[Added 12-7-2022]
The purpose of this chapter is to authorize the Town of Ridgefield,
as allowed by C.G.S. § 29-406(b), to impose a waiting period
of not more than 90 days before granting a demolition permit for certain
structures of architectural, historical, or cultural importance. The
objective of this chapter is to promote the cultural, economic, educational
aspects and general welfare of the Town of Ridgefield by establishing
a process whereby the owners of buildings with significant historical,
architectural or cultural characteristics will be informed of the
benefits of historic preservation, rehabilitation and reuse of such
buildings and structures. The waiting period will provide time for
all interested parties to consider and put forth alternatives to demolition.
For the purposes of this chapter, the following words, terms
and phrases, when used in this chapter, shall have the meanings ascribed
to them in this section, except where the context clearly indicates
a different meaning:
APPLICANT
Any person or entity who files an application with the Town
of Ridgefield for a demolition permit.
BUILDING
Any structure built for the support, shelter or enclosure
of persons, animals, chattels or property of any kind.
DEMOLITION
Any wrecking activity directed to the disassembling, dismantling,
dismembering of any structure or building.
STRUCTURE
An assembly of materials above or below ground level forming
a construction for occupancy or other use.