All connections to the water system shall be
installed in accordance with the Plumbing Code of the Township of Franklin and the applicable local and
state regulations regarding water supply. However, employees of the
Water Division of the Department of Public Works shall be empowered
to make such taps, installations and corrections in the water system
as may be necessary to correct operation of the public water system
of the Township of Franklin.
The Township Manager is hereby authorized to issue such further rules and regulations as may be necessary to effectively administer the general policy of this chapter. Such rules and regulations must be issued in accordance with the requirements of Chapter
5, Administrative of Government, of the Code of the Township of Franklin.
[Added 6-30-2005 by Ord. No. 3553; amended 3-11-2008 by Ord. No.
3744]
A. Declaration of water emergency. In situations where
the Health Officer declares a general water emergency, the following
fees may be waived by resolution of the Township Council (effective
April 28, 2004):
(1) Well abandonment fee as stated in §
384-7E.
(2) Curb connection capital fees as stated in §
384-19.
B. Special circumstances. In situations where a nonprofit
project is supported by the Township of Franklin and funded by grant
monies, the following fees may be waived by resolution of the Township
Council:
(1) Well abandonment fee as stated in §
384-7E.
(2) Curb connection capital fees as stated in §
384-19.