[Adopted 4-4-1986 by L.L. No. 1-1986]
This local law shall be known and may be cited
as Local Law No. 1 of 1986, a local law amending Local Law No. 2 of
1973 of the Town of Halfmoon entitled "Local Law Relating to Zoning
for the Town of Halfmoon," providing for the creation of a planned
development district to be known as "Saratoga Economic Development
Corporation Industrial Park Planned Development District."
Local Law No. 2 of 1973, of the Town of Halfmoon
entitled "Local Law Relating to Zoning for the Town of Halfmoon" and
the Zoning Map of the Town of Halfmoon, as set forth and enacted in
Local Law No. 1 of 1984, be and the same hereby are amended as hereinafter
described, creating within the boundaries of said newly described
area a planned development district to be known as "Saratoga Economic
Development Corporation Industrial Park."
The area of said Saratoga Economic Development
Corporation Industrial Park is bounded and described as set forth
in Exhibit B attached hereto and made a part hereof.
There shall be developed within the areas of
said Saratoga Economic Development Corporation Industrial Park no
more than 10 lots consisting of light industrial plants, buildings,
facilities, roads or streets as follows:
A. There shall be constructed streets together with connecting
streets and an existing street or portion thereof shall be abandoned
as shown on the preliminary map on file with the Town Clerk herein.
B. No more than three lots will be developed before the
district is connected to a municipal water source. During the time
the district relies on on-site wells, no process or manufacturing
use of water will be permitted.
C. Wastewater disposal will be provided by connection
to the County Sewer District. Plans for the collection system must
be approved by Saratoga County Sewer District No. 1 and the State
Department of Environmental Conservation.
D. A stormwater management system will be installed to
assure that adjacent and downstream properties, both public and private,
will not suffer increased flooding.
E. No facilities which require exhaust stacks for manufacturing
processes or process emissions will be permitted. Minor exhaust stacks
may be allowed for maintenance and repair activities which are incidental
to the primary use of the site.
F. Visual impacts will be minimized through the use of
buffer areas, setbacks, architectural design, and screening such as
berms, fences and plant materials for the district area as a whole
and for each developed site.
G. The applicant will construct the interior loop road
and the realignment of Werner Road in compliance with Town specifications.
H. Permits from the State Department of Transportation
for access to Route 146 will be obtained.
I. Approval of the State Department of Health will be
obtained for the water system, as appropriate.
J. Approval of the Town of Halfmoon for the water distribution
system when connected to a municipal source will be obtained.
K. The area described is approximately 100 acres in size
and is located on the west side of Route 146, westerly of Werner Road.
L. Before construction of Saratoga Economic Development
Corporation Light Industrial Park Planned Development District is
started or any building permit is issued relating thereto, final plans
and specifications shall be submitted to the Planning Board of the
Town of Halfmoon and filed with the Town Clerk of the Town of Halfmoon.
Planning and Town Board approvals are required prior to construction.
M. During the construction of Saratoga Economic Development
Corporation Light Industrial Park Planned Development District, there
shall be constructed, as set forth as part of the plans and specifications
to be approved by the Planning Board of the Town of Halfmoon, parking
areas providing sufficient parking for all plants or buildings.
All improvements shall be designed and constructed
pursuant to plans and specifications approved by a duly licensed architect
and in strict compliance with the New York State Building Code. The
Planning Board shall not give approval as referred to in said local
law relating to zoning, Section 1002, paragraph 8, unless and until all approvals required by each and every
other government or governmental entity have been obtained. The architect
performing the work herein described shall be employed by and at the
expense of the developer. All construction during performance thereof
and upon completion shall be subject to the inspection and approval
of the Enforcement Officer of the Town of Halfmoon. All roads and/or
streets to be constructed within the project limits pursuant to this
local law shall be constructed pursuant to specifications at the time
in effect for the construction of Town highways in the Town of Halfmoon.
Any private water system must and shall be connected to public or
municipal facilities when available.
Upon satisfactory completion in accordance with
the requirements of the appropriate state agencies, all water distribution
facilities including mains, valves, fittings, hydrants and that portion
of the service connection which lies within the limits of the dedicated
roadways shall be offered to the Town of Halfmoon with delivery to
the Town of Halfmoon of duly executed deeds, easements and bills of
sale, as appropriate, at no cost to the Town of Halfmoon.
