[Amended 2-10-1997 by Ord. No. 96-6884B]
A. 
Construction costs for all new buildings and structures will be determined from values as listed in the most current ICC Building Valuation Data. ICC Building Valuation Data is updated every six months. Permit fee is based on the entire estimated cost of construction. Proof of costs is a signed contract.
[Amended 1-4-2021 by Ord. No. 20/21-1008134B]
B. 
Note: Permit holder retains rights granted under the permit. No permits are transferable.
C. 
For all permits (building, plumbing, wiring and gas) there will be a charge of $50 for every reinspection necessitated by faulty or illegal installation or not in conformance with requirements of Massachusetts codes. Reinspection fee shall be paid before reinspection is made.
[Amended 2-9-2004 by Ord. No. 04-9962C]
D. 
Any work started before applying for and obtaining a permit will be charged two times the permit fee.
E. 
Fees.
[Amended 2-9-2004 by Ord. No. 04-9962C; 1-4-2021 by Ord. No. 20/21-1008134B]
Type of Permit
Fee
Building, Residential
1- or 2-family residential construction
$10 per $1,000, $50 mimimum
Renewable energy (PV, wind, hydro), storage excluded
$0.03 per watt direct current, $50 minimum
Building, Commercial
All commercial construction
$10 per $1,000; $100 minimum
Suppression, fire alarm, HVAC, sheet metal and/or mechanical
$10 per $1,000, $100 minimum. If permit application is associated with active building permit, $50
Renewable energy (PV, wind, hydro), storage excluded
$0.03 per watt direct current, $100 minimum
Building, Miscellaneous
Demolition, residential
$10 per $1,000 of total construction cost, $50 minimum. Accessory structures less than 200 square feet, $25
Demolition, commercial
$10 per $1,000 of total construction cost, $100 minimum
Solid fuel/wood/coal stoves/fireplaces
$50
Tents
$50 residential, $100 per year nonresidential
Pools, above ground and in ground
$50 above ground, $100 in ground
Amusements
$15 per booth and/or ride, $100 minimum
Fences
$25
Sign structure
$10 per $1,000, $50 minimum
Work/jobsite trailer
$100 per trailer
Occupancy
Occupancy and use certificate to occupy existing space
$50 when no building permit is required
Occupancy and use certificate to occupy new space
Included in building permits for new buildings
Temp CO, residential
$50 per 30 days, maximum 90 days
Temp CO, commercial
$200 per 30 days, maximum 90 days
Gas, residential
New construction, 1- or 2-family
$150 per unit
New construction, 3+ units
$100 per unit
Appliance replacement or addition
$40 + $15 per unit after the 1st
Gas, commercial
All commercial gas work
$10 per $1,000, $100 minimum
Plumbing, residential
Residential, 1- or 2-family
$150 per unit
Residential, 3+ units
$100 per unit
Residential alterations (new or replacements)
$40 + $8 per unit after the 1st
Residential trailer water or sewer
$40
Plumbing, commercial
All commercial plumbing
$10 per $1,000, $100 minimum
Wiring, residential
New house construction, 1- or 2-family
$150 per unit
Service charge
$50 per 100 amps, + $25 per additional 100 amps
Renewable energy permit fee
$0.03 per watt direct current, $50 minimum
Minimum permit fee
$10 per $1,000 of contract cost, minimum $75
Oil or gas burner, appliances, swimming pool
$75 each
Wiring, commercial
New construction or addition
The greater of $100 or $10 per $1,000 of wiring job cost
Carnivals
$250
Signs and billboards
$75
Temporary service
$100
Renewable energy (not storage)
$0.03 per watt direct current, $100 minimum
Institutional (maintenance permit)
$250 annually
Inspections
Work beginning before obtaining a permit
Double permit fee
Reinspection fee (all trades), each inspector
$50 minimum
After-hours inspection - detail
$400 minimum
Gas test
$40
Administrative related fees
Commercial plan review fee
$0.02 per square foot over 5,000 square feet, 1st 5,000 square feet included in base fee
Permit extension
$50
Permit revision with no added construction costs
$50
Administrative fee (replacement building card, zoning letter, change of use letter)
$25
110 ANNUAL INSPECTIONS - Fee Schedule
Use Group
Use Group
Use Group Descriptions
Minimum Inspections
Maximum Certification Period
Fees for Maximum Certification Period
