[HISTORY: Adopted by the City Council of the City of New Kensington: Art. I, 11-16-1977 as Ord. No. 11-77 (Part 9, Art. 939 of the 1977 Code); Art. II, at time of adoption of Code (see Ch. 1, General Provisions, Art. I). Amendments noted where applicable.]
GENERAL REFERENCES
Flood damage prevention — See Ch. 121.
Sewers — See Ch. 169.
Zoning — See Ch. 236.
[Adopted 11-16-1977 as Ord. No. 11-77 (Part 9, Art. 939 of the 1977 Code)]
On and after the effective date of these rules and regulations, it shall be unlawful to permit the discharge of stormwaters, i.e., roof drains, foundation drains, area drains or other sources of surface water or groundwater, from all buildings and/or premises in the City of New Kensington other than in accordance with the provisions hereinafter set forth. Hereinafter, "stormwaters" shall be defined to include roof drains, foundation drains, area drains or other sources of surface waters or groundwaters.
Every premises or building within the City of New Kensington shall be separately and independently connected with a public storm sewer where there is such sewer adjoining the lot or parcel of land on which such building stands.
Every premises or building within the City of New Kensington shall be separately and independently connected with a public storm sewer or natural waterway where there is such a sewer or natural waterway available to the premises or building. The availability shall be determined by the City Engineer, who shall take into consideration the distance from said storm sewer or natural waterway to said premises or building, the topography and flows and the economic burden imposed upon the property owner. The City Engineer's decision shall be final unless an appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the City Engineer.
No permit shall be issued for the construction of any building in the city on any lot or any parcel of land where there is a storm sewer adjoining or available to such lot or parcel of land unless the plans and specifications show connections in compliance with this Article or unless said plans and specifications show some means of discharging stormwaters satisfactory to said City Engineer, whose decision shall be final unless an appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the City Engineer.
Upon the construction of a storm sewer adjacent to or available to a building in existence prior to the construction of said storm sewer, the property owner shall submit plans for the discharge of stormwaters into such storm sewers to the City Engineer for approval within 30 days of the completion of such construction, and connection shall be made to said storm sewer within 90 days of the completion of such storm sewer construction. The City Engineer's decision shall be final unless an appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the City Engineer.
No stormwaters shall be discharged into the sewage collection system of the City of New Kensington or the Municipal Sanitary Authority of the City of New Kensington.
No stormwaters shall be discharged in concentrated flow upon, over or through the premises of any adjacent property owner without first obtaining the written, recordable permission of said adjacent property owner and the approval of the City Engineer.
No stormwaters shall be discharged in concentrated flow upon, over or through the sidewalks open to the general public if in so doing an icy, dangerous or otherwise hazardous condition is created or damage done to said sidewalk or the premises of an adjacent property owner.
All buildings, parts of buildings and structures of any nature shall be provided with a stormwater disposal system for conducting stormwater from such premises to a storm sewer or other means of disposal approved by the City Engineer, whose decision shall be final unless an appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the City Engineer.
In no event, with or without the approval of the City Engineer, shall such stormwaters be discharged in such a manner that the walls or foundations of any adjacent or nearby property owners or the land of any adjacent or nearby property owners suffers any damage, and, if any damage so results, it is and shall remain the sole liability of the property owner discharging said stormwaters, and appropriate remedial action shall be taken immediately.
[Amended 11-8-1985 by Ord. No. 3-85]
A. 
All stormwater drains from all buildings, parts of buildings and structures of any nature shall be subject to the present and future inspection and reinspections of the City Engineer and/or his duly designated assistants or aides, and such persons may enter upon any premises within the City of New Kensington to conduct such inspections, and, if so denied by the property owner, the property owner shall be presumed to be in violation of this Article and shall have 30 days to submit a plan showing the disposal of all storm- and surface waters, duly certified by a registered engineer licensed by the Commonwealth of Pennsylvania, for approval by the City Engineer. Upon failure to do so or upon failure to obtain the approval of the City Engineer because of noncompliance with the requirements set forth in this Article, the property owner, tenant or occupant found in violation shall be subject to the provisions of § 178-18 of this Article.
B. 
