At all construction sites within the corporate boundary of the Village of Tilton, the contractor shall plan and execute construction and earthwork in a manner to control surface drainage to prevent erosion and sedimentation from cuts and fills and borrow and waste disposal areas. The contractor shall also provide temporary control measures such as berms, dikes and drains as necessary. The contractor shall also provide temporary control measures to prevent silting or runoff of silt or sediment to the maximum extent practicable from the site. All construction and earthwork shall be in accordance with the latest edition of the Illinois Environmental Protection Agency Standards for Soil Erosion and Sediment Control. The contractor shall also provide all means necessary to prevent erosion, loss of topsoil and grass seed, etc. from all construction sites by implementing an erosion and sediment control plan, per recommendations detailed in the Illinois Urban Manual, Natural Resources Conservation Service (NRCS), and the Illinois Environmental Protection Agency Standards for Soil Erosion and Sediment Control. The erosion and sediment control plan shall be reviewed with the engineer and the owner prior to the initiation of construction.
[Adopted as Ch. 13.12 of the Village Code; amended in its entirety 3-20-2014]
The purpose of this article is to control or eliminate soil erosion and sedimentation within the Village of Tilton. It establishes standards and specifications for conservation practices and planning activities which minimize soil erosion and sedimentation.
This article controls land disturbances, soil storage and establishes procedures for issuance, approval, administration and enforcement of the requirements of the Village's NPDES Permit for Stormwater Discharges.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
For the purposes of this article, the following terms, phrases, words and their derivatives shall have the meanings stated below:
APPLICANT
Any person who submits an application to the Village for a permit pursuant to this article.
ARCHITECT
A person duly registered or authorized to practice architecture in the State of Illinois.
BEDROCK
In-place solid rock.
BEST MANAGEMENT PRACTICES (BMP)
Schedules of activities, prohibitions of practices, maintenance procedures, techniques proven to be effective to prevent or reduce the discharge of pollutants to the municipal separate storm sewer system. BMPs also include treatment requirements, operating procedures and practices to control plan site run-off, spillage or leaks, sludge or waste disposal or drainage from raw material storage.
BORROW
Earthen material acquired from an off-site location for use in grading on a site.
CIVIL ENGINEER
A professional engineer registered in the State of Illinois to practice in the field of civil works.
CLEARING AND GRUBBING
Cutting and removal of trees, shrubs, bushes, windfalls and other vegetation, including removal of stumps, roots and other remains in the designated areas. Typically, "clearing" refers to removal of vegetation and disturbance of soil prior to grading or excavation in anticipation of construction activities. "Clearing" may also refer to wide-area land disturbance in anticipation of non-construction activity.
COMMENCEMENT OF CONSTRUCTION or COMMENCEMENT OF LAND-DISTURBING ACTIVITIES
The initial disturbance of soils associated with clearing, grubbing, grading or excavation activities or other construction activity.
CONSTRUCTION
Any placement, assembly or installation of facilities or equipment (including contractual obligations to purchase such facilities or equipment) at the premises where such equipment will be used, including preparation work at such premises.
DEMOLITION
Any act or process of wrecking or destroying a building or structure.
DETENTION FACILITY
A temporary or permanent natural or man-made structure that provides for the temporary storage of stormwater runoff.
DEVELOPER
Any person, firm, corporation, sole proprietorship, partnership, state agency or political subdivision engaged in a land disturbance activity.
DEVELOPMENT
Any man-made change to improved or unimproved property, including, but not limited to, construction of building or other structures, clearing, dredging, drilling operations, filling, grading, paving, excavation or storage of equipment or materials.
EROSION
Wearing away of the ground surface as a result of the movement of wind, water, ice, land disturbance activities and/or other agents, whether naturally occurring or acting in conjunction with or promoted by man-made activities or effects.
