The Borough Planning Commission shall review applications for zoning permits referred to it under §
340-87. In reviewing such applications, the Planning Commission shall follow the same procedure employed in reviewing subdivision and land development plans. The Planning Commission shall submit its recommendations and findings to the Borough Council within 30 days of receipt of the application from the Zoning Officer. Should the Planning Commission fail to submit a report and recommendation to the Borough Council within 30 days from receipt of the application from the Zoning Officer, the application shall be deemed acceptable to the Planning Commission.
Hereafter, no use listed in the use sections
of this chapter may be established or changed, and no structure shall
be erected, constructed, reconstructed, altered, razed, or removed,
and no building shall be used or occupied, or changed in use, until
a zoning permit has been secured from the Zoning Officer. Upon completion
of the change in use or construction, reconstruction, alteration or
moving of structures, the applicant shall notify the Zoning Officer
of such completion. No permit shall be considered as complete or as
permanently effective until the Zoning Officer has noted on the permit
that the work or occupancy and use have been inspected and approved
as being in conformity with the provisions of this chapter.
All applicants for zoning permits shall, at
the time of making application, pay to the Zoning Officer for the
use of the Borough a fee in accordance with the fee schedule adopted
by resolution of the Borough Council upon the enactment of this chapter
or as such schedule may be amended by resolution of the Borough Council.
Any erection, construction, reconstruction,
alteration or moving of a building or other structure, including a
sign, authorized by a zoning permit shall be commenced, and any change
in use of a building or land authorized by a zoning permit shall be
undertaken, within one year after the date of issuance of the permit.
If not, the permit shall be considered null and void. However, in
case of erection or construction of a building, the right to proceed
with construction may be extended annually without additional fees
for an aggregate period of not more than three years, provided that
the construction pursuant to said permit has commenced within the
first one-year period.
The Borough Council may allow or deny a conditional
use application after receiving recommendations from the Planning
Commission pursuant to the various standards set forth in this section
and those contained in other appropriate sections of this chapter.
A. The Council shall:
(1) Determine that the proposal provides for adequate
access to public streets of a suitable capacity without creating hazardous
conditions. In making this determination, the Council may impose conditions
requiring:
(a)
Access to be limited or combined with that of
adjoining properties.
(b)
Improvements of vertical or horizontal alignment
adjoining the site or off-site if the use would create a hazardous
condition or if the alignment problem restricts access to the site.
(c)
Widening or replacing a bridge if said bridge
restricts access to the site or where the volume or nature of the
traffic generated by the proposed use would create a hazardous or
restrictive situation.
(2) Examine the use and its relationship to existing land
uses to ensure that the proposed use does not adversely alter the
character of stable neighborhoods and to protect adjoining residents
from uses which are objectionable. To this end, the Council may impose
conditions requiring:
(a)
Special buffer planting, buffer yards or planted
berms.
(b)
Planting or walls to screen intruding uses such
as parking lots, loading docks, mechanical plants, etc.
(c)
Control of the location of intruding uses so
that they are sited in the least disrupting manner.
(d)
Special design of lighting and signs to avoid
disrupting existing neighborhoods or conflicting with the vision of
motorists, particularly near intersections.
B. In residential districts, conditional uses shall be
limited to the same impervious surface ratio as the residential use.
Where several impervious surface ratios are listed, the highest shall
be used.
C. The natural resources listed in Article
VI shall be mapped and presented to provide evidence that the performance standards in Article
VI are met. Drawings shall indicate the percentage of intrusion and illustrate the extent of the intrusion so that each standard in Article
VI may be evaluated.