For the purposes of this article, the following definitions
shall apply:
FLOOR AREA
The actual occupied area, not including unoccupied accessory
areas or thickness of walls, except that floor area shall not include
the conversion of an existing space into a livable space. such as
a basement. as long as a septic system upgrade is not required by
the Suffolk County Department of Health Services.
[Amended 7-24-2018 by L.L. No. 15-2018]
HIGH-PRIORITY AREA
Those areas mapped as such in the adopted CPF Water Quality
Improvement Project Plan (WQIPP), and as may be amended from time
to time.
SUBSTANTIAL SEPTIC SYSTEM UPGRADE
A change or upgrade to the existing septic system where the
cost of said change or upgrade equals or exceeds 50% of the cost of
the current system.
[Added 10-10-2017 by L.L.
No. 25-2017]
This article shall apply to any application made for a building
permit after September 1, 2017 that meets the criteria described above,
except for the following:
A. Applicants that have received conditional wetlands permit approval,
or an administrative wetlands permit, prior to September 1, 2017,
shall not have to comply with the requirements herein; or
B. Applicants that have complete applications pending review with the
Suffolk County Department of Health Services prior to September 1,
2017, as verified by the Department of Health Services' records, shall
not have to comply with the requirements herein.