[R.O. 2013 § 405.150; R.O. 2012 § 405.150;
CC 1987 § 42.600; Ord. No. 880 Art.
1, 10-16-2003; Ord. No.
1000 Art. I, 11-18-2010]
A. No building shall hereafter be erected, converted, enlarged, reconstructed
or structurally altered, nor shall any work be started on the same
until a construction permit for the same has been issued by the Building
Commissioner of the Village, which permit shall state that the proposed
building complies with all provisions of this Chapter. Said permit
shall be issued at the charge based upon the following schedule:
Project Cost
|
Fee Charged
|
---|
$1.00 to $999.99
|
$50.00
|
$1,000.00 to $1,999.99
|
$60.00
|
$2,000.00 to $2,999.99
|
$70.00
|
$3,000.00 to $3,999.99
|
$80.00
|
$4,000.00 to $4,999.99
|
$90.00
|
$5,000.00 to $5,999.99
|
$130.00
|
$6,000.00 to $6,999.99
|
$140.00
|
$7,000.00 to $(infinity)
|
$150.00 plus an additional $30.00 for each $1,000.00 or part
thereof over $7,999.99
|
B. If permit is to be issued by St. Louis County, a fee of ten dollars
($10.00) shall be charged for completing the zoning approval application.
[R.O. 2013 § 405.160; R.O. 2012 § 405.160;
CC 1987 §§ 40.010, 42.610; Ord. No.
804 Art. I, 8-16-2001; Ord. No. 823 § 1, 11-15-2001; Ord. No. 952 Art. I, 8-21-2008]
A. Subsequent to the date of this Chapter no change in the use or occupancy
of land nor any change of use or occupancy in any existing building
shall be made nor shall any new building be occupied for any other
purpose than single-family dwelling use until an application shall
have been made to the Building Commissioner by the owner of the premises
or by the tenant and until an occupancy permit has been issued by
the Building Commissioner. Every occupancy permit shall state that
the new occupancy complies with all provisions of this Chapter.
1.
A record of all occupancy permits shall be kept on file at the
Village Hall by the Building Commissioner and shall be open and public
records of the Village.
2.
Inspection Required/Fee. Before an inspection will be performed
by the Village to determine whether a building is in compliance with
the Building and Maintenance Codes of the Village, the applicant must
pay to the Village the sum of sixty-five dollars ($65.00). In the
event that the applicant requests a reinspection of the same property
either to extend the length of the passed inspection or due to a failed
inspection, there will be no charge. Should a second reinspection
be required on the property, the applicant must pay the Village the
sum of twenty-seven dollars fifty cents ($27.50) before said reinspection
shall take place. Reinspection of property not in compliance must
be requested within sixty (60) days of notice of non-compliance; otherwise,
applicant must ask for a new inspection and pay for an inspection
fee. The Village may contract with St. Louis County for inspection
services which will be charged at the County's rates.
3.
Occupancy Permit Fee. An applicant for an occupancy permit must
pay to the Village the sum of twenty dollars ($20.00) as and for its
fee before such permit shall be issued.
B. No occupancy permits shall be issued to any resident or tenant of
real property within the Village of Hanley Hills if any property taxes,
garbage and rubbish assessments, special assessments or any other
monies assessed against said property by the Village of Hanley Hills
are due and owing.
[R.O. 2013 § 405.170; R.O. 2012 § 405.170;
CC 1987 § 42.620]
A. Every application for a building permit pursuant to this Chapter
shall be accompanied by a plat in duplicate, drawn to scale, showing
the actual dimension of the lot to be built upon, the size, shape
and location of the building to be erected, the specific purpose for
which the building is to be used, and such other information as may
be necessary to provide for the enforcement of this Chapter.
B. A record of all such applications and plats shall be kept on file
at the Village Hall by the Building Commissioner and shall be open
and public records of the Village.