The following portions of the 2015 International Fuel Gas Code, published by the International Code Council, are adopted by reference as though they were copied fully in this section: Chapters 2-8, and Appendices A through D.
(1966 Code, sec. 7-14; 2001 Code, sec. 22-571; Ordinance 111-2003, sec. 1, adopted 11/18/03; Ordinance 45-2007, sec. 4, adopted 5/1/07; Ordinance 33-2011, sec. 4, adopted 7/5/11; Ordinance 57-2015, sec. 4, adopted 12/1/15)
The following changes, deletions and amendments are made to the specified sections in the 2015 International Fuel Gas Code adopted in Section 22-571. Where an adopted section of the 2015 International Fuel Gas Code has not been changed, deleted, or amended by this ordinance, it is adopted as worded in the 2015 International Fuel Gas Code.
304.10 Size of openings. The required size of openings for combustion, ventilation and dilution air shall be 1 square inch of uninterrupted combustion air per 1000 Btu, or as specified in the manufacturer’s recommendation, whichever is greater
310.1.1 CSST. Unless manufacturers recommendations state otherwise, corrugated stainless steel tubing (CSST) gas piping systems and piping systems containing one or more segments of CSST shall be bonded to the electrical service grounding electrode system or, where provided, the lightning protection grounding electrode system.
403.10.4 Metallic fittings. Metallic fittings shall comply with the following:
(1966 Code, sec. 7-17; 2001 Code, sec. 22-572; Ordinance 111-2003, secs. 2, 3, adopted 11/18/03; Ordinance 45-2007, sec. 4, adopted 5/1/07; Ordinance 33-2011, sec. 4, adopted 7/5/11; Ordinance 57-2015, sec. 4, adopted 12/1/15)