A. 
Easements shall be established to accommodate the existence of drainageways.
B. 
Where a tract is traversed by a watercourse, drainageway, channel or stream, there shall be provided an easement paralleling the line of such watercourse, drainageway, channel or stream with a width adequate to preserve the unimpeded flow of natural drainage in the 100-year floodplain.
C. 
Easements shall be established for all on-site stormwater management or drainage facilities (except where the single-family residential exemption applies), including, but not limited to, detention facilitates (above- or below-ground), infiltration facilities, all stormwater BMPs, drainage swales, and drainage facilities (inlets, manholes, pipes, etc.).
D. 
Easements are required for all areas used for off-site stormwater control.
E. 
All easements shall be a minimum of 20 feet wide and shall encompass the 100-year surface elevation of the proposed stormwater facility.
F. 
Easements shall provide ingress to, and egress from, a public right-of-way. In lieu of providing an easement to the public right-of-way, a note may be added to the plan granting the Township or their designees access to all easements via the nearest public right-of-way able for vehicle ingress and egress on grades of less than 10% for carrying out inspection or maintenance activities.
G. 
Where possible, easements shall be centered on side and/or rear lot lines.
H. 
Nothing shall be planted or placed within the easement which would adversely affect the function of the easement, or conflict with any conditions associated with such easement.
I. 
All easements shall be shown on the subdivision plan, as applicable. Applicable subdivision plans shall be recorded prior to any land development occurring.
J. 
All easement agreements shall be recorded with a reference to the recorded easement indicated on the site plan. The format and content of the easement agreement shall be reviewed by the Township Engineer and Solicitor.
K. 
Existing waterbodies or watercourses. Where a subdivision or land development is traversed by or contains a pond, lake, watercourse, drainage way, channel, storm drainage system, or stream, there shall be provided a drainage easement that conforms substantially with the line of such pond, lake, watercourse, drainage way, channel, storm drainage system, stream, of such width as will be adequate to preserve the unimpeded flow of drainage and to provide for widening, deepening, relocating, improving or protecting such features or drainage facilities. Minimum easement width shall be 10 feet from each side of the watercourse, waterbody, stream, pond or lake, but the Township may require a greater easement as may be determined by the Township.