If any property owner, tenant or occupant has previously done corrective work in order to comply with the provisions of this Article and then by act or omission again fails to comply with the provisions of this Article, such persons, person, firm, entity or corporation shall be deemed guilty of a summary offense and shall not be granted the procedural provisions of § 178-16 of this Article but shall be immediately subject to the provisions of § 178-18 of this Article.
C. 
The City Engineer's decision shall be final unless appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the City Engineer.
It shall be unlawful to occupy and/or use any building or structure of any nature in violation of this Article or any of the provisions of this Article, and any violations beyond 30 days shall constitute an additional and separate violation for each day of use or occupancy beyond said 30 days, provided that the City Engineer may give written permission for such occupancy to continue beyond 30 days if the property owner submits plans within said period of 30 days and the same are approved by the City Engineer and the corrective work begins forthwith and is completed within 90 days.
Any property owner, tenant or occupant found violating any provision of this Article shall be served with written notice stating the nature of such violation. Whereupon, the violator shall have 30 days to submit a plan to and have it approved by the City Engineer, and, upon approval, the violator shall have 90 days from the date of such approval within which to do the corrective work indicated by such plan. If immediate damage or injury to person or property is resulting, then immediate remedial action shall be taken by the property owner and diligently pursued until the work is completed. The City Engineer's approval or disapproval of said plan and corrective work shall be final unless an appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the City Engineer, and further provided that such notice of any violation or appeal shall not act to stay any hearing on the summary offense or offenses otherwise provided for by the within Article.
If any person, firm, entity or corporation so desires, appeal may be made to the Code Hearing Board of the City of New Kensington to grant relief from the provisions of this Article, provided that such appeal is duly filed within five days of the receipt of written notice setting forth the violations, as provided in § 178-13 above, and further provided that such appeal shall not act to stay any hearing on the summary offense or offenses otherwise provided for by the within Article.
If no storm sewer is adjacent or available, it shall be permitted to drain stormwater to the street curb or a natural waterway after submission of a plan to and approval by the City Engineer as provided herein, but if a storm sewer becomes adjacent or available in the future, it shall remain the obligation of the property owner to interconnect with said storm sewer.
[Amended 10-10-2000 by Ord. No. 4-00]
If not otherwise provided herein, the following procedure shall be observed:
A. 
The property owner, tenant or occupant shall be placed on notice, in writing, by the New Kensington Municipal Sanitary Authority of any violation of the within article, and the person, persons, firm, entity or corporation so placed on notice shall remain primarily responsible.
B. 
The notified party shall submit a plan for approval to the New Kensington Municipal Sanitary Authority within 30 days of receipt of said notice, and, if any resubmission of said plan is required, the same must be approved within the same thirty-day period. The New Kensington Municipal Sanitary Authority's failure to act and respond within seven days shall extend said thirty-day period by the same number of days beyond seven during which the New Kensington Municipal Sanitary Authority has failed to act and respond.
C. 
Upon receipt of approval by the New Kensington Municipal Sanitary Authority, a period of 90 days from the date of receipt of such approval shall be allowed, within which period the corrective work shall be completed.
D. 
The New Kensington Municipal Sanitary Authority's approval or disapproval of said plan and corrective work shall be final unless an appeal is made by the aggrieved party to the Code Hearing Board of the City of New Kensington within 10 days of receipt of notice from the New Kensington Municipal Sanitary Authority as to his decision.
This article shall be supplemental to and not in derogation of existing ordinances.
[Amended 12-20-1994 by Ord. No. 2-94]
Any person, firm, entity or corporation violating this Article shall be deemed guilty of a summary offense and, for any violations continuing beyond the time limits provided herein, shall be deemed guilty of an additional offense or offenses and, upon conviction thereof, shall be fined in an amount not to exceed $300 for each violation and $600 for each additional violation, and further provided that any appeal to the Code Hearing Board of the City of New Kensington shall not act to stay any hearing on the summary offense or offenses otherwise provided for by the within Article. In the event of any conflict with other provisions herein, this section shall prevail.
[Adopted 12-20-1994 by Ord. No. 2-94]
This Article is adopted and implemented to achieve the following general purposes and objectives:
A. 
