Meters will be tested not less frequently than (the
Water Department may require the meter to be tested more frequently
if in the opinion of the Water Department the meter is not working
properly):
Upon enactment of this section, the Haverhill Water
Department will notify, in writing, all accounts with meters one-and-one-half-inch
diameter and greater that they will be required to comply with this
article. Accounts affected by this article will be required to perform
their first meter test within one year of the passage of this article.
If the meters tested fail to meet the American Water
Works Accuracy Limits (AWWA No. M6), the Haverhill Water Department
will require the meter to be repaired or replaced within a designated
time. The repair or the replacement of a meter and appurtenances will
be in accordance with the American Water Works Standards (Water Meters
- Selection, Installation, Testing and Maintenance AWWA Manual M6)
and standards from the Haverhill Water Department.
If the gate valves before and after the meter are
inoperable or nonexistent and the periodic test cannot be conducted,
the Haverhill Water Department will require the gate valves to be
repaired, replaced or new valves installed within the designated time.
All costs associated with the testing of meters, repairs
or replacement of meters, installation, repair or replacement of gate
valves and appurtenances will be the responsibility of the owner of
said property where the meter, valves and appurtenances are located.