For those portions of the water distribution
system including mains, valves, fittings and hydrants which lie outside
the limits of dedicated highways, easements for the maintenance, repair
and replacement of the system shall be conveyed to the Town of Halfmoon
at no cost to the Town of Halfmoon.
Upon satisfactory completion and connection
in accordance with the requirements of the appropriate state agencies,
all sewage facilities including mains, manholes and pumping stations
shall be offered to Saratoga County Sewer District No. 1 at no cost
to said district with delivery to said Saratoga County Sewer District
No. 1 of duly executed deeds, easements and bills of sale, as appropriate,
together with easements for the maintenance, repair and replacement
of all those portions of the system which lie outside the limits of
the dedicated streets. Parcels of land for pumping station and access
thereto shall be offered in fee to said district with delivery to
said district of a duly executed deed or deeds, at no cost to said
district.
Upon satisfactory completion in accordance with
the approved drawings, all stormwater management facilities within
the limits of dedicated streets shall be offered to the Town of Halfmoon
with duly executed deeds, easements and bills of sale, as appropriate,
at no cost to the Town of Halfmoon.
For all those portions of the stormwater management
facilities, including pipes, catch basins, manholes and retention
areas, which lie outside the limits of dedicated streets, easements
for the maintenance, repair and replacement of the system shall be
conveyed to the Town of Halfmoon at no cost to the Town of Halfmoon.
This amendment shall be deemed automatically
revoked and void and the previous regulations and laws shall obtain
if, within one year from the approval of the Planning Board of the
Town of Halfmoon for the construction of the project, commencement
of the construction of Saratoga Economic Development Corporation Light
Industrial Park Planned Development District has not begun, or if
after construction has begun unless substantial progress continues
without undue interruption thereafter or if the development is not
completed within eight years of such approval. As to the area within
which a building or buildings have been constructed pursuant to this
local law, there shall be no voiding of the amendment and, as to said
area and building or buildings, this amending local law shall continue
in full force and effect and the area zoned by this local law shall
be the area within which said building or buildings was or were constructed
pursuant to this amending local law. For proper cause shown, the Town
Board of the Town of Halfmoon may, upon such terms and conditions
as it deems proper, extend either the six-month period or the eight-year
period, or both, and/or may waive the requirement that substantial
progress shall continue without undue interruption. Any such extension
of time or waiver may be made by the Town Board without a public hearing.
Section 402 of the said Local Law 2 of 1973,
Zoning Map, is hereby amended by providing that Saratoga Economic
Development Corporation Light Industrial Park be set forth on a supplementary
map which is hereby made a part of this local law as Exhibit A. The
property set forth on such map is the real property described in the
description annexed hereto made by The Environmental Design Partnership,
which is hereby made a part of this local law as Exhibit B.
[Added 8-5-1997 by L.L. No. 4-1997]
A. Title. This local law shall be known and may be cited
as Local Law No. 4 of 1997, a local law amending Local Law No. 1 of
1995 of the Town of Halfmoon, entitled "Local Law Relating to Zoning
for the Town of Halfmoon," as previously amended and supplemented
by the local laws and an ordinance relating to zoning of the Town
of Halfmoon, and further amending Local Law No. 1 of 1986, providing
for the creating of a planned development district known as Saratoga
Economic Development Corporation Industrial Planned Development District.
B. Establishment of district. Local Law No. 5 of 1995
of the Town of Halfmoon, entitled "Local Law Relating to Zoning for
the Town of Halfmoon," and the Zoning Map of the Town of Halfmoon,
as set forth and enacted in Local Law No. 5 of 1995 and Local Law
No. 1 of 1986, be and the same hereby are amended by modifying the
provisions applicable to the planned development district known and
described as "Saratoga Economic Development Corporation Industrial
Planned Development District," which was created by said Local Law
No. 1 of 1986.
C. Boundaries. The area of said planned development district
is contained in one lot to be added to the Saratoga Economic Development
Corporation Industrial Planned Development District and is bounded
and described as set forth in Exhibit A attached hereto and made a
part hereof and as shown on a certain amended site plan map thereof
prepared by ABD Engineers & Surveyors, dated June 21, 1996, entitled
"New York State Electric and Gas Corporation."
D. Amendment. The planned development district legislation
is changed to permit the setback on Lot No. 1 of the Halfmoon Light
Industrial Park to be reduced from 200 feet to 70 feet and further
eliminating the stormwater management area off Lot No. 1 thereof,
as shown on a map made by ABD Engineers & Surveyors dated June
21, 1996, entitled "New York State Electric and Gas Corporation,"
subject to final site plan review and approval by the Planning Board
of the Town of Halfmoon.
