The low-impact development practices provided in the BMP Manual
shall be utilized for all regulated activities to the maximum extent
practicable. Water volume controls shall be implemented using the
Design Storm Method in Subsection A or the Simplified Method in Subsection
B below. For regulated activity areas equal to or less than one acre
that do not require hydrologic routing to design the stormwater facilities,
this chapter establishes no preference for either methodology; therefore,
the applicant may select either methodology on the basis of economic
considerations, the intrinsic limitations on applicability of the
analytical procedures associated with each methodology, and other
factors.
A. The Design Storm Method (CG-1 in the BMP Manual) is applicable to
any size of regulated activity. This method requires detailed modeling
based on site conditions.
(1) Do not increase the postdevelopment total runoff volume for all storms
equal to or less than the two-year twenty-four-hour duration precipitation.
(2) For modeling purposes:
(a)
Existing (predevelopment) nonforested pervious areas must be
considered meadow in good condition.
(b)
Twenty percent of existing impervious area, when present, shall
be considered meadow in good condition in the model for existing conditions.
B. The Simplified Method (CG-2 in the BMP Manual) provided below is
independent of site conditions and should be used if the Design Storm
Method is not followed. This method is not applicable to regulated
activities greater than one acre or for projects that require design
of stormwater storage facilities. For new impervious surfaces:
(1) Stormwater facilities shall capture at least the first two inches
of runoff from all new impervious surfaces.
(2) At least the first one inch of runoff from new impervious surfaces
shall be permanently removed from the runoff flow, i.e., it shall
not be released into the surface waters of this commonwealth. Removal
options include reuse, evaporation, transpiration, and infiltration.
(3) Wherever possible, infiltration facilities should be designed to
accommodate infiltration of the entire permanently removed runoff;
however, in all cases at least the first 0.5 inch of the permanently
removed runoff should be infiltrated.
(4) This method is exempt from the requirements of §
17-304, Rate controls.