The following fees are hereby established. Fees
not included specifically in this chapter or which have not been mentioned
or affected by this chapter shall be considered to be in full force
and effect.
[Amended 2-7-1997 by Ord. No. 1221]
Type of Permit
|
Fee
|
---|
Alarm system installer permit, annual
|
$35.00
|
Alarm system through commercial central stations
|
No fee
|
Dial alarm additional permit, annual
|
$75.00
|
License permit, annual
|
$500.00
|
Plenary retail distribution license, annual:
$600.
[Amended 3-21-1983 by Ord. No. 960; 9-6-1983 by Ord. No.
969; 12-3-1990 by Ord. No. 1118]
Document
|
Fee
|
---|
Code of the Borough of Leonia, per bound volume
|
$90.00
|
Zoning, Chapter 290, per bound volume
|
$20.00
|
Property Maintenance, Chapter 212, per bound volume
|
$5.00
|
Site Plan Review, Chapter 236, per bound volume
|
$5.00
|
Subdivision of Land, Chapter 250, per bound volume
|
$5.00
|
Personnel policies, per bound volume
|
$5.00
|
Rent Control, Chapter 220, per unbound copy
|
$3.50
|
Copies of municipal maps (per copy)
|
|
Street map
|
|
|
Small
|
$1.00
|
|
Medium
|
$3.00
|
|
Large
|
$5.00
|
Zoning Map (one size only)
|
$1.50
|
On any item that cannot be photocopied on the
Borough copy machine or not otherwise provided for in this schedule,
the actual cost incurred in making the copy shall be charged. [Added 3-7-2005 by Ord. No. 07-05]
|
|
Filing of a condominium conversion with the
municipality, per apartment unit
|
$5.00
|
Research by Borough employees for Borough records
(per hour, minimum one hour).
|
$40.00
|
Certification of documents
|
$5.00
|
[Amended 12-16-1985 by Ord. No. 1014; 12-7-1987 by Ord. No. 1061; 2-6-1995 by Ord. No. 1196; 12-19-2007 by Ord.
No. BOH 01-07; 6-5-2024 by Ord. No. 2024-07]
A. Dog license.
(1) License and registration tag for each sterilized dog licenses: $12
per year or $30 for a three-year license.
(2) License and registration tag for each nonsterilized dog licensed:
$21 per year or $63 for a three-year license.
(3) Late fee: an additional $10 from March 1 through December 31.
B. Cat license.
(1) Twelve dollars per year for each sterilized cat licensed or $30 for
a three-year license.
(2) Twenty-one dollars per year for each nonsterilized cat licensed or
$63 for a three-year license.
(3) Late fee: an additional $10 from March 1 through December 31.
For permits and licenses required under Chapter
136, Fire Prevention, and not specifically listed herein:
A. Fire prevention permits, per year: $10.
B. Fire prevention licenses, per year: $50.
[Amended 6-5-1989 by Ord. No. 1084]
Document/Service
|
Fee
|
---|
List of property owners
|
$35.00
|
Fee for publication of decision plus cost of
publication
|
$25.00
|
Bylaws, rules and regulations of the Planning
Board and Board of Adjustment, per page
|
$0.50
|
Transcripts of proceedings before either Board
or governing body, per page thereof
|
$4.00
|
Duplicate recordings of proceedings before either
Board or governing body, per tape or any part thereof
|
$25.00
|
Minutes of public meetings, per page
|
$0.50
|
Decisions of either Board or governing body,
per page
|
$0.50
|
Application for hearing:
|
|
|
Residential
|
$150.00
|
|
Commercial
|
$200.00
|
|
Reproduction of minutes, per page
|
$0.15
|
|
Reproduction of transcripts
|
Cost plus 10%
|
|
Copies of decision, per page
|
$0.15
|
Certified list
|
$10.00
|
[Amended 5-18-2020 by Ord. No. 2020-10]