E. Zoning Map. Local Law No. 5 of 1995 and the Official
Zoning Map, as revised, amended and supplemented, is hereby amended
by providing that Saratoga Economic Development Corporation Industrial
Planned Development District be set forth on a supplementary map which
is hereby made a part of this local law as Exhibit B, dated June 21,
1996; the property set forth on such map is the same real property
described in the description annexed hereto and marked Exhibit A made
by ABD Engineers & Surveyors dated June 21, 1996.
F. All of the previous conditions stipulations and legislation
contained in Local Law No. 6 of 1996 are heretofore amended and, except
as inconsistent herewith, shall remain in full force and effect.
[Added 4-17-2001 by L.L. No. 1-2001]
A. Title. This local law shall be known and may be cited
as Local Law No. 1 of 2001, a local law amending Local Law No. 1 of
1995 of the Town of Halfmoon, entitled "Local Law Relating to Zoning
for the Town of Halfmoon," as previously amended and supplemented
by the local laws and an ordinance relating to zoning of the Town
of Halfmoon, and Local Law No. 4 of 1997 and further amending Local
Law No. 1 of 1986, providing for the creating of a planned development
district known as "Saratoga Economic Development Corporation Industrial
Planned Development District."
B. Establishment of district. Local Law No. 5 of 1995
of the Town of Halfmoon, entitled "Local Law Relating to Zoning for
the Town of Halfmoon," and the Zoning Map of the Town of Halfmoon,
as set forth and enacted in Local Law No. 5 of 1995 and Local Law
No. 1 of 1986, be and the same hereby are amended by modifying the
provisions applicable to the planned development district known and
described as "Saratoga Economic Development Corporation Industrial
Planned Development District," which was created by said Local Law
No. 1 of 1986, as thereafter amended.
C. Boundaries. The area of said planned development district
is shown on a certain subdivision map thereof prepared by Environmental
Design Partnership, dated December 11, 1989, entitled "A Portion of
Lands of New York State Electric and Gas Corporation," and further
set forth in the site plan thereof, dated November 8, 1995, made by
Environmental Design Partnership.
D. Amendment. The planned development district legislation
is changed to permit the use on Lot No. 1 of the Halfmoon Light Industrial
Park for retail sales of new cars by New Salem Saab, all as shown
on a site plan entitled "Saab of Halfmoon Site Plan" made by ABD Engineers
& Surveyors, dated November 2000 and last revised March 14, 2001.
It is expressly set forth herein that no retail uses will be permitted
on the other lots in the subdivision, including the vacant lots 4,
5, 10 and 12 Enterprise Avenue and Lot 10 Werner Road. No other lot
in the subdivision will be permitted to have retail sales or commercial
uses. They shall all be light industrial or manufacturing uses as
permitted by the Town Board and the Town Planning Board of the Town
of Halfmoon.
E. Construction regulations.
(1) Before construction of the amended Saratoga Economic
Development Corporation Planned Development District New Salem Saab
site is started or any building permit is issued relative thereto,
final site plans and specifications, sufficient for the site plan
review and engineering analysis, shall be submitted to and approved
by the Planning Board of the Town of Halfmoon and filed with the Town
Clerk of the Town of Halfmoon, and said approval is a condition precedent
to any construction.
(2) All improvements shall be designed and constructed
pursuant to plans and specifications approved by a duly licensed architect
and/or engineer and in strict compliance with the New York State Uniform
Fire Prevention and Building Code. All construction shall be performed
subject to the direction and control of a duly licensed architect
and/or engineer and, when completed, shall be certified as having
been constructed in full compliance with the New York State Uniform
Fire Prevention and Building Code. The engineer and/or architect performing
the work herein described shall be employed by and at the sole expense
of the developer. The Planning Board shall not give approval as referred
to in said local law relating to zoning unless or until all approvals
required by each and every other government or governmental entity
have been obtained. All construction during the performance thereof
and upon completion shall be subject to the inspection and approval
of the Enforcement Officer and Fire Marshal of the Town of Halfmoon.
(3) The exact location, number and size of buildings,
parking areas, green space, sidewalks, interim roads and other related
matters may be changed, altered or amended during the Town of Halfmoon
Planning Board site plan review process in a manner generally consistent
with the preliminary plan and this local law.
