Application Fee
|
Minimum Starting Escrow
| |
---|---|---|
Informal concept plan, interpretation of Zoning Ordinance, appeal
from decision of Administrative Officer, request for extension of
time or any other application for which no specific fee or escrow
is established
|
$150
|
$750
|
Minor subdivision
|
$250
|
$250 per lot (minimum $1,000)
|
Preliminary major subdivision
|
$250
|
$1,000 per lot
|
Final major subdivision
|
$250
|
$1,000 per lot
|
Minor site plan or change of use
|
$250
|
$1,000
|
Sketch plat
|
Per lot $50
Minimum $2,500
| |
Preliminary major site plan
|
$300
|
$500/acre - minimum $1,500
|
Final major site plan
|
$300
|
$200/acre - minimum $1,000
|
Conditional use
|
$300
|
$500/acre - minimum $1,000
|
Rezoning or Master Plan amendment request
|
$300
|
$2,000
|
Submission of revised plans
|
—
|
1/4 of the required escrow
|
Residential (single- or two-family) bulk variance
|
$25
|
$400
|
Residential (single- or two-family) use variance
|
$25
|
$750
|
Nonresidential and multiunit residential use and bulk variances
|
$100
|
$1,000
|
Special meeting fee
|
$1,000
|
—
|
Sign application
|
$100
|
$300
|
200-foot list
|
$25
|
n/a
|
Site plan waiver
|
$200
|
$1,000
|
Preliminary major site plan, residential
| ||
Up to 50 units
|
$300
|
$2,500
|
51 to 100 units
|
$300
|
$3,500
|
101 to 500
|
$500
|
$10,000
|
Preliminary major site plan, nonresidential
| ||
Under 5,000 square feet of building space
|
$300
|
$2,500
|
From 5,001 to 10,000 square feet
|
$500
|
$3,500
|
Extension of preliminary or final site plan approval
|
$100
|
$500
|
Amended site plan
|
Original fee
|
Original escrow
|
Revised site plan
|
50% of original fee
|
50% of original fee
|
Building Subcode Fees
| |
---|---|
Description
|
Fees
|
Plan Review/Inspection
| |
Minimum fee for inspection/plan review, each subcode (building,
electric, plumbing, or fire)
|
$75
|
Plan review fee, percent of estimated amount charged for construction,
permit nonrefundable
|
20%
|
New Construction
| |
Use Groups A-5, E, H, 1-1, 1-2, 1-3, R-1, R-2, R-3, R-4, R-5
|
$0.0450
|
Use Groups A-1, A-2, A-3, A-4, B, F-1, F-2, S-1, S-2
|
$0.0320
|
Use Group: U
|
$0.0150
|
Exterior Additions
| |
Per cubic foot of building or structure volume
|
$0.038
|
Reconstruction, Renovations, Alterations, Repairs
| |
First $50,000 of estimated cost of work
|
$46
|
Next $50,000 of estimated cost of work
|
$35
|
Over $100,000 of estimated cost of work
|
$28
|
Minor Construction
| |
$34 per $1,000
| |
Roofing
| |
Roofing R3/R5
|
$75
|
Siding
| |
Siding R3/R5
|
$75
|
Fences
| |
New or replacement over 6 feet in height or required as a safety
barrier public or private per linear foot
|
$65
|
New or replacement over 6 feet in height or required as a safety
barrier public or private minimum fee
|
$65
|
Signs
| |
Sign minimum fee
|
$65
|
Per square foot of the surface area of the sign
|
$6
|
Satellite Dish, Radio or TV Antenna
| |
Satellite dish, radio or TV antenna
|
$175
|
Tents
| |
Tents larger than 900 square feet or exceeding 30 feet
|
$250
|
Tents less than 900 square feet
|
$175
|
Swimming Pools, Hot Tubs
| |
Aboveground
|
$150
|
In-ground
|
$225
|
Hot tub
|
$65
|
Temporary Inflatable Aboveground Pool
| |
Initial fee
|
$65
|
Annual reinspection fee (temporary portable/inflatable pools)
|
$23
|
Certificate of approval, temporary portable pools (including
inflatable pools)
|
$23
|
Asbestos Abatement
| |
Asbestos abatement
|
$176
|
Lead Hazard/Abatement
| |
Lead hazard/abatement
|
$176
|
Demolition
| |
Demolition for a structure less than 5,000 square feet, less
than 30 feet in height
|
$92
|
Demolition for a structure 5,000 square feet to 10,000 square
feet
|
$168
|
Demolition for a structure 10,000 square feet to 20,000 square
feet
|
$336
|
Each additional 10,000 total square feet
|
$168
|
Retaining Wall
| |
Less than 550 square feet associated with a Class 3 residential
structure
|
$106
|
More than 550 square feet associated with a Class 3 residential
structure
|
$210
|
Certificates
| |
Certificate of occupancy (CO)
|
$200
|
Certificate of occupancy (CO) for 1 and 2 residences less than