EROSION AND SEDIMENT CONTROL PLAN
A written plan (including drawings or other graphic representations) that is designed to eliminate and/or reduce erosion and off-site sedimentation from a site during construction activities. Plan includes a set of best management practices or equivalent measures designed to control surface runoff and erosion and to retain sediment on a particular site during the period in which pre-construction and construction-related land disturbance, fills and soils storage occur, and before final improvements are completed, all in accordance with the specific requirements set forth in § 134-11.
EROSION CONTROL INSPECTOR
The Village official who is appointed by the Village Board to inspect sites for erosion control compliance.
EXCAVATION
Mechanical removal of earth material.
FILL
A deposit of dirt, rock, natural material or man-made solids placed by artificial means.
FINAL EROSION AND SEDIMENTATION CONTROL PLAN (FINAL PLAN)
Plan which includes permanent measures and best management practices to control surface runoff and control sediment if not included in the erosion and sedimentation plan.
FINAL STABILIZATION
When all soil-disturbing activities at the site have been completed, and perennial vegetation cover sufficient to prevent erosion has been well established on all unpaved areas, or when equivalent permanent stabilization measures have been employed.
FLOODPLAIN
The 100-year floodplain, which is that area adjoining a watercourse which could be inundated by a flood that has a 1% chance of being equaled or exceeded in any given year and is delineated on the most recent revision of the Federal Emergency Management Agency Floodway Maps for Tilton.
GRADE
The vertical location of the ground surface.
A. 
EXISTING GRADEThe grade prior to grading.
B. 
ROUGH GRADEThe stage at which the grade approximately conforms to the approved plan.
C. 
FINISH GRADEThe final grade of the site which conforms to the approved plan.
GRADING
Any excavation, filling (including hydraulic fill) or stockpiling of earth materials or any combination thereof, including the land in its excavated or filled condition.
IDOT
The Illinois Department of Transportation.
IEPA
The Illinois Environmental Protection Agency.
ISSUING AUTHORITY
The Village of Tilton Village official and their duly authorized designees.
LAND DISTURBANCE ACTIVITY
Any land change that may result in soil erosion from wind, water and/or ice and the movement of sediments into or upon waters, lands or rights-of-way within the Village of Tilton, including but not limited to building demolition, clearing and grubbing, grading, excavating, transporting and filling of land. Land disturbance activity does not include the following:
A. 
Minor land disturbance activities, including, but not limited to, underground utility repairs, home gardens, minor repairs and maintenance work which do not disturb more than 500 square feet of land.
B. 
Installation of fence, sign, telephone and electric poles and other kinds of posts or poles.
C. 
Emergency work to protect life, limb or property and emergency repairs. If the land-disturbing activity would have required an approved erosion and sediment control plan except for the emergency, then the land area disturbed shall be shaped and stabilized in accordance with the requirements of this article.
LANDSCAPE ARCHITECT
A person duly registered or authorized to practice landscape architecture in the State of Illinois.
MAINTENANCE PROJECT
A non-construction-related activity.
MANUAL OF STANDARDS
A compilation of technical standards and design specifications adopted by the Village of Tilton as being proven methods of controlling construction-related surface runoff, erosion and sedimentation. This includes the Illinois Urban Manual, NRCS, Illinois Environmental Protection Agency Standards for Soil Erosion and Sediment Control.
MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4)
A conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels or storm drains) that is:
A. 
Owned or operated by a state, city, town, borough, county, district, association or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or a designated and approved management agency that discharges waters of the state;
B. 
Designed or used for collecting or conveying stormwater;
C. 
Not a combined sewer; and
D. 
Not part of a publicly owned treatment works (POTW).
OWNER
Any person with a legal or equitable interest in the land for which an erosion control permit has been issued.
OWNER or OPERATOR
Any party associated with a construction project that meets either of the following two criteria:
A. 
The party has operation control over construction plans and specifications, including the ability to make modifications to those plans and specifications (this will typically be the owner or developer); or
B. 
The party has day-to-day operational control of those activities at a project which are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other permit conditions; e.g., the party is authorized to direct workers at a site to carry out activities required by the SWPPP or comply with other permit conditions. (This will typically include a general contractor and would also include erosion control contractors.)
