Prior to a conveyance of real property. The owner of the parcel shall
arrange for an on-site wastewater treatment system inspection prior
to the conveyance of real property. For conveyance of real property,
the inspection must be completed at least 10 days and not more than
six months prior to the transfer of property. The inspection report
must be filed with the authority having jurisdiction, the current
owner, and the proposed new owner prior to the transfer of property.
It shall be a violation of this chapter to not have the property inspected
prior to the conveyance of real property. If the required inspection
does not occur prior to the conveyance of real property, then the
authority having jurisdiction will inspect the system following the
access procedures defined in this chapter.