5,000 square feet and less than 30 feet
|
$100
|
Certificate of continued occupancy (CCO)
|
$200
|
Certificate of approval
|
$0
|
Use group change
|
$200
|
CO asbestos and lead
|
$176
|
Certificate for clearance for lead
|
$151
|
Code Variations
| |
Initial application
| |
Class I structures
|
$821
|
Class II and Class III structures
|
$168
|
Resubmission Class I structures
|
$100
|
Resubmission Class II structures
|
$50
|
Annual Construction Permits
| |
One to 25 workers (including foreman) each worker
|
$850
|
Each additional worker over 25
|
$300
|
Surcharges
| |
State surcharge on new buildings and additions
|
$0.00371 per cubic foot
|
State surcharge on all others
|
$1.90 per $1,000 of value of construction
|
Electrical Subcode Fees
| |
---|---|
Item
|
Fees
|
Minimum fee
|
$75
|
Receptacles and Fixtures
| |
1 to 50
|
$54
|
Each additional 25
|
$15
|
Motors and Electrical Devices over 1 hp
| |
Up to 10 hp
|
$20
|
Up to 50 hp
|
$69
|
Up to 100 hp
|
$138
|
Greater than 100 hp
|
$685
|
Transformers and Generators over 1 kw
| |
Up to 10.0 kw
|
$20
|
Up to 45.0 kw
|
$69
|
Up to 112.50 kw
|
$138
|
Greater than above
|
$685
|
Photovoltaic Systems
| |
Up to 50 kw
|
$75
|
Up to 100 kw
|
$200
|
Greater than 100 kw
|
$640
|
Service Panels, Entrances and Subpanels
| |
Up to 200 amps
|
$65
|
Up to 1,000 amps
|
$129
|
Greater than 1,000 amps
|
$640
|
Private Swimming Pools/Spas, Hot Tubs
| |
Pool, spa, hot tub or fountain, public
|
$77
|
Pool, spa, hot tub or fountain, private
|
$75
|
Annual pool bonding certification
Chapter 460, Swimming Pools, Private
|
$150
|
Underground wiring per foot
|
$0
|
Mechanical Inspection R-3 and R-4
| |
First
|
$60
|
Each additional
|
$20
|
Plumbing Subcode Fees
| |
---|---|
Description
|
Fees
|
Minimum fee
|
$75
|
Water closet
|
$18
|
Urinal/bidet
|
$18
|
Bathtub
|
$18
|
Lavatory
|
$18
|
Shower
|
$18
|
Floor drain
|
$18
|
Sinks
|
$18
|
Dishwasher
|
$18
|
Drinking fountain
|
$18
|
Washing machine
|
$18
|
Hose bibb
|
$18
|
Stacks
|
$18
|
Water heater
|
$45
|
Fuel oil piping
|
$45
|
Gas piping
|
$18
|
Steam boiler
|
$91
|
Hot water boiler
|
$91
|
Sewer pump
|
$91
|
Interceptor/separator
|
$91
|
Backflow preventer
|
$91
|
Grease trap
|
$91
|
Sewer connection
|
$91
|
Utility service connections
|
$91
|
Mechanical inspection in a one- or two-family owner-occupied
R5 first device
|
$60
|
Mechanical inspection in a one- or two-family owner-occupied
R5 additional device
|
$20
|
Fire Subcode Fees
| |
---|---|
Description
|
Fees
|
Inspection/Plan Review Subcode
| |
Minimum fee
|
$75
|
Alarm/Supervisory/Signaling
| |
Alarm devices (smoke and/or fire detectors)
| |
1 to 20
|
$85
|
21 to 100
|
$175
|
101 to 200
|
$300
|
201 to 400
|
$748
|
401 to 1,000
|
$1,235
|
1,001 and up
|
$1,500
|
Supervisory devices/FACP
|
$300
|
Wet and Dry Sprinkler Heads
| |
1 to 20
|
$86
|
21 to 100
|
$168
|
101 to 200
|
$321
|
201 to 400
|
$789
|
401 to 1,000
|
$1,150
|
Over 1,000
|
$1,469
|
Standpipe
|
$300
|
Preengineered Systems
| |
Wet chemical
|
$164
|
Dry chemical
|
$164
|
CO2 suppression
|
$164
|
Foam suppression
|
$164
|
Halon suppression
|
$164
|
Miscellaneous
| |
Kitchen hood exhaust system - residential
|
$155
|
Kitchen hood exhaust system - commercial
|
$300
|
Incinerators
|
$525
|
Crematoriums
|
$525
|
Gas or oil fires appliance not connected to plumbing system
|
$75
|
Fuel Oil Storage Tanks
| |
Minimum fee
|
$75
|
Installation of an R-3 or R-5 storage tanks
|
$75
|
All other tank installations
|
$125
|
Underground Storage Tanks (UST)
| |
Removal of 1 flammable or combustible liquid (UST)
|
$65
|
Inspection Fees
| ||
---|---|---|
Category
|
Fee
| |
Life hazard fees (LHU)
|
per Uniform Fire Code
| |
Non-life-hazard fees
| ||
Under 500 square feet
|
$45
| |
501 — 800 square feet
|
$60
| |
801 — 1,500 square feet
|
$66
| |
1,501 — 2,000 square feet
|
$75
| |
2,001 — 5,000 square feet
|
$105
| |
5,001 — 8,000 square feet
|
$135
| |
8,001 — 11,999 square feet
|
$175
| |
12,000 — 14,000 square feet
|
$200
| |
14,001 or more square feet
|
$275
| |
Church site, flat fee
|
$25
| |
Apartment complexes, per building
|
$45
| |
Self-storage facility, flat fee
|
$60
|