PERMITTEE
The applicant in whose name a valid permit is duly issued pursuant to this article and his/her agents, employees and others acting under his/her direction.
PLAN
An erosion and sediment control plan or a small-lot erosion and sediment control plan.
RUNOFF
Rainfall, snowmelt or irrigation water flowing over the ground surface.
SEDIMENT
Soils or other superficial materials transported by surface water as a product of erosion.
SEDIMENTATION
The process or action of deposition of sediment that is determined to have been caused by erosion.
SITE
The entire area of land on which the land disturbance activity is proposed in the permit application.
SITE PLAN
A plan or set of plans showing the details of any land disturbance activity of a site, including but not limited to the construction of: structures, open and enclosed drainage facilities, stormwater management facilities, parking lots, driveways, curbs, pavements, sidewalks, bike paths, recreational facilities, ground covers, plantings and landscaping.
SLOPE
The incline of a ground surface expressed as a ratio of horizontal distance to vertical distance.
SOIL
Naturally occurring superficial deposits overlying bedrock.
SOILS ENGINEERING (GEOTECHNICAL ENGINEERING)
The application of the principles of soils mechanics in the investigation, evaluation and design of civil works involving the use of earth materials and the inspection and/or testing of the construction thereof.
STRIPPING
Any activity which removes or significantly disturbs the vegetative surface cover, including clearing, grubbing of stumps and root mat and topsoil removal.
STRUCTURE
Anything manufactured, constructed or erected which is normally attached to or positioned on land, including buildings, portable structures, earthen structures, roads, parking lots and paved storage areas.
SURVEYOR
A person duly registered or authorized to practice land surveying in the State of Illinois.
TOPSOIL
The upper layer of soil.
UTILITY
The owner/operator of any underground facility, including an underground line, facility, system and its appurtenances used to produce, store, convey, transmit or distribute communications, data, electricity, power, heat, gas, oil, petroleum products, water, including stormwater, steam, sewage and other similar substances.
VILLAGE ENGINEER
A professional engineer registered in the State of Illinois to practice in the field of civil works and designated by Village authorities to act on its behalf.
WATERCOURSE
Any natural or improved stream, river, creek, ditch, channel, canal, conduit, gutter, culvert, drain, gully, swale or wash in which waters flow either continuously or intermittently.
WETLANDS
A lowland area, such as a marsh, that is saturated with moisture, as defined in Section 404 of the Federal Water Pollution Control Act Amendments of 1987.
Neither this article nor any administrative decision made under it exempts the permittee or any other person from procuring other required permits or complying with the requirements and conditions of such a permit, or limits the right of any person to maintain, at any time, any appropriate action, at law or in equity, for relief or damages against the permittee or any other person arising from the activity regulated by this article.
The following activities are exempt from obtaining a permit and from following the procedures required in this article:
A. 
Cemetery graves.
B. 
Emergencies posing an immediate danger to life or property, or substantial flood or fire hazards.
C. 
Any activity where the total volume of material disturbed, stored, disposed of or used as fill does not exceed five cubic yards or the area disturbed does not exceed 500 square feet, provided it does not obstruct a watercourse and is not located in a floodplain.
A. 
All land-disturbing or land-filling activities or soil storage, whether pursuant to this article or otherwise, shall be undertaken in a manner designed to minimize surface runoff, erosion and sedimentation. Whenever the issuing authority determines that any land-disturbing activity on any private property has become a hazard to life and limb, or endangers the property of another or adversely affects the safety, use, slope or soil stability of a public way, publicly controlled wetland or watercourse, then the owner of the property upon which the land-disturbing activity is located, or other person or agent in control of said property, upon receipt of notice in writing from the issuing authority, shall within the period specified therein repair or eliminate such conditions.
B. 
Exempt activities under § 134-6 or the activities excluded under the definition of land disturbance activities under § 134-4 are also subject to the provisions of this section. If the Village incurs costs to enforce the provisions of the section because of any activity listed in § 134-6, reimbursement of Village costs associated with the correction work completed by the Village must occur prior to the issuance of a letter certifying completion, when required under § 134-33.