A-1
Assembly - Theaters over 400 capacity
With stage and scenery movie theater
Semiannual
1 year
$150
Movie theater
Semiannual
1 year
$150
A-1
Assembly - Theaters 400 or less capacity
With stage and scenery movie theater
Annual
1 year
$75
Movie theater
Annual
1 year
$75
A-2
Restaurants, assembly night clubs or similar uses
Over 400 capacity
Semiannual
1 year
$150
A-3
Assembly lecture halls, recreation centers, terminals, locations of worship
Over 400 capacity
Semiannual
1 year
$125
400 or less capacity
Annual
1 year
$50
A-4
Assembly
Low density, recreation and similar uses
Prior to issuance of each new certificate
5 years
$40
A-5
Assembly
Stadiums, bleachers, places of outdoor assembly
Prior to issuance of each new certificate
1 year
$40+$15 per 1,000 over 5,000
E
Educational
Educational
Prior to issuance of each new certificate
1 year
$50
E
Day care
Child day-care centers
Prior to issuance of each new certificate
1 year
$50
I-1
Group home
Prior to issuance of each new certificate
1 year
$50
I-2
Residents incapable of self-preservation: hospitals, nursing homes, mental hospitals, certain day-care facilities
Prior to issuance of each new certificate
2 years
$75 per 100 beds, +$2 per 10 beds over 100
I-3
Residents restrained: prisons, jails, detention centers, etc.
Prior to issuance of each new certificate
2 years
$75 per 100 beds, +$2 per 10 beds over 100
I-4
Adult and/or child day-care facilities
Prior to issuance of each new certificate
1 year
$50
R-1
Hotels, motels, boardinghouses, etc.
Prior to issuance of each new certificate
1 year
$40 per 10 rooms, +$1 per room over 10 rooms, minimum $100
R-1
Detoxification facilities
Prior to issuance of each new certificate
2 years
$75
R-2
Multifamily
Prior to issuance of each new certificate
5 years
$75 per 3 dwelling units, +$2 per dwelling after 3
R-2
Dormitories and R-2 congregate living
Prior to issuance of each new certificate
1 year
$40 per 10 rooms, +$1 per room over 10 rooms, minimum $100
R-2
Summer camps for children
Annual
1 year
$15 per 100 beds, +$8 per 100 beds after the first 100 beds, +$15 for each assembly building
R-3
Residential care facilities licensed by DDS or DMH
Annual
1 year
$75 per 100 beds, +$2 per 10 beds over 100
R-4
Residential care/assisted living facilities (< 16 persons)
Annual
1 year
$75 per 100 beds, +$2 per 10 beds over 100
R-5
Residential special occupancy
Limited group residence
Annual
1 year
$75 per 100 beds, +$2 per 10 beds over 100
Any
Facilities licensed by the Alcohol Beverage Control Commission where alcoholic beverages are served and consumed
Annual as per MGL c. 10, § 74
1 year as per MGL c. 10, § 74
$75
Any
House museums (as recognized by Massachusetts Historical Commission)
Annual
1 year
$50
Any
Fire escapes, etc., per 780 CMR 10.00: Means of Egress
5 years
5 years
$50
F. 
Site plan review fees shall be as follows (with an effective date of November 1, 2005 and a sunset clause of June 30, 2006).
[Added 10-24-2005 by Ord. No. 05-100881C]
(1) 
Definitions. As used in this section, the following terms shall have the meanings indicated:
MINOR SITE PLAN
Any site plan containing less than 8,000 square feet of building gross floor area (with the exception of one- and two-family residences). Site plans for existing buildings shall be considered minor site plans for purposes of assigning fees.
MAJOR SITE PLAN
Any site plan containing more than 8,000 square feet of building gross floor area (with the exception of one- and two-family residences).
OTHER PLANS
Any site plan involving parking lots or landscaping only where no building is present and no utility changes are proposed.
(2) 
Fees.
(a) 
The fee for minor site plans, as defined above, shall be $1,000, plus $0.03 per square foot of gross floor area.
(b) 
The fee for major site plans, as defined above, shall be $2,000, plus $0.06 per square foot of gross floor area.
(c) 
The fee for modifications to any plan shall be $1,000, plus $0.03 per square foot of gross floor area.
(d) 
The fee for other plans, as defined above, shall be $750.
(e) 
The City Council may authorize the waiver of any fee in this section where a hardship, in its judgment sufficient, is presented.