To manage stormwater runoff resulting from land alteration and disturbance activities in accordance with the watershed stormwater management plans adopted by Westmoreland County as required by the Pennsylvania Stormwater Management Act (Act 167 of 1978, as amended).[1]
[1]
Editor's Note: See 32 P.S. § 680.1 et seq.
B. 
To utilize and preserve the desirable existing natural drainage systems and to preserve the flood-carrying capacity of streams.
C. 
To encourage natural infiltration of rainfall to preserve groundwater supplies and stream flows.
D. 
To provide for adequate maintenance of all permanent stormwater management structures in the municipality.
The provisions of this Article shall apply to all developments, improvements, subdivisions, land developments and environmental disturbances unless specifically exempted or otherwise modified herein.
For the purposes of this article, the following terms shall have the meanings indicated:
ACT
The Stormwater Management Act (Act of October 4, 1978, P.L. 864, No. 167, 32 P.S. § 680.1 through § 680.17, as amended by Act of May 24, 1984, No. 63).
APPLICANT
A landowner or developer, as defined by this Article, who has filed an application for a land development or for a development, including his/her heirs, successors and assigns.
CHANNEL
A natural stream that conveys water; a ditch or open channel excavated for the flow of water.
CONFLUENCE
Points where watercourses join together.
CONSERVATION DISTRICT (WCCD)
The Westmoreland County Conservation District.
COUNTY
The County of Westmoreland, Pennsylvania.
CULVERT
A pipe, conduit or similar structure, including appurtenant works, which carries a stream under or through an embankment or fill.
DAM
Any artificial barrier, together with its appurtenant works, constructed for the purpose of impounding or storing water or a structure for highway, railroad or other purposes which may impound water.
DESIGN STORM
The magnitude of precipitation from a storm event measured in probability of frequency of occurrence (e.g., fifty-year storm) and duration (e.g., 24 hours) and used in computing stormwater management control systems.
DETENTION
The slowing, dampening or attenuating of runoff flow entering the natural drainage pattern or storm drainage system by temporarily holding water on a surface area, such as detention basins, reservoirs, on rooftops, in streets, parking lots or within the drainage system itself, and releasing the water at a desired rate of discharge.
DETENTION BASIN (STORAGE FACILITY)
A basin designed to retard stormwater runoff by temporarily storing the runoff and releasing it at a predetermined rate. A detention basin can be designed to drain completely after a storm event or it can be designed to contain a permanent pool of water.
DEVELOPER
Any landowner, agent of such landowner or tenant with the permission of such landowner who makes or causes to be made a subdivision, land development or development.
DEVELOPMENT
Any activity, construction, alteration, change in land use or similar action that affects stormwater runoff characteristics.
DEVELOPMENT SITE
A lot, parcel or tract of land on which development is taking place or is proposed.
DISCHARGE
Rate of flow, specifically fluid flow; a volume of fluid flowing from a conduit or channel or being released from detention storage, per unit of time; commonly expressed as cubic feet per second (cfs), million gallons per day (mgd), gallons per minute (gpm) or cubic meters per second (cms).
DISCHARGE CONTROL POINT
A point of hydraulic concern, such as a bridge, culvert or channel section, for which the rate of runoff is computed.
DRAINAGE
Interception and removal of excess surface water or groundwater from land by artificial or natural means.
DRAINAGE AREA
The contributing area to a single drainage basin, expressed in acres, square miles or other units of area, also called a "catchment area" or "river basin"; the area served by a drainage system or by a watercourse receiving storm- and surface water.
DRAINAGE EASEMENT
A right granted by a landowner to a grantee allowing the use of private land for stormwater management purposes.
ENCROACHMENT
Any structure or activity which in any manner changes, expands or diminishes the course, current or cross section of any watercourse, floodway or body of water.
ENGINEER (CITY ENGINEER)
A professional engineer duly appointed as the engineer for the City of New Kensington.
EROSION
The wearing away of the land surface by running water, wind, ice or other geological agents, including such process as gravitational creep.
EXCAVATION (CUT)
Any act by which soil or rock is cut into, dug, quarried, uncovered, removed, displaced or relocated, and shall include the conditions resulting therefrom.