A. Inspection fee three weeks prior to inspection date: $50.
B. Inspection fee two weeks prior to inspection date: $75.
C. Inspection fee one week prior to inspection date: $100.
D. Re-inspection fee, per occurrence: $50.
[Amended 2-5-1990 by Ord. No. 1102]
Type of Application
|
Fee
|
---|
Site plan preliminary filing (residential)
|
$200.00
|
Multiple family (per unit)
|
$35.00
|
All others
|
$200.00
|
Plus (per 1,000 square feet of gross
floor area)
|
$35.00
|
Site plan final filing (residential)
|
$200.00
|
Multiple family (per unit)
|
$35.00
|
All others
|
$200.00
|
Plus (per 1,000 square feet of gross
floor area)
|
$35.00
|
Simultaneous filing of preliminary and final:
|
|
Multiple family
|
$75.00, plus $7.00 per dwelling unit
|
All others, per 1,000 square feet
of gross floor area
|
$12.00
|
Minimum
|
$75.00
|
Existing building occupancy or change of use
|
$100.00
|
Amended site plan
|
$100.00
|
[Amended 2-5-1990 by Ord. No. 1102; 5-21-1990 by Ord. No.
1107; 12-4-1991 by Ord. No. 1133; 9-9-2009 by Ord. No. 12-09]
Type of Application
|
Fee
|
---|
Sketch plat
|
$25.00
|
Minor subdivision
|
$300.00
|
Plus (per lot)
|
$50.00
|
Escrow
|
$1,500.00
|
Major subdivision
|
$400.00
|
Plus (per lot)
|
$50.00
|
Escrow
|
$1,500.00
|
[Amended 2-12-2001 by Ord. No. 02-01]
Type of License
|
Fee
|
---|
Taxicab license:
|
|
|
Owner
|
$250.00
|
|
Each vehicle
|
$50.00
|
|
Driver's license
|
$25.00
|
Limousine license:
|
|
|
Owner
|
$50.00
|
|
Each vehicle
|
$50.00
|
|
Driver's license
|
$25.00
|
[Amended 4-20-1987 by Ord. No. 1042; 6-5-1989 by Ord. No.
1084; 5-21-1990 by Ord. No. 1107; 4-20-1992 by Ord. No. 1137; 4-21-1997 by Ord. No. 4-97; 10-5-1998 by Ord. No. 18-98; 6-6-2016 by Ord. No. 2016-5; 9-17-2018 by Ord. No. 2018-11; 8-1-2022 by Ord. No. 2022-10]
A. Building subcode fees.
(2) New construction, including additions, per cubic foot of volume:
Use Group
|
Fee
|
---|
All use groups
|
$0.06
|
(3) Renovations, alterations and repairs:
(a)
Up to first $50,000 in cost, per $1,000: $35.
(b)
From $50,000 to and including $100,000 in cost, per $1,000:
$25.
(c)
Over $100,000 in cost, per $1,000: $22.
(4) Building or structural demolition:
(a)
R-3 or R-5 Use Group, complete: $400.
(b)
All other use groups, complete: $800.
(c)
R-3 or R-5 Use Group, interior nonstructural: $80.
(d)
All other use groups, interior nonstructural: $250.
(5) Garage or accessory building demolition:
(a)
R-3 or R-5 Use Group: $100.
(b)
All other use groups: $200.
(6) Moving a building, per $1,000 of estimated cost of work: $30.
(7) Asbestos abatement: $200.
(8) Administrative certificate of occupancy: $25.
(9) Lead hazard abatement: $200.
(10)
Administrative certificate of clearance: $25.
(11)
Flat fees for the following (not subject to minimum fee):
(a)
Swimming pools (installations):
(b)
House and construction trailers, each: $300.
(12)
Retaining wall with surface area greater than 550 square feet
that is associated with a Class 3 residential structure: $200.
(13)
Retaining wall with a surface area of 550 square feet or less
that is associated with a Class 3 residential structure: $100.
(14)
Signs, per square foot, each face: $4.
(15)
Certificate of occupancy:
(a)
R-5 Use Group structures of less than 5,000 square feet in height:
$150.
(b)
All other buildings: minimum $200 or 10% of permit fee.
(16)
Charge of use group: $200.
(17)
Certificate of continued occupancy: minimum of Subcode fees,
plus certificate of occupancy fee.
(18)
Temporary certificate of occupancy:
(a)
Initial issuance: No fee.
(b)
Subsequent renewals, each: $75.
