The fee required by this chapter is the Brady Township review
fee. The Brady Township review fee shall be established by Brady Township
to defray review costs incurred by Brady Township and Brady Township's
Engineer. The applicant shall pay all fees.
The fees required by this chapter shall, at a minimum, cover:
A. Administrative and clerical costs.
B. Review of the SWM site plan and report by Brady Township.
C. Preconstruction meetings.
D. Inspection of stormwater management facilities/BMPs and drainage
improvements during construction.
E. Final inspection upon completion of the stormwater management facilities/BMPs
and drainage improvements presented in the SWM site plan.
F. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and assure proper completion
of stipulated remedial actions.