FLOODPLAIN
A normally dry land area adjacent to stream channels that is susceptible to being inundated by overbank stream flows. For regulatory purposes, the Flood Plain Management Act (Act of October 4, 1978, P.L. 851, No. 166)[1] and regulations pursuant to the Act define the "floodplain" as the area inundated by a one-hundred-year flood and delineated on a map prepared by the Federal Emergency Management Agency (FEMA).
HYDRAULICS
The branch of engineering concerned with the mechanics of fluids, especially liquids. As applied in stormwater management, the study of the characteristics of water flow in, and conveyance capacity of, a watercourse, considering such factors as depth, velocity and turbulence.
HYDROGRAPH
A graph showing, for a given point on a stream or for a given point in any drainage system, the discharge, stage, velocity or other property of water in respect to time.
HYDROLOGY
The science dealing with the waters of the earth and their distribution and circulation through the atmosphere. Engineering hydrology deals with the application of hydrologic concepts to the design of projects for use and control of water.
IMPERVIOUS MATERIAL OR SURFACE
Material which resists the entrance or passing through of water or other liquids.
LAND DEVELOPMENT
As defined by the Municipalities Planning Code, 53 P.S. § 10107(a).
LAND DISTURBANCE
Any activity involving grading, tilling, digging or filling or stripping of vegetation or any other activity which causes land to be exposed to the danger of erosion.
MUNICIPALITY
The City of New Kensington, Westmoreland County, Pennsylvania.
OBSTRUCTION
Any structure or assembly of materials, including fill, above or below the surface of land or water; any activity which might impede, retard or change flood flows; an encroachment.
OUTFALL
Points or areas at which stormwater runoff leaves a site, which may include streams, storm sewers, swales or other well-defined natural or artificial drainage features, as well as areas of dispersed overland flows.
OUTLET STRUCTURE
A structure designed to control the volume of stormwater runoff that passes through it during a specific length of time.
PaDER
Pennsylvania Department of Environmental Resources.
PEAK RATE OF RUNOFF (OR DISCHARGE)
The maximum rate of flow of water at a given point and time resulting from a predetermined storm.
PERFORMANCE STANDARD
A standard which establishes an end result of outcome which is to be achieved but does not prescribe specific means for achieving it. The release-rate percentage is an example of a "performance standard."
PERVIOUS MATERIAL
Material which permits the passage or entrance of water or other liquid.
POINT OF INTEREST
A point of hydrological and hydraulic importance used for computing a release-rate percentage. These may include points of stream confluences, an existing obstruction or problem area or other similar points.
RATE OF RUNOFF
Instantaneous measurement of water flow expressed in a unit of volume per unit of time, also referred to as "discharge." Usually stated in cubic feet per second (cfs) or gallons per minute (gpm).
REGISTERED PROFESSIONAL ENGINEER
An engineer licensed in the Commonwealth of Pennsylvania.
SCS
Soil Conservation Service, United States Department of Agriculture.
SEDIMENT
Solid material, both mineral and organic, that is in suspension, is being transported or has been moved from its site of origin by air, water, gravity or ice and has come to rest on the earth's surface.
SEDIMENTATION
The process by which mineral or organic matter is accumulated or deposited by moving wind, water or gravity.
SEDIMENT BASIN
A barrier or dam built at a suitable location to retain rock, sand, gravel, silt or other material.
SMALL DEVELOPMENT
Any subdivision, development or land development which results, or will result when fully constructed, in the creation of 3,000 square feet or less of impervious surface area.
SOIL COVER COMPLEX METHOD
A method of runoff computation developed by the United States Soil Conservation Service and found in its publication Urban Hydrology for Small Watersheds, Technical Release No. 55, SCS, January 1975 (or most current edition).
SPECIFICATION STANDARD
A standard which prescribes the exact characteristics to be used, leaving little choice to the applicant. The design standards for storm sewers are "specification standards."
STORAGE FACILITY
See "detention basin."
STORM SEWER
A sewer that carries intercepted surface runoff, street water and other wash waters or drainage, but excludes domestic sewage and industrial wastes.
STORM SEWER DISCHARGE
Flow from a storm sewer that is discharged into a receiving stream.
