[1]
Editor's Note: Forms of these documents are included at the end of this chapter.
The certificates quoted below shall be inscribed on the plan as quoted and shall be properly signed and attested when the plan is submitted to the Planning Commission and the Board of Supervisors. All certificates shall be placed on final plan in an arrangement suitable for placement of all required seals.
D. 
Corporation Acknowledgement.
J. 
Township Engineer's Approval.
K. 
Owners Acceptance of Responsibility for Provided Stormwater Drainage Facilities and Control of Stormwater Water Drainage.