Type of Street
|
Minimum Right-of-Way Required
(feet)
|
Minimum Cartway or Paving Width
(feet)
|
---|---|---|
Local
|
60
|
30
|
Collector
|
80
|
36
|
Arterial
|
120
|
36 to 48
|
Street
|
Prepared Subgrade
|
Subbase
(inches)
|
Base Course
(inches)
|
Surface Course
(inches)
|
---|---|---|---|---|
Arterial streets1
|
Yes
|
6
|
5 of 25-mm PG64-22
|
3 1/2 of bituminous material2
|
Collector streets1
|
Yes
|
6
|
5 of 25-mm PG64-22
|
3 1/2 of bituminous material2
|
Local streets1
|
Yes
|
4
|
4 of 25-mm PG64-22
|
3 1/2 of bituminous material3
|
NOTES:
| |
1
|
Pipe foundation underdrain is required. Use of the underdrain
may be waived if it is determined unnecessary by the Borough Engineer
upon inspection of the subsurface soil conditions during roadway excavation.
|
2
|
One and one-half inches of 9.5-mm PG64-22 wearing course (_____
to _____ million ESALs, SRL-H) on two inches of 19-mm PG64-22 binder
course. [ESAL (equivalent single-axle load) values must be determined.]
|
3
|
One and one-half inches of 9.5-mm, PG64-22 wearing course (0.3
to 3.0 million ESALs, SRL-H) on two inches of 19-mm PG64-22 binder
course.
|
Street
|
Prepared Subgrade
|
Subbase
(inches)
|
Base Course
(inches)
|
Surface Course
(inches)
|
---|---|---|---|---|
Driveways and parking areas (nonresidential)
|
Yes
|
4
|
4 1/2 of 25-mm PG64-22
|
1 1/2 of bituminous material1
|
Driveways and parking areas (residential)
|
Yes
|
No
|
6 of 2A material
|
4 of bituminous material2
|
Bituminous sidewalk
|
Yes
|
No
|
4 of 2A material
|
4 of bituminous material2
|
Concrete sidewalk
|
Yes
|
No
|
4 of 2B stone
|
4 of Class A Concrete
|
Pedestrian trail
|
Yes
|
No
|
6 of 2A material3
|
2 of bituminous material1
|
NOTES:
| |
1
|
One and one-half inches of 9.5-mm, PG64-22 wearing course (0.3
to 3.0 million ESALs, SRL-H).
|
2
|
One and one-half inches of 9.5-mm, PG64-22 wearing course (0.3
to 3.0 million ESALs, SRL-H) on 2 1/2 inches of 19-mm, PG64-22
binder course.
|
3
|
To be placed on a layer of geotextile material.
|
NOTE: The number of trips shall be determined using the Institute
of Transportation Engineers' (ITE) Trip Generation, latest edition.
|
Type
|
Size
|
---|---|
Street trees
|
3 inches to 3 1/2 inches' caliper at 6 inches above
grade
|
Evergreen trees
|
5 feet to 6 feet in height*
|
Deciduous shrubs
|
18 inches to 24 inches in height*
|
Evergreen shrubs
|
18 inches to 24 inches in height*
|
Evergreen shrubs, screens and buffers
|
2 1/2 feet to 3 feet in height*
|
NOTE:
| |
*
|
To meet standards as prescribed by the American Nursery Association.
|
Total Number of Lots/Dwelling Units
|
Number of Playfields
|
Number of Tot Lots*
|
Number of Basketball or Tennis Courts
|
---|---|---|---|
Nonresidential land development
|
**
|
**
|
**
|
2 to 19
|
**
|
**
|
**
|
20 to 49
|
1 and
|
1 and
|
0
|
50 to 99
|
2 and
|
2 and
|
0
|
100 to 149
|
3 and
|
3 and
|
1
|
150 to 199
|
4 and
|
4 and
|
2
|
200 to 249
|
5 and
|
5 and
|
2
|
250 to 299
|
6 and
|
6 and
|
3
|
300 to 349
|
7 and
|
7 and
|
3
|
350 to 400
|
8 and
|
8 and
|
4
|
NOTES:
| |
*
|
Where more than one tot lot is required, tot lots may be combined
to provide a larger structure with additional play events, when approved
by the Borough.
|
**
|
The type of recreational area required shall be determined by
the Borough after discussion with the applicant and the Public Works
Committee.
|