A. 
Any UDCB scheduled to be removed shall clearly display a notice on the UDCB with at least four-inch type visible from the front on the UDCB that states the following text in capital letters: "THIS BOX WILL BE REMOVED BY" followed by the date the UDCB is scheduled for removal. The operator and property owners are jointly and severally responsible for the placement of the notice.
B. 
For UDCBs required to be removed by the Borough due to an abatement order, the notice shall be posted immediately after the Borough notifies the operator and/or parcel owner that the facility is required to be removed.
C. 
Notice that a UDCB will be removed by the owner or operator shall be posted at least 14 calendar days prior to the removal of the facility, or as otherwise provided by an abatement order of the Borough.