In all special flood hazard areas, the following requirements shall apply:
A. 
All subdivision proposals shall be consistent with the need to minimize flood damage;
B. 
All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage;
C. 
All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards; and
D. 
Base flood elevation (BFE) data shall be provided for all subdivision proposals, including manufactured home parks and subdivisions. In all special flood hazard areas where base flood elevation (BFE) data is not available, the applicant shall provide a hydrologic and hydraulic engineering analysis performed by a registered professional engineer that generates BFEs for all subdivision proposals and other proposed development, including manufactured home parks and subdivisions.