The UDCB permit application shall be made on a form provided
by the Borough. All applications shall be filed with the Borough at
its administrative offices. The Borough Manager shall direct the applications
to the Building Code Official. Applications shall include:
A. A signed agreement stating that the parcel owner/agent and operator
will abide by all the processes and requirements described in this
chapter;
B. A nonrefundable application fee in an amount set by separate resolution
of Borough Council (i.e., as set forth in the Borough's fee schedule);
C. A signed authorization from the parcel owner/agent to allow placement
of the UDCB;
D. A signed acknowledgement of responsibility from the parcel owner/agent
and the operator for joint and several liability for violations of
conditions or regulations, and/or nuisance conditions and/or blight
relating to the UDCB;
E. Proof of general liability insurance of at least $1,000,000 covering
the applicant's UDCB and naming the Borough of New Britain as
an additional insured;
F. For nonprofit operators, evidence that the nonprofit has been registered
as a nonprofit organization with the Commonwealth of Pennsylvania,
Department of State, and is recognized by the Internal Revenue Service
as such;
G. Name and telephone number of any entity that may share or profit
from items collected via the UDCB;
H. The name, address, email, website (if available) and telephone number
of the UDCB operator and parcel owner, including twenty-four-hour
contact information;
I. A vicinity map showing 1) the proposed location of the UDCB; and
2) the distance between the site and all existing UDCBs within 1,000
feet of the proposed UDCB location;
J. Photographs of the location and adjacent properties;
K. A site plan containing:
(1)
Location and dimensions of all parcel boundaries;
(2)
Location of all buildings;
(4)
Distance between the proposed UDCB and parcel lines and/or buildings;
and
(5)
Location and dimension of all existing and proposed driveways,
garages, carports, parking spaces, maneuvering aisles, pavement and
striping/marking.
L. Elevations showing the appearance, materials, and dimensions of the
UDCB, including the information required in this chapter to be placed
on the UDCB and notice sign;
M. A description and/or diagram of the proposed locking mechanism of
the UDCB;
N. A maintenance plan (including graffiti removal, pick-up schedule,
and litter and trash removal on and around the UDCB) that is sufficient
to prevent/eliminate nuisance and/or blight-related conditions; and
O. Any other reasonable information regarding time, place, and manner
of UDCB operation, placement, and/or maintenance that the Building
Code Official requires to evaluate the proposal consistent with the
requirements of this chapter.
The Building Code Official shall not issue a UDCB permit or
renewal unless each of the following is true:
A. The applicant has submitted a complete and accurate application accompanied
by the applicable fee.
B. There are no open citations, unpaid fines or unresolved violations
or complaints related to any UDCB managed by the proposed operator.
C. All existing unpermitted UDCBs that are managed by the proposed operator
have been removed.
D. Any verified nuisance or blight conditions on the subject property
has been abated and any case of a complaint to the Borough regarding
nuisance or blight conditions on the subject property has been closed.
E. The proposal is consistent with all the requirements of this chapter.
F. The site does not have a history of three verified nuisance and/or
blight complaints in the previous 12 months.
The Building Code Official shall provide a written decision
regarding the placement of a UDCB within 60 days of the submission
of a complete application for a UDCB permit.