegetation and maintained in a
vegetated state (Refer to Appendix 19-B, Pennsylvania Native Plant
List, contained in the PA BMP Manual or latest guidance document from
PADEP).
A. The following
provisions also apply to riparian buffers on lots in existence at
the time of original adoption of this chapter:
(1) If the applicable rear or side yard setback is less than 75 feet,
the buffer width may be reduced to 25% of the setback or 25 feet,
whichever is greater, by Township waiver.
(2) If a stream traverses a site in a manner that significantly reduces
the use of the site, the buffer may be reduced to 25 feet on either
side, with Township waiver.
B. Permitted
uses within the riparian buffer include the following, subject to
municipal approval and provided that they comply with all federal,
state, and local regulations:
(1) Recreational trails. See Appendix 19-J, Riparian Buffer Trail Guidelines.
(4) Other uses subject to Township approval.
C. If an
existing riparian buffer is legally prescribed (i.e., deed, covenant,
easement, etc.) and it exceeds the requirements of this chapter, the
existing buffer shall be observed and maintained.
3. In order
to protect and improve water quality, a riparian buffer easement shall
be created and recorded as part of any subdivision or land development
that encompasses a riparian buffer.
4. Minimum
Management Requirements for Riparian Buffers.
A. Existing
native vegetation shall be protected and maintained within the riparian
buffer easement.
B. Whenever
practicable, invasive vegetation shall be actively removed and the
riparian buffer easement shall be planted with native trees, shrubs
and other vegetation to create a diverse native plant community appropriate
to the intended ecological context of the site.
5. The riparian
buffer easement shall be enforceable by the municipality and shall
be recorded in the Delaware County Recorder of Deeds Office, so that
it shall run with the land and shall limit the use of the property
located therein.
6. Any permitted
use within the riparian buffer easement shall be conducted in a manner
that will maintain the extent of the existing 100-year floodplain,
improve or maintain the stream stability, and preserve and protect
the ecological function of the floodplain.
7. The following
conditions shall apply when public and/or private recreation trails
are permitted within riparian buffers:
A. Trails
shall be for nonmotorized use only.
B. Trails
shall be designed to have the least impact on native plant species
and other sensitive environmental features.
8. Septic
drainfields and sewage disposal systems shall not be permitted within
the riparian buffer easement and shall comply with setback requirements
established under 25 Pa. Code Chapter 73.