The final erosion and sediment control plans must include the limit
of disturbance (LOD), the location of each sediment control practice,
contours for sediment traps and sediment basins, associated construction
notes, details, and representative cross sections. When phasing is
necessary, the sediment control plan must include initial, interim,
and final phase sediment control practices, as appropriate. A sequence
of construction must be provided with enough detail to guide the construction,
maintenance, and removal of the erosion and sediment controls.