During any stage of the work, if the Township Engineer determines
that temporary or permanent erosion and sedimentation control or stormwater
management facilities are not being installed in accordance with the
approved stormwater management plan, the Township shall revoke any
existing permits until such facilities are correctly installed, or
a revised stormwater management plan is submitted and approved, as
specified in this chapter.