[Ord. No. 668 § 4; Ord. No. 767 § 2; Ord. No. 911 § 1]
a. 
The fee to review plans to locate and construct, or alter, an individual sewage disposal system shall be there hundred ($300.00) dollars.
b. 
The fee to review a design change with respect to an original permit shall be one hundred ($100.00) dollars.