New Impervious Area1, 2
(square footage)
|
Applicant Must Provide
|
---|---|
0 to 2,500
|
No submission
|
2,500 to 5,000
|
Documentation of impervious surfaces (small project SWM application)3
|
Greater than 5,000
|
Rate controls, volume controls and SWM site plan
|
NOTES:
| |
1
|
New impervious area since the date of adoption of this chapter
|
2
|
Gravel in existing condition shall be considered pervious and
gravel in proposed condition shall be considered impervious
|
3
|
The first page of the small project stormwater management application
included in Appendix E[2] may be used to document new impervious surfaces
|
Pollutant Load
|
Units
|
Required Reduction
Percent
|
---|---|---|
Total suspended solids (TSS)
|
Pounds
|
85%
|
Total phosphorous (TP)
|
Pounds
|
85%
|
Total nitrate (NO3)
|
Pounds
|
50%
|