(19)
Certificate of approval: No fee.
(20)
Plan review, nonrefundable: 20% of construction permit fee.
(21)
Change of contractor, per subcode technical section: $17.
(22)
Permit fees:
(a)
Permit surcharge [state-mandated - N.J.A.C. 5:23-4.19(b), per
cubic foot of volume (New work and additions only)]: $0.00371.
(b)
Alterations, per $1 of cost: $0.0019.
(23)
Variation application as per N.J.A.C. 5:23-2.10:
(b)
Class I structure, resubmission: $250.
(c)
Class II and III structures: $100.
(d)
Class II and III structures, resubmission: $78.
(24)
Reinstatement of lapsed permit: Minimum of each subcode section
not completed.
(25)
Withdrawn permit administrative fee: 20% of permit fee.
B. Electrical subcode fees.
(2) Electrical devices (i.e. lighting outlets, convenience receptacles,
wall switches, smoke and heat detectors, fluorescent fixtures, fractional
horsepower motors, emergency lights, exit lights, communication points,
fire alarm devices, fire alarm control panel):
(a)
From one to 20 devices: $70.
(b)
Each additional 20 devices: $22.
(3) Motors (all except those in plug-in appliances):
(a)
From 1 to 10 horsepower: $22.
(b)
From 11 to 50 horsepower: $78.
(c)
From 51 to 100 horsepower: $118.
(d)
Over 100 horsepower: $550.
(4) Appliance equipment:
(a)
From one to 10 kilowatts: $22.
(b)
From 11 to 45 kilowatts: $78.
(c)
From 46 to 112.5 kilowatts: $120.
(d)
Over 112.5 kilowatts: $550.
(5) Transformers, generators:
(a)
From one to 10 kilowatts: $70.
(b)
From 11 to 45 kilowatts: $150.
(c)
From 46 to 112.5 kilowatts: $200.
(d)
Over 112.5 kilowatts: $550.
(6) Service entrance, panel, subpanel or disconnect:
(b)
From 101 to 200 amperes: $150.
(c)
From 201 to 1,000 amperes: $275.
(d)
Over 1,000 amperes: $550.
(7) Air-conditioning units (includes disconnect, compressor/condenser,
air handler):
(a)
R-3 or R-5 Use Group, new installations, each: $78.
(b)
All other use groups, new installations, each: $125.
(c)
Replacement of any system part: $50.
(8) Burglar alarm system:
(b)
Replacement of any system part: $40.
(9) Swimming pools (includes receptacle, switch, trench, bonding):
(b)
Equipotential bonding grid: $50.
(12)
Certificate of compliance, annual inspection for public swimming
pools, spas, hot tubs: $150.
(13)
Photovoltaic systems:
(a)
From one to 50 kilowatts: $150.
(b)
From 51 to 100 kilowatts: $300.
(c)
Greater than 100 kilowatts: $650.
C. Elevator subcode fees.
(1) The fee for elevators will be the third-party fee, plus an additional
administrative fee of 40%, with the minimum Borough fee being $78.
D. Fire subcode fees.
(2) Photovoltaic systems:
(b)
Each additional 20 panels: $50.
(3) Sprinkler systems, each:
(b)
Hydraulically calculated: $125.
(c)
R-5 Use Group, 20 or fewer heads: $100.
(4) Sprinkler system heads, all use groups:
(a)
From one to 20 heads: $85.
(b)
From 21 to 100 heads: $160.
(c)
From 101 to 200 heads: $250.
(d)
From 201 to 400 heads: $500.
(e)
From 401 to 1,000 heads: $800.
(f)
Over 1,000 heads: $1,200.
(5) Sprinkler system supervisory devices (i.e. water flow switch, tamper
switches low/high air), each: $25.
(7) Fire alarm systems:
(a)
Control panel, R-5 Use Group, each: $78.
(b)
Control panel, non-R-5 Use Group, each: $150.
(8) Detection devices (i.e. smoke detector heads, heat detector heads,
pull stations, carbon monoxide detectors):
(a)
From one to 20 devices: $90.
(b)
From 21 to 100 devices: $160.
(c)
From 101 to 200 devices: $225.
(d)
From 201 to 400 devices: $500.