STORMWATER COLLECTION SYSTEM
Natural or engineered structures which collect and transport stormwater through or from a drainage area to the point of final outlet, including but not limited to any of the following: conduits and appurtenant features, canals, channels, ditches, streams, culverts, streets and pumping stations.
STORMWATER MANAGEMENT PLAN
The plan for managing stormwater runoff from a specific development site.
STREAM
A watercourse.
SWALE
A low-lying stretch of land which gathers or carries surface water runoff.
TIME OF CONCENTRATION
The time period necessary for surface runoff to reach the outlet of a subarea from the hydraulically most remote point in the tributary drainage area.
VOLUME OF STORMWATER RUNOFF
Quantity of water normally measured in inches, cubic feet or acre-feet, measured or determined analytically from runoff coefficients; rainfall/runoff ratios; and areas underneath hydrographs.
WATERCOURSE (WATERWAY)
Any channel of conveyance of surface water having a defined bed and banks, whether natural or artificial, with perennial or intermittent flow.
[1]
Editor's Note: See 32 P.S. § 679.101 et seq.
A. 
General requirements. No final subdivision or land development plan shall be approved, no permit authorizing construction issued or any earthmoving or land disturbance activity initiated until the final stormwater management plan for the development site is approved in accordance with the provisions of this Article. This requirement shall not apply to municipal sewer, water, gas, electric or public utility company excavations for the maintenance, repair or installation of service lines or rights-of-way.
B. 
Exemption for small developments.
(1) 
At the time of application, the city shall determine if the development, environmental disturbance, subdivision or land development qualifies as a small development and, therefore, is eligible for a simplified stormwater plan submission
(2) 
A small development shall be exempt from the preparation of a stormwater management plan as specified by Subsections C and D of this section. However, such developments shall provide safe management of stormwater runoff in accordance with the performance standard of § 178-26 and as approved by the City Engineer.
(3) 
Applications for small developments shall include a plan which describes, narratively and graphically, the type and location of proposed on-site stormwater management techniques or the proposed connection to an existing storm sewer system. The plan should show accurately site boundaries, five-foot interval contours and any watercourses, floodplains or existing drainage facilities or structures located on the site. The plan must be prepared by a registered professional engineer.
(4) 
The City Engineer shall review and approve the proposed provisions for stormwater management for a small development. Where the applicant is proposing to connect to an existing storm sewer, the developer's engineer shall determine that sufficient capacity exists in the storm sewer from the point of connection to the point of outlet in the natural drainage system. The engineer shall also determine if the proposed development site is part of a larger parcel or tract for which a stormwater management plan was approved previously and, therefore, subject to any specific stormwater management control contained in the prior plan.
(5) 
For a parcel or tract of land under single ownership, only one application for a small development, as defined above, shall be permitted before requiring a stormwater management plan for the entire parcel.
C. 
Contents of preliminary subdivision/development/land development plan submission.
(1) 
General format. The stormwater plan shall contain the following information:
(a) 
Floodplain boundaries. Identify one-hundred-year floodplains on the development site (as appropriate) based on the Municipal Flood Insurance Study Maps.
(b) 
Natural features. Show all bodies of water (natural and artificial), watercourses (permanent and intermittent), swales, wetlands and other natural drainage courses on the development site or which will be affected by runoff from the development.
(c) 
Soils. Provide an overlay showing soils types and boundaries within the development site (consult county, SCS and United States Geologic Survey for information).
(d) 
Contours. Show existing and final contours at intervals of two feet. In areas with slopes greater than 15%, five-foot contour intervals may be used.
(e) 
Stormwater management controls. Show any and all existing stormwater management or drainage controls and/or structures, such as sanitary and storm sewers, swales, culverts, etc., which are located on the development site or which are located off site but will be affected by runoff from the development.
(2) 
Professional certification. The stormwater management plan (including all calculations) must be prepared and sealed by a registered professional engineer with training and expertise in hydrology and hydraulics. Documentation of qualifications may be required by the city.
(3) 
Runoff calculations. Calculations for determining pre- and postdevelopment discharge rates and for designing proposed stormwater control facilities must be submitted with the stormwater management plan. All calculations shall be prepared using the method and data prescribed by § 178-26.
(4) 
Stormwater controls.
