The Town Board of the Town of Southeast wishes to
establish a uniform fee collection policy for new connections in special
districts providing water and sewage treatment.
At present, in several districts, the practice has
been to permit payment of fees after connection, which practice has
resulted in fee payment collection problems, and the Town Board desires
to remedy such problem.
The estimated cost of such connection plus 10%
thereof shall be paid in advance of connection; and if the actual
cost exceeds the estimate, such excess shall be paid within 30 days
after connection.