(e)
From 401 to 1,000 devices: $900.
(f)
Over 1,000 devices: $1,200.
(9) Fire alarm system security devices (i.e. door locks, electromagnetic
releases): $25.
(10)
Fire alarm system signaling devices (i.e. horns, strobes, bells,
water flow alarms), each: $18.
(11)
Independent pre-engineered system, each:
(a)
Wet chemical system: $150.
(12)
Gas or oil fired appliances, each:
(a)
R-3 or R-5 Use Group, new installations: $78.
(b)
All other use groups: $90.
(13)
Solid fuel fired appliances (i.e. boilers, water heaters, furnaces,
generators) each: $78.
(14)
Metal chimney liner installation, each: $80.
(15)
Exhaust systems, each:
(a)
Commercial kitchen: $150.
(b)
Smoke control system: $250.
(16)
Incinerators, each: $400.
(18)
Fuel storage tanks:
(a)
R-5 Use Group, install, remove or abandon, each: $175.
(b)
All other use groups, install, remove or abandon, each:
[2]
From 276 gallons to 1,000 gallons: $250.
[3]
Each additional 500 gallons: $50.
(20)
Fire service main:
(a)
Less than or equal to four inches in diameter: $150.
(b)
Greater than four inches in diameter: $200.
E. Plumbing subcode fees.
(2) Fixtures (i.e. lavatories, kitchen sinks, basins, urinals, water
closets, bathtubs, shower stalls, sill cocks, laundry tubs, floor
drains, drinking fountains, dishwashers, garbage disposals, clothes
washers and similar devices), each: $28.
(4) Special devices (i.e. grease traps, oil separators, refrigeration
units, utility service connections, backflow preventers, gas service
interceptors and fuel oil piping) each:
(b)
All other use groups: $250.
(5) Utilization equipment (i.e. steam boilers, hot-water boilers, warm-air
furnaces) each:
(a)
R-3 or R-5 Use Group, new installations: $100.
(b)
All other use groups: $150.
(6) Extension of existing hearing systems: $60.
(7) Air-conditioning units:
(a)
R-3 or R-5 Use Group, new installations: $75.
(b)
All other use groups: $100.
(8) Water heaters, each:
(a)
R-3 or R-5 Use Group, new installations: $80.
(b)
All other use groups: $100.
(9) Gas piping, each:
(a)
R-3 or R-5 Use Group: $60.
(b)
All other use groups: $80.
(10)
Chimney liner, gas-fired appliance: $80.
(11)
Vapor recovery systems, each: $100.
(12)
Required annual re-inspections (i.e. cross-connections, back
flow preventers): $75.
(13)
Medical gas piping, per outlet: $22.
(16)
Pre-manufactured homes, plan review and connection inspections:
$200.
(17)
Swimming pools (backflow preventer and main drain): $150.
F. Zoning/land use fees.
(1) Zoning permit (includes review for use and/or development):
(a)
One- and two-family dwellings.
[1]
i.e. AC condensers, walkways, patios, pavers, deck: $50.
(2) Amended zoning application, each:
(a)
One- and two-family dwellings: $50.
(4) Sign/awning permit, each: $50.
(5) Temporary zoning permit (i.e. outdoor cafe, tents, seating, pods):
$100.
(6) Development applications:
(b)
Preliminary major subdivision:
[2]
Each additional acre or fraction thereof: $200.
(7) Final major subdivision: $500.
(8) Preliminary site plan:
(a)
Residential:
[2]
Plus each dwelling unit: $50.
(b)
All other:
[2]
Plus per 1,000 square feet of gross floor area: $50.
(9) Final site plan:
(a)
Residential:
[2]
Plus per each dwelling unit: $50.
(b)
All other:
[2]
Plus per 1,000 square fee of gross floor area: $50.
(10)
Amended sit plan application: $150.
(11)
Change of use or occupancy, existing buildings: $100.
(12)
Certificate of sale/rental occupancy (CRO):
(a)
Inspection fee three weeks prior to inspection date: $50.
(b)
Inspection fee two weeks prior to inspection date: $75.
(c)
Inspection fee one week prior to inspection date: $100.
(13)
Contractor registration, other than R Use Groups: $50.
