[Adopted 7-6-2004 by L.L. No. 7-2004]
This local law shall be known and may be cited us Local Law No. 7 of 2004, a local law amending Local Law No. 2 of 1995 of the Town of Halfmoon entitled "Local Law Relating to Zoning for the Town of Halfmoon," as previously amended and supplemented by the local laws and ordinances relating to zoning of the Town of Halfmoon, providing for the creation of a planned development district to be known as "Forum Industries Planned Development District."
Local Law No. 2 of 1995 of the Town of Halfmoon, entitled "Local Law Relating to Zoning for the Town of Halfmoon," and the Zoning Map of the Town of Halfmoon, as set forth and enacted in Local Law No. 2 of 1995, as previously amended and supplemented by the zoning ordinances of the Town of Halfmoon, as adopted, be and the same hereby are amended by creating the "Forum Industries Planned Development District."
The area of said Forum Industries Planned Development District is bounded and described as set forth in Exhibit A attached hereto and made a part hereof and as shown on a certain site plan map thereof prepared by ABD Engineers & Surveyors, dated July, 2004, entitled "Planned Development District - Industrial Concept Plan Office & Yard for AJS Masonry."
[1]
Editor's Note: PDD maps and plans are on file in the Town's offices.
There shall be developed within the area of said Forum Industries Planned Development District the main office and maintenance/storage yard of AJS Masonry, and a nine-thousand-six-hundred-square-foot maintenance\storage garage.
A. 
The storage yard would not be used to stock job materials. The yard will store leftover pallets or masonry block to be used for future repair and maintenance of buildings constructed by AJS. There will be no waste piles of materials stored. The storage and maintenance building will be used to store tools, mixers, etc. and to maintain equipment.
B. 
The existing building previously used as an office\maintenance garage for the junkyard will be reconstructed to be used as an office area. The building will be re-sided with masonry with a small auto parking lot constructed in front. Existing overhead doors will be removed and installed on the rear of the building.
C. 
The front of the property will be improved with removing the chain link fence and adding berms and landscaping. Remaining car parts and tires will be removed. The fence along the south property line will be replaced with a solid wood fencing and evergreen trees, all pursuant to the approved site plan.
D. 
Water service will be provided by connecting to the existing waterline on Dunsbach Road. The buildings will be served by individual on-site septic system.
E. 
A stormwater management system will be installed to assure that adjacent and downstream properties, both public and private, will not suffer increased flooding or runoff. An approved stormwater management plan will be submitted with appropriate easements, bonds, letters of credit, title insurance, and maps.
F. 
No facilities which require exhaust stacks for manufacturing processes or process emissions will be permitted. Minor exhaust stacks may be allowed for maintenance and repair activities which are incidental to the primary use of the lots.
G. 
Visual impacts will be minimized through the use of buffer areas, setbacks, architectural design and screening, such as berms, fences and plant construction materials for the district area as a whole and for each developed site as shown on and approved by the Planning Board during final site plan and subdivision review.
H. 
Approval of the Town of Halfmoon for the water distribution system when connected to a municipal source will be obtained.
I. 
The area described is approximately 18.9 acres in size and is located on Dunsbach Road.
J. 
Before construction of Forum Industries Planned Development District is started or any building permit is issued relating thereto, final plans and specifications shall be submitted to the Planning Board of the Town of Halfmoon and filed with the Town Clerk of the Town of Halfmoon. Planning Board approval is required prior to subdivision and for site plan and prior to construction on any lot.
K. 
Remediation of the contaminated areas of the site shall be completed in accordance with the environmental audit submitted as part of the application.
L. 
During the construction of Forum Industries Planned Development District, there shall be constructed, as set forth as part of the plans and specifications to be approved by the Planning Board of the Town of Halfmoon, parking areas providing sufficient parking for all plants or buildings with required handicap areas, curbs and walks, landscape, buffer, etc., as required by the Planning Board.
M. 
Buffers required will be installed per Planning Board directions.
All improvements shall be designed and constructed pursuant to plans and specifications approved by a duly licensed architect and/or engineer and in strict compliance with the New York State Building Code. The Planning Board shall not give approval as referred to in said Local Law Relating to Zoning, Section 1002, paragraph 8[1] unless and until all approvals required by each and every other government or governmental entity have been obtained. The architect or engineer performing the work herein described shall be employed by and at the expense of the developer. All construction during performance thereof and upon completion shall be subject to the inspection and approval of the Enforcement Officer of the Town of Halfmoon. All roads and/or streets to be constructed within the project limits pursuant to this local law shall be constructed pursuant to specifications at the time in effect for the construction of Town highways in the Town of Halfmoon. Any water distribution system must and shall be connected to public or municipal facilities and constructed and inspected according to Town Standards.
[1]
Editor's Note: See now § 165-54H in the Zoning chapter.
As per Town rules and regulations.
This amendment shall be deemed automatically revoked and void and the previous regulations and laws shall obtain if, within one year from the approval of the Planning Board of the Town of Halfmoon for the construction of the project, commencement of the construction of Forum Industries Planned Development District has not begun or if after construction has begun unless substantial progress continues without undue interruption thereafter or if the development is not complete within four years of such approval. As to the area within which a building or buildings have been constructed pursuant to this local law, there shall be no voiding of the amendment, and as to said area and building or buildings, this amending local law shall continue in full force and effect and the area zoned by this local law shall be the area within which said building or buildings was or were constructed pursuant to this amending local law. For proper cause shown, the Town Board of the Town of Halfmoon may, upon such terms and conditions as it deems proper, extend either the one-year period or the four-year period, or both, and/or may waive the requirement that substantial progress shall continue without undue interruption. Any such extension of time or waiver may be made by the Town Board without a public hearing. In the event no application is made to the Planning Board for final site plan approval within one year of this local law, or substantial progress is not made on said application within two years thereafter, this local law shall be deemed automatically revoked and the previous zoning shall apply.
Said Local Law 2 of 1995, Zoning Map, is hereby amended by providing that Forum Industries PDD be set forth on a supplementary map which is hereby made a part of this local law as Exhibit B. The property set forth on such map is the real property described in the description annexed hereto made by the ABD Engineers and Surveyors, which is hereby made a part of this local law as Exhibit B.
[1]
Editor's Note: PDD maps and plans are on file in the Town's offices.