(a) 
All proposed stormwater runoff control measures must be shown on the plan, including methods for collecting, conveying and storing stormwater runoff on site which are to be used both during and after construction.
(b) 
If the development is to be constructed in stages, the applicant must demonstrate that stormwater facilities will be installed to manage stormwater runoff safely during each stage of development.
(5) 
Easements, rights-of-way and deed restrictions. All existing and proposed easements and rights-of-way for drainage and/or access to stormwater control facilities shall be shown and the proposed owner identified. Any areas subject to special deed restrictions relative to or affecting stormwater management on the development site must be shown.
(6) 
Other permits/approvals. A list of any approvals/permits relative to stormwater management that will be required from other governmental agencies (e.g., an obstructions permit from PaDER) and anticipated dates of submission/receipt should be included with the preliminary plan submission. Copies of applications may be required by the city where they may be helpful for the stormwater plan review.
(7) 
Maintenance program. The preliminary application shall contain a proposed maintenance plan for all stormwater control facilities, in accordance with the following:
(a) 
Identify the proposed ownership entity (e.g., city, property owner, a homeowners' association or other management entity).
(b) 
Include a maintenance program for all facilities, outlining the type of maintenance activities, probable frequencies, personnel and equipment requirements and estimated annual maintenance costs. The maintenance program shall include specific requirements for during construction and for after construction.
(c) 
Identify method of financing continuing operation and maintenance if facility is to be owned by other than the city or other governmental agency.
(8) 
In addition to the requirements of this subsection, the stormwater plan must satisfy all of the requirements contained in Article I hereof pertaining to drainage systems, which is hereby incorporated by reference.
D. 
Contents of final subdivision/development/land development plan submission. The final plan submission shall contain the following:
(1) 
All information pertaining to stormwater management from the preliminary plan along with any changes.
(2) 
Final plan maps and drawings showing the exact nature and location of all temporary and permanent stormwater management controls along with design and construction specifications.
(3) 
A schedule for the installation of all temporary and permanent stormwater control measures and devices.
(4) 
An accurate survey showing all current and proposed easements and rights-of-way and copies of all proposed deed restrictions.
(5) 
A maintenance program establishing ownership and maintenance responsibilities for all stormwater control facilities (identify specific person or entity) and detailing financial requirements and sources of funding. Applicant shall submit any legal agreements required to implement the maintenance program and copies of the maintenance agreement as specified by § 178-28B.
(6) 
Financial guaranties to ensure that all stormwater controls will be installed properly and function satisfactorily.
A. 
Preapplication phase.
(1) 
Prior to submitting the preliminary subdivision/development/land development plan, applicants are urged to consult with the city, the Westmoreland County Planning Department and the County Conservation District on the requirements for safely managing stormwater runoff from the development site in a manner consistent with the city ordinances. These agencies may be helpful in providing the data that is necessary for preparing the stormwater management plan.
(2) 
Applicants are encouraged to submit a sketch plan with a narrative description of the proposed stormwater management controls for general guidance and discussion with city and other agencies.
(3) 
While strongly recommended, the preapplication phase is not mandatory, and any review comments provided by the city or other agencies are advisory only and do not constitute any legally binding action on the part of the city or any county agency.
B. 
Preliminary and final stormwater plan reviews.
(1) 
Preliminary and final plans required. Stormwater management plans, in accordance with the requirements of § 178-22D, will be submitted with the preliminary and final subdivision or land development plan application.
(2) 
Review by City Engineer and Conservation District. Preliminary and final plans will be reviewed by the City Engineer and County Conservation District. At its discretion, the city may also engage other specialists in hydrology or hydraulics to assist with the stormwater plan review. The developer will be expected to pay any review fees charged by the WCCD.
(3) 
Notification of affected municipalities. The city shall notify municipalities upstream and downstream of the development site which may be affected by the stormwater runoff and proposed management system for the site when both the preliminary and final plan applications are submitted. Copies of the plans will be made available to the municipalities upon request. Comments received from any affected municipality will be considered by the City Engineer and will be submitted with the Engineer's report to the Planning Commission and governing body.
