[1983 Code § 155-8]
As used in this article:
BUILDING
Any building or structure heretofore or hereafter constructed
and designed or used for dwelling purposes, either temporary or permanent,
or other use or occupancy by persons.
CONNECTION DATE
When used with respect to a building constructed prior to
the date of initial operation, as a part of any sanitary sewage treatment
and disposal system in the Borough owned or operated by the Borough
or the Pompton Lakes Borough Municipal Utilities Authority, of a sewer
in the public street, easement or right-of-way upon which said building
is located, the 120th day next ensuing after said date of initial
operation; and when used with respect to a building constructed after
the date of initial operation, as a part of any sanitary sewage treatment
and disposal system owned or operated by the Borough or said Authority,
of a sewer in the public street, easement or right-of-way upon which
said building is located, "construction date" shall mean the 60th
day after the date of completion of construction or the date of initial
occupancy of said building, whichever of said dates shall be earlier
in point of time.
SEWER
Any sewer or main designed or used for collection or disposal
of sanitary sewage and located in any public street, easement or right-of-way
in the Borough.
[1983 Code § 155-9]
The owner of any building located upon any public street in
the Borough in which a sewer is now constructed or shall be hereafter
constructed shall, prior to the connection date with respect to the
building, install a toilet in the building unless a toilet is then
installed therein and connect such building and every toilet therein
with the sewer.
[1983 Code § 155-11]
If the owner of any property in the Borough shall fail to make
any connection or installation required by this article within the
time herein required, the Borough may proceed to make such connection
or installation or cause the same to be made and charge and assess
the cost thereof against such property.