All sidewalks, whether bituminous concrete or
cement concrete, interfered with during the construction of sanitary
sewer main and/or sewer service connections shall be rebuilt by the
contractor in accordance with the following specification:
A. Cement concrete. The foundation shall be at least
six inches of well-compacted bank-run gravel. The concrete shall be
3,000 pounds in strength, four inches in thickness, reinforced with
No. 4 four-inch by six-inch mesh and wood flat finished. Expansion
joints (3/4 inch open) shall be provided at least every 20 feet; dividing
joints shall be of an approved type. It shall be compacted to 95%
of its optimum density.
B. Bituminous concrete. The foundation shall be 12 inches
of bank-run gravel as specified above (material and compaction). The
wearing surface shall be laid in two courses, a one-and-one-half-inch
bottom course and a one-inch top course, thickness measured after
compaction. The material and application shall conform to the specifications
outlined for roadway surfacing. All edges of the walks shall be formed
with wood screeds which are securely anchored and left in placed.
The sidewalk shall meet existing sidewalk widths and have a slope
of 1/4 inch per foot from the back edge of the sidewalk towards the
roadway.