Where a riparian buffer is required for a regulated activity,
the riparian buffer shall be established as follows:
A. The buffer shall be measured perpendicularly from the top of the
stream bank landward.
(1) High-quality or exceptional-value watersheds: a minimum of 150 feet;
(2) Impaired streams: a minimum of 150 feet;
(3) All other watersheds: a minimum of 50 feet; or
(4) As determined by a stream corridor study approved by PADEP and Mahoning
Township.
B. The riparian buffer shall be located on both sides of all perennial
and intermittent streams. The perennial and intermittent streams and
the riparian buffer boundaries shall be shown on all applications
for building permits, subdivision, or land development. Existing uses
within the buffer are permitted to continue but not be expanded. Placement
of new structures or roadways within the riparian buffer shall be
prohibited, unless specifically permitted by PADEP. Where a wetland
exists within the buffer area, the buffer shall be extended landward
to provide a minimum buffer of 25 feet, as measured perpendicularly
from the wetland boundary.
C. The buffer shall be undisturbed forest consisting of appropriate
native species.
D. Where wetlands are located partially or entirely within a buffer,
the buffer shall be extended to encompass the wetland and shall be
widened by a distance sufficient to provide a twenty-five-foot riparian
forest buffer measured perpendicularly from the wetland boundary.
E. The following uses shall be permitted in the buffer:
(1) Footpaths, trails and bike paths, provided that:
(a)
Width is limited to five feet;
(b)
Width may be increased provided a corresponding increase in
the buffer is provided;
(c)
Construction shall have minimal impact to the buffer.
(2) Stream crossings, provided the crossing is designed and constructed
in such a manner as to minimize the impact to the buffer. The riparian
buffer shall be restored to its original condition, to the maximum
extent practical, upon completion of construction.
(3) Utility lines, provided that the crossing is designed and constructed
in such a manner as to minimize the impact to the inner buffer and
provided that there is no practical alternative to locating the utility
line within the buffer. The riparian buffer shall be restored to its
original condition, to the maximum extent practical, upon completion
of construction.
(4) Maintenance and restoration of the riparian buffer.
(5) Projects conducted with the objective of improvement, stabilization,
restoration, or enhancement of the stream bank, stream channel, floodplain,
watershed hydrology, riparian buffers, or aquatic habitat and maintenance
activities associated with such projects. These projects include,
but are not limited to, agricultural and stormwater management best
management practices. Such projects must receive appropriate permits
and approvals from PADEP prior to starting the project.
(6) Minor private recreational uses for the property owner. Such uses
include benches, fire rings, and similar uses. Such uses do not include
structures such as cabins, sheds, pavilions, garages, dwellings, or
similar structures.
F. Disturbance of the riparian buffer shall be limited to the area necessary
to perform an allowable use.
G. Where possible and practical, disturbances shall be installed and
restored prior to beginning the next phase.
H. Allowable activities shall not cause stormwater flow to concentrate.
I. Any vegetation removed for an allowable activity shall be replaced
immediately upon completion of the activity. Where mature trees are
removed, such trees shall be replaced with the largest practical tree
of acceptable native species.
J. E&S controls shall be installed and maintained during construction.
Evidence of an approved E&S control plan, NPDES permit or other
PADEP permit, where required, shall be submitted prior to issuance
of local permits.
K. Riparian buffers shall be maintained in a manner consistent with
sound forest management practices. In the absence of a site-specific
management plan, the following maintenance guidelines apply:
(1) Buffers shall be inspected periodically for evidence of excessive
sediment deposition, erosion, or concentrated flow channels. Prompt
action shall be taken to correct these problems and prevent future
occurrence.
(2) Trees presenting an unusual hazard of creating downstream obstructions
shall be removed. Such material shall be removed from the floodplain
or the riparian forest buffer (whichever is widest); or cut into sections
small enough to prevent the possibility of creating obstructions downstream.
Wherever possible, large stable debris should be conserved.
(3) Vegetation should be inspected periodically to ensure diverse vegetative
cover and vigorous plant growth consistent with buffering objectives.
(a)
Remove invasive plant species that may threaten the integrity
of the buffer.
(b)
Periodic cutting of trees may be necessary to promote vigorous
growth and encourage regeneration.
(4) Excessive use of fertilizers, pesticides, herbicides, and other chemicals
shall be avoided. These products should be used only when absolutely
necessary to maintain buffer vegetation.
For all riparian buffers, an easement shall be provided:
A. Easements shall be in accordance with §
202-30 and recorded in accordance with §
202-47 of this chapter.