(4) During construction of the Saratoga County Economic
Development Planned Development District New Salem Saab site, there
shall be constructed, as set forth in general conformity with the
preliminary plans, as a part of the plans and specifications to be
approved by the Planning Board of the Town of Halfmoon, parking areas
and access drives providing sufficient parking and access for all
buildings per Town specifications.
F. Water distribution facilities; dedication. Upon satisfactory
completion in accordance with the requirements of the appropriate
state agencies, all water distribution facilities including mains,
valves, fittings, hydrants and that portion of the service connection
which lie outside the limits of dedicated roadways shall be offered
to the Town of Halfmoon with delivery to the Town of Halfmoon of duly
executed deeds, title insurance, easements and bills of sale, as appropriate,
at no cost to the Town of Halfmoon with title insurance and documents
as required by the Town Attorney.
G. Water distribution facilities; easements. For those
portions of the water distribution system including mains, valves,
fittings and hydrants which lie outside the limits of dedicated highways,
easements for the maintenance, repair and replacement of the system
shall be conveyed to the Town of Halfmoon at no cost to the Town of
Halfmoon with appropriate title insurance and documents satisfactory
to the Town Attorney together with title insurance and documents as
required by the Town Attorney.
H. Sewage facilities; dedication. Upon satisfactory completion
and connection in accordance with the requirements of the appropriate
state agencies, Saratoga County Sewer District, all sewage facilities
including mains, manholes and pumping stations shall be offered to
Saratoga County Sewer District No. 1 at no cost to said district with
delivery to said Saratoga County Sewer District No. 1 of duly executed
deeds, easements and bills of sale, as appropriate, together with
easements for the maintenance, repair and replacement of all those
portions of the system which lie outside the limits of the dedicated
streets. Parcels of land for pumping station and access thereto shall
be offered in fee to said district with delivery to said district
of a duly executed deed or deeds, at no cost to said district, if
necessary.
I. Stormwater management facilities; dedication. Upon
satisfactory completion in accordance with the approved drawings,
all stormwater management facilities within the limits of dedicated
streets shall be offered to the Town of Halfmoon with duly executed
deeds, easements and bills of sale, as appropriate, at no cost to
the Town of Halfmoon, which the Town in its sole discretion may accept
for dedication at any time it determines together with title insurance
and documents as required by the Town.
J. Stormwater management facilities; easements. For all
those portions of the stormwater management facilities, including
pipes, catch basins, manholes and retention areas, which lie outside
the limits of dedicated streets, easements for the maintenance, repair
and replacement of the system shall be conveyed to the Town of Halfmoon
at no cost to the Town of Halfmoon, if requested by the Town of Halfmoon
at any time, together with title insurance and documents as required
by the Town.
K. Stormwater retention/detention tax district. In the
event the Town of Halfmoon chooses to create a stormwater retention
or detention tax district or stormwater management tax district or
the equivalent, it is the intent that the stormwater management areas
created as a part of this planned development district will be dedicated
to and become a part of that tax district to be serviced and paid
for pursuant to the legislation adopted therefor by the development
serviced by said areas, for the development area.
L. Signs. All signs within the district shall comply
with the requirements established by the Planning Board during site
plan review and must be approved by said Planning Board.
M. Letter of credit.
(1) The developer shall file bonds or letters of credit
in the amounts established by the Town Planning Board and acceptable
as to amount and form to the Town Engineers and Town Attorney to guarantee
the following:
(a)
Return of the site to its original condition
after clearing and grading should this be deemed necessary by the
Planning Board;
(b)
The satisfactory completion of the utilities,
paving and other infrastructure for the project;
(c)
The satisfactory completion and maintenance
of landscaping on the project site.
(2) The bonds or letters of credit shall be filed for
the period of time to be determined by the Planning Board.
N. Revocation; regulations for construction completed
at time of revocation; waiver.
(1) This amending local law shall be automatically revoked
and void and the previous statutory regulations shall apply under
the following circumstances:
(a)
Commencement of the construction of amended
Saratoga County Economic Development Planned Development District
New Salem Saab site has not begun within 12 months from the effective
date of this local law;
(b)
Substantial progress is not being made without
undue interruption after construction has commenced;
(c)
Completion of the proposed planned development
is not completed within five years from the start of construction.