A construction project shall be considered in conformance with this article if soils have been prevented from being deposited onto adjacent properties, rights-of-way, public storm drainage systems, or a wetland or watercourse. The design, testing, installation and maintenance of erosion and sediment control operations and facilities shall adhere to the standards and specifications contained in the Manual of Standards/Erosion Control Standard, which shall be hereby incorporated into this article. In the event of conflict between provisions of said manual and of this article, this article shall govern. A copy of the Manual of Standards and amendments shall be filed with the Village official.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
A written application from the owner of the site, or his/her authorized representative, in the form prescribed by § 134-11, shall be required for each permit. The fees for said permit shall be set from time to time by the Board of Trustees. Plans and specifications shall be prepared or approved and signed by a civil engineer or landscape architect. The Village Engineer may waive the preparation or approval and signature by the civil engineer or landscape architect when it is self-evident that the work is simple, clearly shown and entails no hazard or nuisance potential to adjacent property or watercourses, and does not include the placement of fill upon which a structure may be erected.
The following information is required on the application:
A. 
Name, address and telephone number of owner.
B. 
Name, address and telephone number of applicant, if different than owner.
C. 
Names, addresses and telephone numbers of any and all contractors, subcontractors or persons actually doing the land-disturbing or land-filling activities and their respective tasks.
D. 
Name(s), address(es) and telephone number(s) of the person(s) responsible for the preparation of the site map and grading plan.
E. 
Name(s), address(es) and telephone number(s) of the person(s) responsible for the preparation of the erosion and sediment control plan.
F. 
Name(s), address(es) and telephone number(s) of the registered engineer(s) responsible for the preparation of the soils engineering and engineering geology reports, where required.
G. 
Address of site.
H. 
Date of application.
I. 
Signature(s) of the owner(s) of the site or an authorized representative.
Land disturbance activities which are in excess of one acre area of earth moved require an erosion and sedimentation control plan approved by the Village official. These plans shall be drawn to an appropriate scale and shall include sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed grading on water resources and measures proposed to minimize soil erosion and off-site sedimentation. The owner/developer shall perform all clearing, grading, drainage, construction and development in strict accordance with the approved plan. In addition, the following information shall be included in any plan:
A. 
A letter of transmittal, which includes a project narrative.
B. 
An attached vicinity map showing the location of the site in relationship to the surrounding area's watercourses, water bodies and other significant geographic features, and roads and other significant structures.
C. 
An indication of the scale used.
D. 
The name, address and telephone number of the owner and/or developer of the property where the land-disturbing activity is proposed.
E. 
Suitable contours for the existing and proposed topography.
F. 
The proposed grading or land disturbance activity, including the surface area involved, excess spoil material, use of borrow material and specific limits of disturbance.
G. 
A clear and definite delineation of any areas of vegetation or trees to be saved.
H. 
A clear and definite delineation of any wetlands, natural or artificial water storage detention areas and drainage ditches on the site.
I. 
A clear and definite delineation of any 100-year floodplain on or near the site.
J. 
Storm drainage system, including quantities of flow and site conditions around all points of surface water discharge from the site.
K. 
Erosion and sediment control provisions to minimize on-site erosion and prevent off-site sedimentation, including provisions to preserve topsoil and limit disturbance.
L. 
Design details for both temporary and permanent erosion control structures.
M. 
Details of temporary and permanent stabilization measures, including a construction note on the plan stating: "Following initial soil disturbance or redisturbance, permanent or temporary stabilization shall be completed within seven calendar days on all perimeter dikes, swales, ditches, perimeter slopes and all slopes greater than three horizontal and one vertical (3:1); embankments of ponds, basins and traps; and within 14 days on all other disturbed or graded areas. The requirements of this section do not apply to those areas which are shown on the plan and are currently being used for material storage or for those areas on which actual construction activities are currently being performed."
N. 
