[CC 2010 § 13.100; Ord. No. 591, 6-25-2001; Ord. No. 712, 2-22-2010]
For the purposes of this Chapter, the following words and/or phrases will have the meanings indicated below:
MANUFACTURED HOME
Any mobile home or other residential structure which:
1. 
Is factory built; or
2. 
When in the traveling mode, is eight (8) feet or more in width or forty (40) feet or more in length; or
3. 
When erected on site, contains three hundred twenty (320) or more square feet of floor space and is equipped with necessary service connections and is made so as to be readily movable as a unit on its own running gear and designed to be used as a single-family dwelling unit or units with or without a permanent foundation.
[CC 2010 § 13.105; Ord. No. 591, 6-25-2001; Ord. No. 712, 2-22-2010]
It shall be unlawful for any persons to place or maintain a manufactured home at any location within the City of Sturgeon, Missouri, except within an area specifically zoned by City codes for the placement and maintenance of manufactured homes.
[CC 2010 § 13.110; Ord. No. 591, 6-25-2001; Ord. No. 599, 1-28-2002; Ord. No. 712, 2-22-2010]
Any manufactured home established prior to the effective date of this Chapter in an area not zoned for manufactured homes shall be permitted to remain and may be maintained at such established locations, so long as such non-conforming use shall continue uninterrupted; provided, however, that no enlargement of such structure shall be permitted.
[CC 2010 § 13.115; Ord. No. 599, 1-28-2002; Ord. No. 591, 6-25-2001; Ord. No. 712, 2-22-2010]
A. 
The owner of such preexisting, non-conforming manufactured home shall be permitted to replace such non-conforming unit with another manufactured home, provided that:
1. 
The replacement unit is no more than seven (7) years old according to its manufactured date.
2. 
A building permit is obtained from the appropriate authority conducting the inspection.
3. 
The replacement unit is set and located in such a way that it will comply with any and all setback requirements and building codes within the City zoning codes.
4. 
The replacement unit has been built in accordance with a recognized building code.
5. 
The elapsed time from when the old unit is removed from its original position to when the replacement unit has been set in place shall not exceed sixty (60) days. A final building inspection (final occupancy permit) shall be issued within one hundred (100) days.
[Ord. No. 818, 8-25-2014]
6. 
Foundation standards will be set according to the specification of the appropriate authority conducting the inspections.
7. 
The minimum square footage of the replacement unit shall be at least nine hundred sixty (960) square feet or larger.
[CC 2010 § 13.120; Ord. No. 712, 2-22-2010]
Any existing code or codes in conflict with this Chapter is hereby amended to conform to this Chapter.
[CC 2010 §§ 13.125, 25.450]
Violation of this Chapter shall constitute an ordinance violation punishable as set forth in Section 100.220 of this Code.