(14)
Conditional use permit: $250.
(15)
Appeals filed pursuant to N.J.S.A. 40:55D-70(a) of the MLUL,
each: $100.
(16)
Interpretations filed pursuant to N.J.S.A. 40:55D-70(b) of the
MLUL, each: $100.
(17)
Variance appeals filed pursuant to N.J.S.A. 40:55D-70(c)(1)
or (2):
(18)
Variance appeals filed pursuant to N.J.S.A. 40:55D-70(d)(1),
each: $500.
(19)
Variance appeals filed pursuant to N.J.S.A. 40:55D-70(d)(2)
or (3), each: $350.
(20)
Variance appeals filed pursuant to N.J.S.A. 40:55D-70(d)(4),
(5) or (6), each: $350.
G. Other.
(1) Planning Board and Board of Adjustment:
(a)
Certified list of property owners: Finance Department.
(b)
Publication of decisions: applicant's responsibility.
(2) Letters of code confirmation, each: $75.
(3) Transcripts of hearings, each: Cost plus 10%.
(4) Audio tape/CD, per appeal: $25.
(5) Information request requiring historical research:
(a)
Nonmanagerial/nonexecutive, clerical, per hour: $45.
(b)
Managerial/executive, professional, per hour: $75.
[Added 2-20-2008 by Ord. No. 03-08; amended 11-10-2008 by Ord. No.
34-08; 12-6-2009 by Ord. No. 20-09; 12-6-2010 by Ord. No. 16-10; 12-5-2011 by Ord. No. 18-11; 3-19-2012 by Ord. No. 08-12; 12-17-2012 by Ord. No.
16-12; 12-9-2013 by Ord. No. 10-13]
A. Pool membership fees.
[Amended 6-6-2016 by Ord.
No. 2016-4; 11-21-2016 by Ord. No. 2016-12]
(1)
Pool membership fees are as follows:
Category
|
Discount Fee Period (March 1 thru April 30)
|
Regular Fee
|
Nonresident
|
---|
Senior individual (62+)
|
$160
|
$230
|
Not available
|
Senior couple (62+)
|
$285
|
$355
|
Not available
|
Individual
|
$180
|
$230
|
$375
|
2 persons
|
$305
|
$355
|
$500
|
3 persons
|
$410
|
$460
|
$600
|
4 persons
|
$490
|
$540
|
$675
|
5 persons
|
$525
|
$575
|
$700
|
6 or more persons
|
$550
|
$600
|
$725
|
Any additional persons
|
|
|
+$25/person
|
Caregiver pass
|
$90
|
$170
|
$225
|
Leonia/Edgewater resident attending any high school grades 9
through 12
|
$100
|
$100
|
Not available
|
No refunds will be given after opening day.
|
(2)
All those showing documentation as a member of the Leonia Emergency
Personnel will receive a discount of 25% on the above categories.
B. Guest cards will be sold at the Recreation Center for the following
rates:
(1)
During the discount period, guest cards will be sold for $10
apiece.
(2)
After the discount period, guest cards will be sold for $12
apiece.
(3)
If guest cards are not purchased, the cost of a guest to come
into the pool for a day will be $15 for a child (two years or older)
or an adult.
C. Swim lesson fees:
|
Type of Lesson
|
Fee
|
---|
|
1/2 hour (beginner, advanced beginner, tots, diving)
|
$20
|
|
1 hour (swimmer, intermediate)
|
$25
|
|
1 1/2 hours (basic water rescue)
|
$30
|
|
1/2 hour (dive, stroke, and turn class)
|
$30
|
|
Private lessons
|
$175
|
[Added 3-19-2012 by Ord. No. 09-12]
A. Fees for recreation camps are as follows:
|
|
Discount Fee Period March 1 through March 31
|
Regular Fee Period April 1 through April 30
|
Nonresident Fee
|
---|
|
With trip registration
|
$450
|
$500
|
$600
|
|
No trip registration
|
$350
|
$400
|
$500
|
B. Edgewater residents with children enrolled at the Edgewater Elementary
School, EVG, for the 2011-2012 school year shall be eligible to register
their children for the Leonia Summer Camp at the Leonia resident rates
listed above.