There is hereby ordained by the Township Council
for the Township of Monroe, Gloucester County, New Jersey, pursuant
to the provisions of New Jersey Municipal Land Use Law (N.J.S.A. 40:55D-1
et seq.) and to implement the Pinelands Protection Act (N.J.S.A. 13:18A-1
to 18A-29) and the Pinelands Comprehensive Management Plan, a Comprehensive
Land Management Ordinance for the purpose of and in order to effectuate
the Master Plan, enacted to guide the appropriate development and
redevelopment of land in a manner which will promote the public health,
safety, morals and general welfare; regulate the use of land within
zoning districts; secure safety from fire, flood, panic and other
natural and man-made disasters; provide adequate light, air and open
space; limit and restrict buildings according to their type and the
nature and extent of their use and regulate the nature and extent
of the use of land for all purposes; regulate the bulk, height, number
of stories and size of buildings and other structures; avoid a conflict
with the development and general welfare of neighboring municipalities,
the county and the state; establish appropriate population densities
and concentrations contributing to the well-being of persons, neighborhoods,
communities and regions and the preservation of the environment; provide
sufficient space for residential, recreational, commercial and industrial
uses and open space; encourage the location and design of transportation
routes which will promote the free flow of traffic while discouraging
the location of such facilities and routes which result in congestion
or blight; promote a desirable visual environment through creative
development techniques and good civic design and arrangement; promote
the conservation of open space and valuable natural resources and
prevent urban sprawl and degradation of the environment through improper
use of land; encourage coordination of various public and private
procedures and activities shaping land development with a view of
lessening the cost of such development and to the more efficient use
of land; encourage planned development which incorporate the best
features of design and relate the type, design and layout of residential,
commercial, industrial and recreational development to the particular
site; encourage senior citizen community housing construction; promote
the conservation of energy through the use of planning practices designed
to reduce energy consumption and to provide for maximum utilization
of renewable energy sources; and preserve and protect the significant
and unique resources of the Pinelands.
[Amended 5-21-1990 by Ord. No. O-11-90]
A. A zoning permit issued by the Township Zoning Officer
shall be required immediately after any commercial change of ownership,
and prior to any tenant change, change of business name or change
of a use or the erection, construction, reconstruction, alteration,
conversion or installation of a structure or building and which acknowledges
that such use, structure or building complies with the provisions
of the Municipal Zoning Ordinance or variance therefrom duly authorized
by a municipal agency.
[Amended 7-28-2022 by Ord. No. O:14-2022; 7-24-2024 by Ord. No. O:35-2024]
(1) A permit application for all exterior work that extends outside of
the principal structure will require to be accompanied by a sealed
land survey by a NJ licensed land surveyor that shall contain the
following:
(a)
The land survey must be in the owner's name (except that
a survey from a new construction home will be transferrable to the
first owner only).
(b)
Full original copy with title block and seal.
(c)
Include all improvements on the property, scaled to the best
of the applicant's ability, and ensure all permits have been
obtained.
(d)
Propose new work and state proposed setbacks from property line
to proposed work, scaled to the best of the applicant's ability.
(e)
Except that if a property owner is required to have an as-built land survey for any other project within the last 10 years as part of their permit approvals (i.e., additions, in-ground pools, storage buildings, etc., per §
175-117.1).
(2) Any proposed improvement 500 square feet or more will require Township Engineer Review per §
175-117.1 for lot grading review.
(3) Solar rooftop installations will not require a land survey for a
zoning permit application.
B. Duration of permit. A zoning permit issued by the Zoning Officer shall be valid for a period of one year from its date of issuance. A one-year extension may be obtained in accordance with §
74-36.
[Added 2-26-2020 by Ord. No. O:05-2020]
C. A certificate of compliance issued by the Township Zoning Officer shall be required prior to the issuance of any certificate of occupancy. This certificate of compliance shall indicate that any construction, reconstruction, erection, alteration, conversion or installation of a structure, building or on-site or off-site improvements have been accomplished in accordance with the plans, specifications, terms and conditions of any municipal, county or state approval or that sufficient guaranties have been issued to the Township to ensure their completion. Said guaranties shall equal not less than 120% of the total cost of completion as agreed to by the Township Engineer. The Zoning Officer may direct any Township official or employee to aid in said determination of compliance and may require the deposit of escrow fees up to the extent indicated for a project category in Article
VIII of this chapter for final approval review.
In interpreting and applying the provisions
of this chapter, they shall be held to be the minimum requirements
for the promotion of the public health, safety, comfort, convenience
and general welfare. Where the provisions of this chapter impose greater
restrictions than those of any statute, other ordinance or regulation,
the provisions of this chapter shall be controlling. Where the provisions
of any statute, other ordinance or regulation impose greater restrictions
than this chapter, the provisions of such statute, other ordinance
or regulations shall be controlling.
Any power expressly authorized by this chapter
(N.J.S.A. 40:55D1 et seq.) to be exercised by the Planning Board and/or
the Zoning Board of Adjustment shall not be exercised by any other
body, except as otherwise provided herein.
Nothing herein shall be construed to contravene
any other ordinance or state statute providing for procedures for
governing bodies (N.J.S.A. 40:55D-9a).
The Mayor may appoint one or more persons as
a citizens' advisory committee to assist or collaborate with the Planning
Board in its duties. Such person or persons shall have no power to
vote or take other action required of the Board. Such person or persons
shall serve at the pleasure of the Mayor (N.J.S.A. 40:55D-27a).
There is hereby established the office of Zoning
Officer who shall be appointed by the Township Council. The Zoning
Officer shall, along with the Construction Code Official and his office,
enforce the provisions of this chapter.
The Township Council may, upon adoption of a
salary ordinance, adopt a manner of payment of a salary and/or the
reimbursement of expenses for the members of the Planning Board, Zoning
Board of Adjustment and Site Plan Review Advisory Board.