[Adopted 6-4-2007 by Ord. No. 2007-27]
The following assessments and fees shall be
payable to the Town for development of real property:
A.
Capital improvement assessments as authorized in § 47-8 of the Code:
[Amended 3-7-2022 by Ord. No. 2022-2]
B.
Inspection, testing and review fees as authorized in § 47-9 of the Code:
(1)
Final site plan inspection (prior to issuance of use
and occupancy permit): residential, $100; commercial/industrial, $100.
(2)
Sidewalks, curbs and gutters and driveways (inspection
on each as being constructed): residential, $15 each; commercial/industrial,
$15 each.
(3)
Water and sewer main installation and testing: residential,
$50; commercial/industrial, $50.
(4)
Review of all plans by Town Engineer: residential,
$50 per hour; commercial/industrial, $50 per hour.
[Amended 3-7-2022 by Ord. No. 2022-2]
C.
Inspection and acceptance fees as authorized in § 98-28A of the Code. The costs of inspection shall be borne by the developer and shall be part of the public works agreement payable at the rate of 8% of the estimated cost of the improvements.
D.
Sewer hookup fees as authorized by § 91-32 of the Code. The connection charge shall be $1,900, plus the sum of $2,700 to be allocated to sewer expansion and replacement funds for a total of $4,600.
[Amended 3-7-2022 by Ord. No. 2022-2]
E.
Water connection charges as authorized by § 109-20 of the Code. The connection charge shall be $1,900 per equivalent dwelling unit.
[Amended 3-7-2022 by Ord. No. 2022-2]
F.
Well exploration and development fee as authorized by § 109-25.1 of the Code. The well exploration and development fee shall be $1,700 per equivalent dwelling unit.
[Amended 3-7-2022 by Ord. No. 2022-2]
G.
Water benefit charge as authorized by § 109-26 of the Code. The water development charge shall be $3,200 per connection, and the additional water charge for the Mount Airy Volunteer Fire Company shall be $1,700.
[Amended 3-7-2022 by Ord. No. 2022-2]
H.
Additional charge for improvements, repairs and acquisitions as authorized by § 109-26.1 of the Code. The additional water charge for construction, reconstruction, improvements and repairs of streets and roads shall be $3,000.
[Amended 3-7-2022 by Ord. No. 2022-2]
I.
Additional charge for capital improvements as authorized by § 109-26.2 of the Code. The additional water charge for construction, reconstruction, improvements and repairs of capital projects shall be $6,200.
[Amended 3-7-2022 by Ord. No. 2022-2]