(2) As to the area within which a building or buildings
have been constructed pursuant to this local law, there shall be no
voiding of this amendment and, as to said are and buildings, this
amending local law shall continue in full force and effect, and the
areas zoned by this local law shall be the area within which said
building or buildings was or were constructed pursuant to this amended
local law plus an additional area of 50 feet of open space beyond
the outside boundaries of each building constructed.
(3) For proper cause shown, the Town Board may, under
such terms and conditions as it deems proper, waive either or both
of said requirements by resolutions, without first conducting a public
hearing thereon.
[Added 12-4-2007 by L.L. No. 8-2007]
A. Title. This local law shall be known and may be cited
as Local Law No. 8 of 2007, a local law amending Local Law No. 5 of
1995 of the Town of Halfmoon, entitled "Local Law Relating to Zoning
for the Town of Halfmoon," as previously amended and supplemented,
providing for the amendment to a planned development district known
as the "Halfmoon Industrial Park."
B. Establishment of district. Local Law No. 5 of 1995
of the Town of Halfmoon, entitled "Local Law Relating to Zoning for
the Town of Halfmoon," and the Zoning Map of the Town of Halfmoon,
as previously amended, be and the same hereby are amended, to be known
and described as "The Halfmoon Industrial Park Planned Development
District."
C. Boundaries shall not be modified by this amendment.
D. Development. In addition to the uses permitted under
the original planned development district and the modifications made
in 1997 and 2001, the uses permitted on Lot 1 shall be expanded as
follows:
(1) The property known as Lot 1 in the Halfmoon Industrial
Park Planned Development District (the "property") may be utilized
as a church with seating for 350 attendees together with ancillary
uses. The site shall be modified in conformance with the site plan
proposed parking amendments for Grace Fellowship Church last revised
on December 4, 2007, detailing 99 ten-foot by twenty-foot parking
spaces with the remainder of the 216 spaces being nine-foot by twenty-foot
or in compliance with New York States handicap accessibility regulations.
Parking attendants and traffic control people will be provided by
Grace Fellowship Church and shall ensure that parking does not occur
on Route 146 or any Town road.
(2) As a condition of the Town Board granting the amendment
to the existing planned development district, the Grace Fellowship
Church shall provide the Town of Halfmoon the sum of $25,000 to be
utilized for the benefit of the Town's municipal park thereby ensuring
that the amendments establish a sufficient public benefit to merit
the granting of the zoning change.
(3) All improvements shall be designed and constructed
pursuant to plans and specifications approved by a duly licensed architect
and/or engineer and in strict compliance with the New York State Uniform
Fire Prevention and Building Code. All construction shall be performed
subject to the direction and control of a duly licensed architect
and/or engineer and, when completed, shall be certified as having
been constructed in full compliance with the New York State Uniform
Fire Prevention and Building Code. The engineer and/or architect performing
the work herein described shall be employed by and at the sole expense
of the developer. The Planning Board shall not give approval as referred
to in said local law relating to zoning unless or until all approvals
required by each and every other government or governmental entity
have been obtained. All construction during the performance thereof
and upon completion shall be subject to the inspection and approval
of the Enforcement Officer and Fire Marshal of the Town of Halfmoon.
E. Signs. All signs within the district shall comply
with the requirements established by the Planning Board during site
plan review and must be approved by said Planning Board.
F. Letter of credit.
(1) The developer shall file bonds or letters of credit
in the amounts established by the Town Planning Board and acceptable
as to amount and form to the Town Engineers and Town Attorney to guarantee
the following:
(a)
Return of the site to its original condition
after clearing and grading should this be deemed necessary by the
Planning Board;
(b)
The satisfactory completion of the utilities,
paving and other infrastructure for the project;
(c)
The satisfactory completion and maintenance
of landscaping on the project site.
(2) The bonds or letters of credit shall be filed for
the period of time to be determined by the Planning Board.
G. Zoning Map. Local Law No. 5 of 1995 is hereby amended
by providing that the Halfmoon Industrial Park Planned Development
District Map having been made by ABD Engineers & Surveyors, last
revised December 4, 2007, entitled "Site Plan Proposed Parking Amendment
- Grace Fellowship Road," together with the additions as detailed
in the 1997 and 2001 amendments and the original 1986 approval are
included as part of the local law.
H. Revocation; regulations for construction completed
at time of revocation; waiver.
