SWM BMPs should be inspected by the landowner, or the owner's
designee (including East Hanover Township for dedicated and owned
facilities), according to the following list of minimum frequencies:
A. Annually for the first five years following construction.
B. Once every three years thereafter.
C. During or immediately after the cessation of a ten-year or greater
storm.