Type of Building
|
New Construction, Additions, Alterations
| ||
---|---|---|---|
SINGLE OCCUPANCY BUILDING – NEW CONSTRUCTION
| |||
GROUP A -- ASSEMBLY BUILDING
| |||
(Church, school, theater, lecture hall, restaurant, nightclub,
exhibition hall, terminal, recreation center, gymnasium, physical
fitness center, library)
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
GROUP B -- BUSINESS
|
$0.09 per sq.ft., minimum $150, plus $10 for certificate of
occupancy
| ||
GROUP E – EDUCATIONAL
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
GROUP F -- FACTORY AND INDUSTRIAL
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
GROUP H -- HIGH HAZARD USES
|
$0.12 per sq. ft., minimum $225, plus $10 for certificate of
occupancy
| ||
GROUP I -- INSTITUTIONAL
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
GROUP M -- MERCANTILE
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
GROUP R -- RESIDENTIAL BUILDINGS
| |||
1- and 2-family dwelling (and Group R-3, R-4)
|
$0.06 per sq. ft., minimum $75, plus $10 for certificate of
occupancy
| ||
Hotel building (Group R-1)
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
Dormitory building and assisted living facility (Group R-2)
|
$0.09 per sq. ft., minimum $150, plus $10 for certificate of
occupancy
| ||
Multi-family (apartment and condominiums) (Group R-2)
|
$0.08 per sq. ft., plus $10 for shell certificate of occupancy,
$10 certificate of occupancy for each dwelling unit if required
| ||
Mobile home
| |||
Without basement
|
$50 single wide on private lot, plus $10 for certificate of
occupancy
| ||
$70 double wide on private lot, plus $10 for certificate of
occupancy
| |||
$45 single wide in park, plus $10 for certificate of occupancy
| |||
$65 double wide in park, plus $10 for certificate of occupancy
| |||
With basement
|
$80 single wide, plus $10 for certificate of occupancy
| ||
$135 double wide, plus $10 for certificate of occupancy
| |||
Additions, alterations, renovations to 1- and 2-family dwellings
constructed to the provisions of the International Residential Code
|
$0.05 per sq. ft., minimum $65, plus $10 for certificate of
occupancy
| ||
1- and 2-family dwelling accessory structure
| |||
200 sq. ft. and greater
|
$0.05 per sq. ft., minimum $25, plus $10 for certificate of
occupancy
| ||
Under 200 sq. ft.
|
$20 (no certificate of occupancy or inspections required)
| ||
1- and 2-family dwelling accessory structure (deck, porch or
balcony, attached or detached) constructed to the provisions of the
International Residential Code
|
$0.05 per sq. ft., minimum $30, plus $10 certificate of occupancy
| ||
Retaining wall accessory to 1- and 2-family dwelling
|
$1 l/f, minimum $90 - maximum $180, plus $10 certificate of
occupancy
| ||
Exterior facade to include replacement of exterior finishes
building permit required 1- and 2-family dwelling constructed to the
provisions of the International Residential Code
|
$75, plus $10 for certificate of occupancy
| ||
GROUP S -- STORAGE BUILDINGS
| |||
Shell building with no declared occupancy (separate permit required
for occupancy)
|
$0.05 per sq. ft., minimum $150
| ||
Shell tenant space to create a tenant or multiple tenant space
(addresses must be created for each space; separate permit required
for occupancy of each space)
|
$0.05 per sq. ft., minimum $150
| ||
Tenant permit for first occupancy
|
Base occupancy fee - $0.05 per sq. ft., minimum $75, plus $10
for certificate of occupancy
| ||
Tenant occupancy with modification (space must be legally existing)
|
Fee per sq. ft. price same as occupancy group classification
for new, minimum $75, plus $10 for certificate of occupancy
| ||
GROUP U -- MISCELLANEOUS
| |||
Boat pier
|
$35
| ||
Bulkhead
|
$35, per 100 ft.
| ||
Fence
|
$20 plus $0.04 per foot over 250 ft.