(1) This amending local law shall be automatically revoked
and void and the previous statutory regulations shall apply under
the following circumstances:
(a)
Commencement of the construction of the amended
Halfmoon Industrial Park Planned Development District has not begun
within 12 months from the effective date of this local law;
(b)
Substantial progress is not being made without
undue interruption after construction has commenced;
(c)
Completion of the proposed planned development
is not completed within one year from the start of construction.
(2) As to the area within which a building or buildings
have been constructed pursuant to this local law, there shall be no
voiding of this amendment, and as to said area and buildings, this
amending local law shall continue in full force and effect, and the
areas zoned by this local law shall be the area within which said
building or buildings was or were constructed pursuant to this amended
local law plus an additional area of 50 feet of open space beyond
the outside boundaries of each building constructed.
(3) For proper cause shown, the Town Board may, under
such terms and conditions as it deems proper, waive either or both
of said requirements by resolutions, without first conducting a public
hearing thereon, and extend the time for completion or construction
of additional facilities.
[Added 9-6-2017 by L.L.
No. 4-2017]
A. Title. This local law shall be known may be cited as Local Law No. 4 of 2017, a local amending Local Law No. 5 of 1995 of the Town of Halfmoon entitled "Local Law Relating to Zoning for the Town of Halfmoon," as previously amended and supplemented, and amending Local Law No. 2 of 1973, as amended by Local Law No. 1 of 1986, as amended by Local Law No. 4 of 1997, as amended by Local Law No. 1 of 2001, as amended by Local Law No. 8 of 2007, providing for the creation of a planned development district known as Article
XVI, Saratoga Economic Development Corporation Industrial Park Planned Development District.
B. Use. Werner Road Lot 10 (2 Werner Road) is permitted to conduct wholesale
and retail sales at the proposed Graybar Distribution warehouse facility.
C. Development.
(1)
In addition to the requirements set forth in the original planned
development district and the amendments thereto, the screening plan
as presented at the Town Board meeting on September 6, 2017, shall
be implemented as part of the development of the Werner Road Lot 10
(2 Werner Road) Graybar Distribution warehouse facility.
(2)
The Saratoga Economic Industrial Park Planned Development District
is hereby amended to permit the setback on Werner Road Lot 10 (2 Werner
Road) to be reduced from 200 feet to 150 feet for buildings and 50
feet for parking along New York State Route 146 right-of-way; all
other setbacks along Werner Road and Old Werner Road shall be 50 feet
as detailed in the set of plans entitled "Graybar Electric Warehouse,"
last revised July 21, 2017.
D. In the interest of the general welfare of the public, $10,000 shall
be donated to a Town Board designated fund.
E. All other provisions of the previously approved Saratoga Economic
Development Corporation Industrial Park Planned Development District,
together with previously approved amendments, except as modified herein,
shall remain in full force and effect.
[Added 1-17-2018 by L.L.
No. 1-2018]
A. Title. This local law shall be known and may be cited as Local Law
No. 1 of 2018, a local law amending Local Law No. 5 of 1995 of the
Town of Halfmoon entitled "Local Law Relating to Zoning for the Town
of Halfmoon," as previously amended and supplemented, and Local Law
No. 3 of 1971, Local Law No. 1 of 1991, Local Law No. 2 of 1997, Local
Law No. 1 of 2008, and Local Law No. 4 of 2015, which renamed the
Planned Development District to "421 Halfmoon Flex Park Planned Development
District." This amendment will also amend the Saratoga Economic Development
Corporation Industrial Park Planned Development District created as
Local Law No. 2 of 1973 as previously amended and supplemented by
Local Law No. 1 of 1986, Local Law No. 4 of 1997, Local Law No. 1
of 2001, Local Law No. 8 of 2007 and Local Law No. 4 of 2017.
B. Boundaries. The area of 421 Halfmoon Flex Park Planned Development
District shall be expanded by 8.65 acres which is being removed from
4 Enterprise Drive, Tax Map ID 272-4-87.1, via lot line adjustment
as further detailed on the aerial site photo entitled "421 Halfmoon
Flex Park."
C. Use. The additional property will increase the allowable square footage
of development of the property to increase to accommodate additional
business development for the property consistent with the development
goals of the previously approved 421 Halfmoon Flex Park, together
with any uses permitted in the planned development district.
D. All other provisions of the previously approved 421 Halfmoon Flex
Park Planned Development planned development district and the Saratoga
Economic Development Corporation Industrial Park Planned Development
District, together with previously approved amendments, except as
modified herein, shall remain in full force and effect.