[Adopted 6-4-2007 by Ord. No. 2007-27]
The following assessments and fees shall be
payable to the Town for development of real property:
A. Capital improvement assessments as authorized in §
47-8 of the Code:
[Amended 3-7-2022 by Ord. No. 2022-2]
(1) Residential (new): $2,200 per unit.
(2) Commercial/Industrial (new): $2,700 or $0.38 per square
foot, whichever is greater.
(3) Conversion of existing building to commercial or industrial
use: $0.28 per square foot.
B. Inspection, testing and review fees as authorized in §
47-9 of the Code:
(1) Final site plan inspection (prior to issuance of use
and occupancy permit): residential, $100; commercial/industrial, $100.
(2) Sidewalks, curbs and gutters and driveways (inspection
on each as being constructed): residential, $15 each; commercial/industrial,
$15 each.
(3) Water and sewer main installation and testing: residential,
$50; commercial/industrial, $50.
(4) Review of all plans by Town Engineer: residential,
$50 per hour; commercial/industrial, $50 per hour.
[Amended 3-7-2022 by Ord. No. 2022-2]
C. Inspection and acceptance fees as authorized in §
98-28A of the Code. The costs of inspection shall be borne by the developer and shall be part of the public works agreement payable at the rate of 8% of the estimated cost of the improvements.
D. Sewer hookup fees as authorized by §
91-32 of the Code. The connection charge shall be $1,900, plus the sum of $2,700 to be allocated to sewer expansion and replacement funds for a total of $4,600.
[Amended 3-7-2022 by Ord. No. 2022-2]
E. Water connection charges as authorized by §
109-20 of the Code. The connection charge shall be $1,900 per equivalent dwelling unit.
[Amended 3-7-2022 by Ord. No. 2022-2]
F. Well exploration and development fee as authorized by §
109-25.1 of the Code. The well exploration and development fee shall be $1,700 per equivalent dwelling unit.
[Amended 3-7-2022 by Ord. No. 2022-2]
G. Water benefit charge as authorized by §
109-26 of the Code. The water development charge shall be $3,200 per connection, and the additional water charge for the Mount Airy Volunteer Fire Company shall be $1,700.
[Amended 3-7-2022 by Ord. No. 2022-2]
H. Additional charge for improvements, repairs and acquisitions as authorized by §
109-26.1 of the Code. The additional water charge for construction, reconstruction, improvements and repairs of streets and roads shall be $3,000.
[Amended 3-7-2022 by Ord. No. 2022-2]
I. Additional charge for capital improvements as authorized by §
109-26.2 of the Code. The additional water charge for construction, reconstruction, improvements and repairs of capital projects shall be $6,200.
[Amended 3-7-2022 by Ord. No. 2022-2]
J. Additional charge for park improvements as authorized by §
109-26.3 of the Code. The additional water charge for construction, reconstruction, improvements and repairs of parks shall be $1,500.
K. Additional public safety benefit charge as authorized by §
37-6 of the Town Code. The additional charge for public safety by the Mount Airy Police Department shall be $1,700.
[Added 3-7-2022 by Ord. No. 2022-2]