| ||
Marina
|
$20 per slip, $0.09 per sq. ft., minimum $150
| ||
Retaining wall
|
$30
| ||
Retaining wall (building permit required)
|
$1 l/f, minimum $240 - maximum $480, plus $10 for certificate
of occupancy
| ||
Tank, above-ground or underground
|
$40
| ||
Tank, above ground or underground (permit required)
|
$240, plus $10 for certificate of occupancy
| ||
Replacement of certificate of occupancy
|
$10
| ||
Re-roofing of a structure when a building permit is required
1- and 2-family dwelling
|
$75, plus $10 for certificate of occupancy
| ||
Re-roofing of a structure when a building permit is required
|
$0.01 per sq. ft., minimum $240 - maximum $480, plus $10 for
certificate of occupancy
| ||
Exterior facade to include replacement of exterior finishes
building permit is required
|
$0.01 l/f, minimum $240 - maximum $480, plus $10 for certificate
of occupancy
| ||
Playground equipment (not associated with a 1- or 2-family dwelling,
permit required)
|
$75, plus $10 for certificate of occupancy
| ||
Demolition without a separate permit, except that no fee shall
be required; demolition is performed as a training exercise by a fire
company located in Harford County
|
$75
| ||
Relocation
| |||
Without alterations
|
$50
| ||
With alterations
|
$0.04 per sq. ft., minimum $50
| ||
Mobile home park
| |||
To establish a park
|
$500
| ||
Each space
|
$50
| ||
Each permanent service building
|
Fee same as required for use group in new construction
| ||
Signs
| |||
Billboard
|
$65 over 300 sq. ft.
| ||
Marquee sign
|
$25
| ||
Roof sign
|
$45
| ||
Freestanding sign
|
$40
| ||
Face sign
|
$30 on structure
| ||
Temporary portable sign
|
$40
| ||
Swimming pool
| |||
Residential
|
$40 above-ground
$75 in-ground
| ||
Swimming pool (club, public or private)
|
$125
| ||
Utilities, public or private, each structure (tower, transformer,
pole, etc.)
|
$20
| ||
Utility or communication tower
|
$150, plus $10 for certificate of occupancy
| ||
Utility or communication tower, replacement or addition of equipment
(tower must be legally existing)
|
$75, plus $10 for certificate of occupancy
| ||
Occupiable structure
|
$0.05 per sq. ft., minimum $65, plus $10 for certificate of
occupancy
| ||
Reissue expired permit, with Department approval
|
$60 or cost of original permit, whichever is less
| ||
Preliminary plan review except 1- and 2-family construction
|
$60 per hour
| ||
Reinspection or unnecessary trip
|
$50
| ||
Reinspection fee, upon receipt of temporary certificate of occupancy
|
$50
| ||
Investigation fee (in addition to regular permit and license
fees)
|
$100
| ||
Written notice of violation, working without a valid license
or permit, issuance of a stop work order, in addition to regular fee
|
$250 first occurrence
$300 second occurrence
$350 subsequent occurrence (with administrative hearing)
| ||
Penalty charged for proceeding without the prior inspection
|
$50
| ||
Hourly rate
|
$60 per hour
| ||
Replacement of U&O
|
$10
|
Acres of Harvest Area
|
Fees for Permit
|
---|---|
0 to 5
|
$25
|
6 and above
|
$50
|
Type of Subdivision
|
Subdivision Fee
|
Revision Fee
| |
---|---|---|---|
Residential lots (including mobile homes)
|
$100.00 filing fee, plus $50.00 per lot
|
$30.00 filing fee, plus $10.00 per lot
| |
Multifamily and mobile home park
|
$100.00 filing fee, plus $30.00 per unit
|
$30.00 filing fee, plus $10.00 per unit
| |
Commercial (subdivision or individual site plan)
|
$200.00 filing fee, plus $50.00 per acre
|
$75.00 filing fee, plus $10.00 per acre
| |
Industrial (subdivision or individual site plan)
|
$200.00 filing fee, plus $50.00 per acre
|
$75.00 filing fee, plus $10.00 per acre
| |
Extensions of preliminary plans for developments
of:
| |||
More than 5 lots
|
$100.00
| ||
1 to 5 lots
|
$25.00
| ||
Final plats
|
$150.00 per plat, plus $10.00 per lot
|