(4) 
City Engineer's review. The City Engineer shall approve or disapprove the preliminary and final stormwater management plan based on the requirements of the city ordinances, the review by the Westmoreland County Planning Department and good engineering practice. The Engineer shall submit a written report, along with supporting documentation, to the City Planning Commission for its consideration as part of the overall subdivision or land development plan review.
(5) 
Status of the Engineer's determination. The approval/disapproval of the site's stormwater management plan by the City Engineer shall be considered final. The City Planning Commission or governing body shall not reverse the Engineer's determination by approving or disapproving the site's stormwater management plan or any specific control measure in contradiction to the Engineer's action. The Commission or governing body can request modifications or alternative approaches to the stormwater management controls, provided that these are agreed to by the City Engineer and the applicant's Engineer.
(6) 
Approval of stormwater plan required for subdivision/development/land development approval. No preliminary or final approval shall be granted for the overall subdivision or land development application until a stormwater management plan for the site has been approved.
(7) 
Permits required from other governmental agencies. Where the subdivision or land development application requires an obstruction or erosion/sedimentation permit from PaDER, the final subdivision or land development plan approval shall be conditional upon receipt of such permits. However, no building permit shall be issued or construction started until the permits are received and copies filed with the municipality.
(8) 
Costs of review by Engineer and other specialists appointed by the city. The costs of review of all stormwater plans by the City Engineer and other specialists appointed by the city shall be paid by the applicant.
(9) 
Filing fees. City Council may set a filing fee for stormwater plans, which fee may be adjusted from time to time by resolution.
Upon final subdivision/development/land development plan approval, the applicant may commence to install or implement the approved stormwater management controls, subject to the provisions of §§ 178-22D(6) above. If site development or building construction does not begin within two years of the date of final approval of the subdivision or land development plan, then before doing so, the applicant shall resubmit the stormwater management plans to verify that no condition has changed that would affect the feasibility or effectiveness of the previously approved stormwater management controls. Further, if for any reason development activities are suspended for two years or more, then the same requirement for resubmission of the stormwater management plan shall apply.
Requests for modifications in the finally approved stormwater management controls shall be submitted to the City Engineer as follows:
A. 
If the request is initiated before construction begins, the stormwater plan must be resubmitted and reviewed according to the procedures in § 178-23.
B. 
If the request is initiated after construction is underway, the City Engineer shall have the authority to approve or disapprove the modification, based on field inspection, provided that the requested changes in stormwater controls do not result in any modifications to other approved city land use/development requirements (such as required building setbacks, yards, etc.) and that the performance standards in § 178-26 are met. Notification of the Engineer's action shall be sent to the Planning Commission and governing body. The governing body may issue stay of stormwater modification within five days and require the permittee to resubmit the plan modification for full stormwater plan review in accordance with the procedures in § 178-23.
The stormwater management plan shall be designed on the following basis:
A. 
The maximum postdevelopment release rate shall be limited to the predevelopment peak discharge for each design storm return period (i.e., a release-rate percentage of 100).
B. 
Stormwater management design calculations shall be based on the Rational Method for sites less than five acres or the Soil Conservation Service TR-55 Method for sites greater than three acres. Sites between three and five acres may use either method.
C. 
The minimum storage capacity will be that volume required by routing the postdevelopment twenty-five-year, twenty-four-hour storm released at a rate not to exceed the predevelopment twenty-five-year, twenty-four-hour storm.
(1) 
For the Rational Method, storage shall be determined by using the following formula:
S = (C      - C )RA
POST   PRE
Where
S = Storage volume (cubic feet)
C = Runoff coefficient
R = 25-year, 24-hour rainfall (feet)
A = Development area (square feet)
(2) 
For the SCS TR-55 Method, storage basin detention capacity shall be calculated as described in the manual Urban Hydrology for Small Watersheds or by computer programs using those methods.
D. 
The design maximum runoff velocity for all storms less than or equal to the twenty-five-year storm shall be three feet per second.
E. 
Stormwater discharges may be retarded by temporary containment devices, including but not limited to flat rooftops, curbed or depressed parking areas, underground reservoirs and/or holding ponds on the property to be maintained by the property owner. Discharge outlets must provide for complete dewatering of the storage facility. Rip-rap, stilling basins and energy dissipators shall be required to prevent erosion from discharge points.
F. 