A chronological construction schedule and time frame, including, as a minimum, the following activities:
(1) 
Clearing and grubbing for those areas necessary for installation of perimeter erosion control devices.
(2) 
Construction of perimeter erosion control devices.
(3) 
Remaining interior site clearing and grubbing.
(4) 
Installation of permanent and temporary stabilization measures.
(5) 
Road grading.
(6) 
Grading for the remainder of the site.
(7) 
Utility installation and whether storm drains will be used or blocked after construction.
(8) 
Building, parking lot and site construction.
(9) 
Final grading, landscaping or stabilization.
(10) 
Implementation and maintenance of final erosion control structures.
(11) 
Removal of temporary erosion control devices.
O. 
A statement noting that the contractor, developer and owner shall request the erosion control inspector to inspect and approve work completed in accordance with the approved erosion and sediment control plan, and in accordance with this article. The contractor, developer or owner shall be required to obtain written approval by the inspector at the stages of development as outlined in § 134-25A, B and C.
P. 
A signed statement on the plan by the owner, developer and contractor that any clearing, grading, construction or development, or all of these, will be done pursuant to the plan.
Q. 
The Village official may require any additional information or data deemed appropriate and/or may impose such conditions thereto as may be deemed necessary to ensure compliance with the provisions of this article, the Manual of Standards or the preservation of public health and safety.
R. 
A description of, and specifications for, sediment retention structures.
S. 
A description of, and specifications for, surface runoff and erosion control devices.
T. 
A description of vegetative measures.
U. 
The applicant may propose the use of any erosion and sediment control techniques in a final plan, provided such techniques are proven to be as effective as or more effective than the equivalent best management practices as contained in the Manual of Standards.
V. 
Proposed conditions of the site on the 15th of each month between and including the months of April through October.
A soils engineering report, when required by the Village Engineer, based upon his/her determination that the condition of the soils is unknown or unclear so that additional information is required to protect against erosion or other hazard, shall be based on adequate and necessary test borings and shall contain all the information listed below. Recommendations included in the report and approved by the Village Engineer shall be incorporated in the grading plans and/or specifications.
A. 
Data regarding the nature, distribution, strength and erodibility of existing soils.
B. 
If applicable, data regarding the nature, distribution, strength and erodibility of soil to be placed on the site.
C. 
Conclusions and recommendations for grading procedures.
D. 
Conclusions and recommended designs for interim soil stabilization devices and measures, and for permanent soil stabilization after construction is completed.
E. 
Design criteria for corrective measures when necessary.
F. 
Opinions and recommendations covering the stability of the site.
When deemed necessary by the Village Engineer, based upon his/her determination that the condition of the soils is unknown or unclear so that additional information is required to protect against erosion or other hazard, an engineering geology report shall be provided based on adequate and necessary test boring, giving an adequate description of the geology of the site with conclusions and recommendations regarding the effect of geologic conditions on the proposed development, and giving opinions and recommendations covering the adequacy of sites to be developed by the proposed land-disturbing activity. Recommendations included in the report and approved by the Village Engineer shall be incorporated in the grading plans and/or specifications.
When not submitted as part of a plan the applicant shall submit to the Village Engineer a master work schedule showing the following information:
A. 
Proposed grading schedule.
B. 
Proposed schedule for installation of all erosion and sediment control measures, including, but not limited to, the stage of completion of erosion and sediment control devices and vegetative measures.
C. 
Schedule for construction of final improvements, if any.
D. 
Schedule for installation of permanent erosion and sediment control devices where required.
Except as otherwise provided in this article, no person may grade, fill, excavate, store, stockpile or dispose of earth materials or perform any other land-disturbing or land-filling activity without first obtaining an erosion and sediment control permit from the Village official. Annual maintenance permits are available for maintenance projects greater than one acre area.
