[Added 6-22-1989 by L.L. No. 4-1989]
The Town of Goshen will not approve or accept for dedication any proposed public water system(s) from an applicant unless, as a condition precedent, the applicant has demonstrated by an engineering analysis, including cost-effect data, that the system(s) proposed will provide the most effective and efficient long-term service to the Town. Such analysis shall include, but not be limited to, data and/or information with respect to the proposed system(s) location so as to ensure unification of the system(s) and protection of existing users within the Town. Such analysis shall be included as part of the applicant's environmental quality review/draft environmental impact statement procedure.