A.
It shall be unlawful for any person to place, deposit
or permit to be deposited in an unsanitary manner upon public or private
property within the Township any human or animal excrement, garbage
or other objectionable waste.
B.
It shall be unlawful to discharge to any natural outlet
within the Township any sanitary sewage, industrial wastes or other
polluted waters except where suitable treatment has been provided
in accordance with subsequent provisions of this chapter and any applicable
laws of the Commonwealth of Pennsylvania relating to sewage and industrial
waste.
C.
Except as hereinafter provided, it shall be unlawful
to construct or maintain any privy, privy vault, septic tank, cesspool,
field drains or other facility intended or used for the disposal of
sewage.
A.
It shall be the duty of every owner of premises abutting
on any portion of a public sanitary sewer or through which such sewer
may pass, within 60 days of service of notice, or in case of the erection
of a new building on any such premises after the sewer has been made
ready for public use, then within 60 days from the completion of such
new building, to cause each old or new building thereon erected requiring
sewage drainage and located within 150 feet of such sewer to be separately
connected therewith, provided that in every instance all connections
shall be made directly to the sewer and not through any intermediate
well, and provided further that from and after the expiration of 60
days from the service of notice of the completion of any such sewer
as aforesaid, no well shall be used for sewage drainage from any building
within 150 feet of such sewer.
B.
The Township shall deem it necessary for the public health to require that any building erected on premises abutting on, adjoining or adjacent to any public sanitary sewer, wheresoever any such building may be located on such premises, shall be connected with such sewer, the appropriate control authority shall report the matter to the Board of Supervisors, and after receiving the approval and authorization of said Board in any such case, shall thereupon cause to be served upon the owner or owners of any such building, in the manner hereafter provided, a copy of Part 2 of this chapter and a printed or written notice directing that the necessary connections be made within 60 days from the date of its service.