Permits issued under this article shall be valid for the period during which the proposed land-disturbing or -filling activities and soil storage takes place or is scheduled to take place, whichever is shorter, but in no event shall such a permit be valid for more than one year. The permittee shall commence permitted activities within 180 days of the scheduled commencement date for grading or the permittee shall resubmit all required application forms, maps, plans and schedules to the issuing authority, except where an item to be resubmitted is waived by the issuing authority.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
The permittee shall fully perform and complete all of the work required in the sequence shown on the plans within the time limit specified in the permit. Prior to the expiration of an erosion and sediment control permit, the permittee may present a written request for an extension to the Village official. If, in the opinion of the issuing authority, an extension is warranted, a one-time no-fee extension, not to exceed 90 days, may be granted. The issuing authority may authorize additional extensions not to exceed a total of one year at the rate set from time to time by the Board of Trustees.
If the issuing authority determines that the erosion and sediment control plan does not meet the requirements of this article, he/she shall not issue a permit for the land-disturbing activity. The erosion and sediment control plan must be resubmitted for approval before the land disturbance activity begins. All land use and building permits must be suspended until the permittee has an approved erosion and sediment control plan.
In granting any permit pursuant to this article, the issuing authority many impose such conditions as may be reasonably necessary to prevent creation of a nuisance or unreasonable hazard to persons or to a public or private property. Such conditions shall include (even if not specifically written in the permit), but need not be limited to:
A. 
The granting (or securing from others) and the recording in county land records of easements for drainage facilities, including the acceptance of their discharge on the property of others, and for the maintenance of slopes or erosion control facilities.
B. 
Adequate control of dust by watering, or other control methods acceptable to the issuing authority, and in conformance with applicable air pollution ordinances.
C. 
Improvements of any existing grading, ground surface or drainage condition on the site (not to exceed the area as proposed for work or development in the application) to meet the standards required under this article for new grading, drainage and erosion control.
D. 
Sediment traps and basins located within a densely populated area or in the proximity of an elementary school, playground or other area where small children may congregate without adult supervision may be requested to install additional safety-related devices.
The permittee is responsible for safely and legally completing the project. Neither the issuance of a permit under the provisions of this article nor the compliance with the provisions hereof or with any condition imposed by the issuing authority shall relieve any person from responsibility for damage to persons or property resulting therefrom, or as otherwise imposed by law, nor impose any liability upon the Village for damages to persons or property.
The permittee shall maintain a copy of the permit, approved plans and reports required under the permit on the work site and available for public inspection during all working hours. The permittee shall, at all times, be in conformity with the approved grading plan, erosion and sediment control plans and also conform to the following:
A. 
General. Notwithstanding other conditions or provisions of the permit, or the minimum standards set forth in this article, the permittee is responsible for the prevention of damage to adjacent property. No person shall grade on land in any manner or so close to the property line as to endanger or damage any adjoining public street, sidewalk, alley or any other public or private property without supporting and protecting such property from settling, cracking, erosion, sedimentation or other damage or personal injury which might result.
B. 
Public ways. The permittee shall be responsible for the prompt removal of and the correction of damages resulting from any soil, miscellaneous debris or other materials washed, spilled, tracked, dumped or otherwise deposited on public streets, highways, sidewalks or other public thoroughfares, incident to the construction activity, or during transit to and from the construction site.
The issuance of an erosion and sediment control permit shall constitute an authorization to do only that work described in the permit, or shown on the approved site plans and specifications, all in strict compliance with the requirements of this article, unless each and every modification or waiver is specifically listed and given specific approval by the issuing authority.
The permittee, his/her agent, contractors and employees shall carry out the proposed work in accordance with the approved plans and specifications, and in compliance with all the requirements of the permit, including those documents referenced in § 134-8.
A. 
In the event work does not conform to the permit or to the plans and specifications or to any instructions of the issuing authority, notice to comply shall be given to the permittee in writing. After a notice to comply is given, in the determination of the issuing authority, the permittee or his/her contractor shall be required to make the corrections within the time period determined by the issuing authority. If an imminent hazard exists, the issuing authority may require that the corrective work begin immediately.
B. 
If the issuing authority finds any existing conditions not as stated in the application or approved plans, he/she may stop the work on the entire project or any specified part thereof until a revised plan is submitted conforming to the currently existing conditions.
