[Amended 4-6-1998 by L.L. No. 2-1998]
The purpose of the Land Conservation District
(hereinafter "L-C") is to delineate, preserve, protect and conserve
wetlands and streams and their respective regulated adjacent areas,
as designated by the New York State Department of Environmental Conservation,
and to preserve natural floodplains, as designated by the Town of
Clifton Park. It is the policy of the Town of Clifton Park to preserve
these natural resources and the benefits derived therefrom, prevent
the destruction and despoliation of such areas and to regulate development
in these areas such that their natural benefits are secured, consistent
with the general welfare and beneficial social and economic development
of the Town.
[Amended 4-6-1998 by L.L. No. 2-1998]
A. The locations and boundaries shall be as follows:
(1)
Freshwater wetlands. The L-C boundaries associated
with wetlands consist of those freshwater wetlands inventoried and
mapped by the New York State Department of Environmental Conservation
pursuant to Article 24 of the Environmental Conservation Law and the
one-hundred-foot adjacent area measured horizontally from the border
of the wetland.
(2)
Stream. Classified streams located in the Town
of Clifton Park that have been indexed and/or mapped by the New York
State Department of Environmental Conservation, and a fifty-foot adjacent
area (buffer) on each side of the outer bank of the high-water mark,
except that:
(a)
The buffer area for the Stony Kill (Stony Creek)
downstream from the Stony Creek Reservoir will be 100 feet from each
side of the outer bank of the high-water mark.
(b)
The buffer area for the Cooley Kill downstream
from Carlton Road until it reaches the Dwaas Kill will be 100 feet
from each side of the outer bank of the high-water mark.
(c)
The buffer area for that portion of the Dwaas
Kill downstream from Kinns Road will be 100 feet from each side of
the outer bank of the high-water mark.
(d)
The buffer area for that portion of the Alplaus
Kill, which is in Clifton Park will be one hundred feet from each
side of the outer bank of the high-water mark.
(3)
In addition to the buffer area described in
Subsection B(2) above, for streams within the Town of Clifton Park
that are listed under Section 303 (d) of the Federal Clean Water Act,
applicants for new construction projects disturbing one acre or more
shall employ site specific stormwater management strategies to prevent
adverse impacts upon such waters.
[Added 12-17-2007 by L.L. No. 13-2007]
(4)
Floodplains. The L-C boundaries associated with
floodplains are defined by the official flood boundary and floodway
map (FBFM) of the community published by the Federal Emergency Management
Agency.
B. Each applicant for a building permit, soil disturbance
permit, subdivision or site plan within or containing areas zoned
L-C due to freshwater wetlands shall contact the New York State Department
of Environmental Conservation to verify the exact location of the
wetlands boundaries and regulated adjacent areas. A copy of the delineation
must be filed with the Planning and Zoning Department, who will distribute
it to other affected departments within the Town of Clifton Park.
[Amended 12-12-2022 by L.L. No. 3-2022]
[Amended 12-9-1996 by L.L. No. 11-1996; 4-6-1998 by L.L. No. 2-1998]
A. To promote the purposes of this article, no building
or structure shall be built, expanded or altered and no land shall
be expanded or altered for any purpose within the areas depicted on
the Official Zoning Map as L-C other than for:
(1)
Park, residential boat launch, nature preserve,
game preserve or other similar use, provided that the use is in accordance
with the purposes set forth in this chapter, including accessory structures
which are an integral part of the uses listed in this subsection.
(2)
Utility work and repairs and utility transportation
systems, including (but not limited to) water, sewer and cable crossings.
(3)
Roadway or driveway crossings, provided that
the applicant demonstrates that there is no other reasonable means
of access available and the applicant obtains appropriate permits
from the New York State Department of Environmental Conservation.
(4)
Creation of freshwater wetlands as part of required
mitigation for losses of wetlands on site or off site.
B. Other uses and other buildings and structures as provided
for by the following sections:
(1)
Only the following special uses shall be considered pursuant to §
208-79 et seq.:
(a)
Selective cutting of timber, per Chapter
184 of the Code of the Town of Clifton Park.
(b)
Telecommunication towers as defined in §
208-95B.
(2)
Temporary uses and structures, per §
208-96, provided that the activity is in support of permitted construction within the L-C Zone.
C. Application for uses that are not considered permitted uses (as described in the preceding subsections) will be reviewed pursuant to the review application procedure in Chapter
124, Freshwater Wetlands and Stream Protection, the standards indicated in §
208-69.3 of this chapter and the variance procedures given in §
208-109, Board of Appeals, of the Code of the Town of Clifton Park.
[Amended 4-6-1998 by L.L. No. 2-1998]
A. Each application for a building permit, soil disturbance permit, subdivision or site plan within or containing areas zoned L-C due to freshwater wetlands shall be reviewed for conformance with Chapter
124 of the Code of the Town of Clifton Park; in addition, the applicant must furnish sufficient data to demonstrate that the proposed activity will not result in any of the following:
(1)
Alteration of aquifer capacities.
(2)
Reduction of flood-carrying capacities of watercourses
or increased hazards associated with flooding.
(3)
Deterioration of water quality or impairment
of best usage of waters.
(4)
Alteration of water retention capabilities;
increase in siltation of surface water bodies and adjacent areas.
(5)
Significant disturbance to fish and wildlife
populations and natural plant communities.
(6)
Impairment of any natural function of a wetland
or its adjacent buffer area.
(7)
Alteration of the flow pattern of a watercourse
area.
(8)
Increase in the velocity of surface water runoff.
B. For any projects involving work in areas of special flood hazard, project review shall be conducted pursuant to Chapter
119, Flood Damage Prevention, of the Code of the Town of Clifton Park.
The following requirements apply to the uses delineated at §
208-69.2 hereinabove:
A. Area. The minimum area for any application pursuant
to this article shall be 100,000 square feet.
B. Front yards. Each proposal pursuant hereto shall include
a front yard with a depth of not less than 80 feet.
C. Rear yards. Each proposal pursuant hereto shall include
a rear yard with a depth of not less than 50 feet.
D. Side yards. Each proposal shall include two side yards,
each having a minimum width of 20 feet.
E. Height. For each foot by which the height of a building
or other structure exceeds 35 feet, the total width of each of the
two side yards shall be increased by two feet.