Task
|
Rate
| |
---|---|---|
Chlorination tap
|
B
| |
Dig and replace curb box
|
B
| |
Dig and replace gate box
|
B
| |
Full renewal
|
B
| |
Main pipe leak
|
B
| |
Service leak (inside or out)
|
B
| |
New service complete
|
B
| |
New service curb to cellar
|
B
| |
New service main to curb
|
B
| |
Valve change
|
B
| |
Tap
|
B
| |
Punch corporation
|
B
| |
Discontinue service
|
B
| |
Relocate service
|
B
| |
Renewal main to curb
|
B
| |
Renewal main to cellar
|
B
| |
Service call
|
B
|
NOTES:
| |
---|---|
B =
| |
$55 per hour - plumber rate
| |
$50 per hour - labor rate
| |
$55 per hour - equipment rate and materials
|
Task
|
Rate
| ||
---|---|---|---|
Turn on, new service
|
$60
| ||
Turn on service
|
$42
| ||
Turn off service
|
$42
| ||
Turn off, seasonal service
|
$42
| ||
Turn on, seasonal service
|
$42
| ||
Transfer read
|
$60
| ||
2nd transfer read
|
$36
| ||
Reseal meter
|
$50
| ||
Test meter, 1 1/2-inch an smaller
|
$60
| ||
Insufficient check charge
|
$35
| ||
Deduct inspection
|
$30
| ||
Sprinkler application
|
$30
| ||
Hydrant flow test
|
$250
| ||
Hydrant permit
|
$50 plus metered usage and deposit for meter
apparatus
| ||
Unauthorized use
| |||
First offense
|
$150 plus time, materials and estimated water
usage
| ||
Each subsequent offense
|
$250 plus time, materials and estimated water
usage
| ||
Unauthorized connection
| |||
First offense
|
$150 plus time, materials and estimated water
usage
| ||
Each subsequent offense
|
$250 plus time, materials and estimated water
usage
| ||
Unauthorized meter change
| |||
First offense
|
$150 plus time, materials and estimated water
usage
| ||
Each subsequent offense
|
$250 plus time, materials and estimated water
usage
| ||
Unauthorized meter removal
| |||
First offense
|
$150 plus time, materials and estimated water
usage
| ||
Each subsequent offense
|
$250 plus time, materials and estimated water
usage
| ||
Unauthorized hydrant use
| |||
First offense
|
$150 plus time, materials and estimated water
usage
| ||
Each subsequent offense
|
$250
| ||
Unauthorized water service or water main turn
on or turn off
| |||
First offense
|
$150 plus time, materials and estimated water
usage
| ||
Each subsequent offense
|
$250 plus time, materials and estimated water
usage
|
Size
(inches)
|
Cost
(per unit)
| |
---|---|---|
1 or smaller
|
$400
| |
1 1/2
|
$400
| |
2
|
$400
| |
4
|
$400
| |
6
|
$500
| |
8
|
$1,000
| |
10 and 12
|
$1,200
|
Size
|
Cost
| |
---|---|---|
4-inch main
|
$400
| |
6-inch main
|
$500
| |
8-inch main
|
$1,000
| |
10-inch main
|
$12,000
| |
12-inch main
|
$12,000
|
Size
|
Cost
| |
---|---|---|
1-inch or smaller
|
$120
| |
1 1/2-inch
|
$400
| |
2-inch
|
$600
| |
4-inch
|
$800
| |
6-inch
|
$1,000
| |
8-inch
|
$2,000
| |
10-inch
|
$2,400
| |
12-inch
|
$2,400
|
Type
|
Measurement
|
Cost
| |
---|---|---|---|
Without infrared
|
2 feet per 2 feet by 5 feet
|
$12
| |
With infrared
|
2 feet per 2 feet by 5 feet
|
$52
| |
Cement sidewalk
|
Per square
|
$25
|
Size
(inches)
|
Quarterly Fee
| |
---|---|---|
2
|
$100
| |
4
|
$125
| |
6
|
$150
| |
8
|
$180
| |
10
|
$240
| |
12
|
$300
|
Meter Size
|
Water Supply Fee
(see exceptions below)
| |
---|---|---|
1-inch and less
|
$3,000
| |
1 1/2-inch
|
$4,500
| |
2-inch
|
$6,000
| |
3-inch
|
$9,000
| |
4-inch
|
$12,000
| |
6-inch
|
$18,000
|
Laboratory Analysis Rates
| ||
---|---|---|
Analysis
|
Cost/Sample
| |
Sampling/hourly fee
|
$50
| |
New water main chlorination/disinfection testing
|
$150
| |
pH
|
$20
| |
Total coliform - P/A
|
$20
| |
Total coliform - MF
|
$20
| |
Fecal coliform
|
$25
| |
Heterotrophic plate count (HPC)
|
$30
| |
Metals
|
$50
| |
Nitrate nitrogen
|
$15
| |
Fluoride
|
$20
| |
Turbidity
|
$25
| |
Color
|
$15
| |
Alkalinity
|
$25
| |
Phosphates
|
$15
| |
Chlorides
|
$15
| |
Sulfates
|
$15
| |
Hardness
|
$15
| |
Chlorine residual
|
$15
| |
Conductivity
|
$10
|
NOTE: The above rates reflect samples
delivered to the Water Treatment Plant. These rates do not include
sampling.
|