C. 
Failure of the permittee to comply with the directives of this section will constitute a violation pursuant to § 134-30, and will be considered a nuisance pursuant to the laws of Illinois, and the issuing authority may cancel the permit and proceed with the necessary restoration of the site at the expense of the owner. The owner will be billed for the expenses incurred by the issuing authority. Failure to pay will result in the issuing authority seeking recovery of costs and damages pursuant to the conditions set forth in § 134-30.
All changes or modifications to the approved erosion and sediment control plans must adhere to the following conditions:
A. 
All proposals to modify the approved plans must be submitted to the Village official/Village Engineer for his/her approval. No grading or any type of work in connection with any proposed modification shall be without prior written approval of the issuing authority.
B. 
When inspection of a site indicates that the approved erosion and sediment control plan needs change, the change shall be in compliance with the erosion and sediment control criteria contained in the Manual of Standards. The Erosion Control Inspector may approve minor modifications to approved erosion and sediment control plans in the field if documented on a field inspection report. The modification shall be noted on the approved plan, signed by the Inspector, and dated. A list of allowable field modifications for use by field inspection personnel will be kept in the Manual of Standards.
C. 
The permittee shall submit requests for major revisions to approved erosion and sediment control plans, such as the addition or deletion of a sediment basin, to the Village Engineer. This includes revisions due to plan and site discrepancies and inadequacies at controlling erosion and sediment as revealed through inspection.
The contractor and/or their agents shall conduct a pre-construction meeting on-site with the issuing authority on each site which has an approved erosion and sediment control plan. After commencing initial grading or land-disturbing activities, the permittee shall obtain written inspection approvals (see attached inspection checklist[1]) by the issuing authority at the following stages in the development of the site, or of each subdivision thereof:
A. 
Upon completion of installation of perimeter erosion and sediment controls, prior to proceeding with any other land disturbances or grading. Other building or grading inspection approvals may not be authorized until initial approval by the Erosion Control Inspector is made.
B. 
Upon completion of stripping, the stockpiling of topsoil, the construction of temporary erosion and sediment control facilities, disposal of all waste material and preparation of the ground and completion of rough grading, but prior to placing topsoil, permanent drainage or other site development improvements and ground covers.
C. 
Upon completion of final grading, permanent drainage and erosion control facilities, including established ground covers and planting, and all other work of the permit. The issuing authority may require additional inspections as may be deemed necessary. Work shall not proceed beyond the stages outlined above until the Erosion Control Inspector inspects the site and approves the work previously completed. Requests for inspections shall be made at least 24 hours in advance (exclusive of Saturdays, Sundays and holidays) of the time the inspection is desired. Upon request for inspections, the issuing authority shall perform the inspection within 48 hours of request. In making application for a permit covered by this article, the applicant or the landowner performing or allowing such work consents to the issuing authority having the right to enter the site for the purpose of inspecting compliance with the erosion and sediment control plan or for performing any work necessary to bring the site into compliance with the erosion and sediment control plan. This does not include consent to enter but does include consent to inspect any area of the property where land-disturbing activity is occurring or is thought to be planned as a site of land-disturbing activity.
[1]
Editor's Note: The checklist is included as an attachment to this chapter.
The permittee shall submit written reports to the issuing authority under the following circumstances, along with recommendations for corrective measures, if deemed necessary and appropriate, with such reports unless the recommendation requirement is waived by the issuing authority:
A. 
There are delays in obtaining materials, machinery, services or manpower necessary to the implementation of the grading or erosion and sediment control plan as scheduled.
B. 
There are delays in land-disturbing or -filling activities or soil storage.
C. 
The work is not being done in conformance with the approved grading or erosion and sediment control plans.
D. 
There are any departures from the approved grading plan which may affect implementation of the erosion and sediment control plans as scheduled.
E. 
There are any delays in the implementation of erosion and sediment control plans.
F. 
There are any other departures from implementation of the erosion and sediment control plans.