The developer shall secure, where necessary, any drainage easements off the property to connect the stormwater management system with an existing stream, recognized wet-weather stress or underground storm drainage line. All line designs submitted must consider and be sized to pass discharges through existing culverts and drainageways.
No erosion or sedimentation by water shall be permitted which will carry substances into the waters of the commonwealth, neighboring properties or public rights-of-way. The applicable requirements and standards set forth in Chapter 236, Zoning, shall act as the erosion and sedimentation controls and are incorporated herein by reference.
A. 
Maintenance responsibilities.
(1) 
The stormwater management plan for the development site must establish responsibilities for the continuing operation and maintenance of all proposed stormwater control facilities. The proposed maintenance plan must be consistent with the general objectives set forth in § 178-22A of this Article.
(2) 
City Council shall make the final determination on the continuing maintenance responsibilities as part of the development application review and reserves the right to accept the ownership and operating responsibility of any or all of the stormwater management controls.
B. 
Maintenance agreement for privately owned stormwater facilities.
(1) 
Prior to final approval of the site's stormwater management plan, the property owner shall sign and record a maintenance agreement covering all stormwater control facilities which are to be privately owned. The agreement shall stipulate that:
(a) 
The owner shall maintain all facilities in accordance with the approved maintenance schedule and shall keep all facilities maintained in a safe and attractive manner.
(b) 
The owner shall grant to the city the right of access for periodic inspections and any elective maintenance.
(c) 
The owner shall keep on file with the city the name, address and telephone number of the person or company responsible for maintenance activities; in the event of a change, new information will be submitted to the city within 10 days of the change.
(d) 
The owner shall establish any special maintenance funds or other financing sources, in accordance with the approved maintenance plan.
(e) 
The owner shall pay the amount due, if any, to any Special Stormwater Facility Maintenance Fund hereinafter established.
(f) 
If the owner fails to maintain the stormwater control facilities, following due notice by the city to correct the problems, the city, without waiving any other remedies, may perform the necessary maintenance or corrective work. The owner shall reimburse the city for all costs, plus 10% to cover overhead.
(2) 
Other items may be included in the agreement where determined necessary to guarantee the satisfactory maintenance of all facilities. The maintenance agreement shall be subject to the review and approval of the City Solicitor.
A. 
The City Engineer or a designated representative shall inspect the construction of the temporary and permanent stormwater management for the development site. The permittee shall notify the Engineer 48 hours advance of the completion of the following key development phases:
(1) 
Prior to starting any construction, but after all temporary erosion and sedimentation controls have been installed.
(2) 
At the completion of preliminary site preparation, including stripping of vegetation, stockpiling of topsoil and construction of temporary stormwater management and erosion control facilities.
(3) 
At the completion of rough grading, but prior to placing topsoil, permanent drainage or other site development improvements and ground covers.
(4) 
During construction of the permanent stormwater facilities at such times as specified by the City Engineer.
(5) 
Completion of permanent stormwater management facilities, including established ground covers and plantings.
(6) 
Completion of any final grading, vegetative control measures or other site restoration work done in accordance with the approved plan and permit.
B. 
No work shall commence on any subsequent phase until the preceding one has been inspected and approved. If there are deficiencies in any phase, the City Engineer shall issue a written description of the required corrections and stipulate the time by which they must be made.
C. 
If, during construction, the contractor or permittee identifies any site conditions, such as subsurface soil conditions or alterations in surface or subsurface drainage, which could affect the feasibility of the approved stormwater facilities, he must notify the City Engineer within 24 hours of the discovery of such condition and request a field inspection. The City Engineer shall determine if the condition requires a stormwater plan modification.
D. 
In cases where stormwater facilities are to be installed in areas of landslide-prone soils or other special site conditions exist, the city may require special precautions, such as soil tests and core borings, full-time resident inspectors and/or similar measures. All costs of any such measures shall be borne by the permittee.
Any person, firm or corporation who or which shall violate any of the provisions of this Article shall, upon conviction thereof, be subject to a penalty not exceeding $1,000, plus costs of prosecution, and, in default of payment thereof, shall be sentenced to a term of imprisonment not to exceed 90 days. Each day of continued violation shall constitute a separate offense.