On any property on which grading or other work has been done pursuant to a permit granted under the provisions of this article, the permittee or owner, their agent, contractor and employees shall, at a minimum, daily inspect, maintain and repair all graded surfaces and erosion control facilities, drainage structures or means and other protective devices, plantings and ground cover installed while construction is active. After construction is complete, the owner or their agent shall continue to regularly inspect the vegetation until adequate turf establishment or other suitable vegetative cover is established.
The issuing authority may require the posting of a surety bond in a form approved by the Village Attorney when, in the judgment of the issuing authority, the project provides potential for environmental damage. The bond shall be in such form and amount as is necessary to assure that the work, if not completed in accordance with the approved plans and specifications, will be corrected. In lieu of a surety bond, with the approval of the issuing authority, the applicant may file a cash bond or instrument of credit that has been approved by the Village Attorney in an amount equal to that which would be required in the surety bond.
The issuing authority shall be responsible for the enforcement of this article.
A. 
The issuing authority may post a stop-work order for the entire project or any specified part thereof if any of the following conditions exist:
(1) 
Any land disturbance activity regulated under this article is being undertaken without a permit.
(2) 
The erosion and sediment control plan is not being fully implemented.
(3) 
Any of the conditions of the permit are not being met.
B. 
For the purposes of this section, a stop-work order is validly posted by posting a copy of the stop-work order on the site of the land-disturbing activity in reasonable proximity to a location where the land-disturbing activity is taking place. Additionally, a copy of the order, in the case of work for which there is a permit, shall be mailed by first class mail, postage pre-paid, to the address listed by the permittee on the permit. In the case of work for which there is no permit, a copy of the order shall be mailed to the person listed as owner of the property by the Village official on the homestead record, or if none, to the taxpayer shown by the records of the Village official.
C. 
If the permittee does not cease the activity or comply with the erosion and sediment control plan or permit conditions within one day, the issuing authority may revoke the permit.
D. 
If the owner or land user where no permit has been issued does not cease the land disturbance activity, the issuing authority may request the Village Attorney to obtain injunctive relief.
E. 
The issuing authority may retract the revocation.
F. 
Ten days after posting a stop-work order, the issuing authority may issue a notice of intent to the permittee, owner or land user of the issuing authority's intent to perform work necessary to comply with this article. The issuing authority may go on the land and commence work after 14 days from issuing the notice of intent. The costs incurred by the issuing authority to perform this work shall be paid by the owner or permittee out of the bond referred to in § 134-29 of this article, to the extent that the amount is covered thereby, with the remainder being directly due and owing by the owner or permittee. In the event no permit was issued or no bond was posted, the cost, plus interest at the rated authorized by the issuing authority, plus a reasonable administrative fee shall be billed to the owner. If in any event the amount due is not paid, the Village Clerk shall enter the amount due on the tax roll and collect as a special assessment against the property using procedures for collecting the assessment, providing for the notice of assessment, hearing thereon and appeal as provided by the Illinois Compiled Statutes.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
G. 
Compliance with the provisions of this article may also be enforced by injunction.
H. 
A notice of intent to perform work necessary to comply with this article pursuant to Subsection F of this section may be served in the manner specified for a stop-work order in Subsection B.
[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
Any person, firm, corporation or agency acting as principal, agent, employee or otherwise, who or which fails to comply with the provisions of this article shall be guilty of a misdemeanor and upon conviction thereof shall be punishable by a fine of not less than $100 and not more than $750, or by imprisonment for not more than one year, or both, for each separate offense. Each day there is a violation of any part of this article shall constitute a separate offense.
Upon completion of the work, the issuing authority may require a report (including as-built construction plans) from a civil engineer, surveyor, architect or landscape architect certifying that all erosion and sediment control devices have been completed in accordance with the conditions of the permit and approved plans and specifications, and with specific listing of all approved changes and modifications.
Upon receipt and approval of the final reports, if required by § 134-32, and/or upon otherwise determining that all work of the permit has been satisfactorily completed in conformance with this article, the issuing authority will issue a letter certifying completion.