home
Home
code
Code
Code
Index
law
Laws (1)
New Laws (1)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Bethel, ME
chevron_right
2024-06-12
info
chevron_right
Index: S
Filter By Letter
#
A
B
C
D
E
F
G
H
I
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
S
add
Safety standards
§ 5-26 — Police Department.
§ 5-27 — Fire Department.
§ 5-28 — Ambulance Department.
§ 5-41 — Select Board authorization.
§ 29-5 — Special amusement permit.
§ 29-6 — Conduct detrimental to public health, safety, and welfare constituting offenses by licensees.
§ 29-8 — Appeals.
§ 29-11 — Suspension or revocation of permit.
§ 33-4 — Regulations.
§ 43-4 — Location of victualers' business.
§ 60-11 — Inspections.
§ 67-6 — Findings and intent.
§ 67-12 — Safety.
§ 75-4 — Intent.
§ 75-10 — Emergency vehicles.
§ 75-26 — Public utility vehicles.
§ 75-42 — Permits.
§ 96-1 — Purpose.
96-3{2} — ALTERATION
96-3{4} — DANGEROUS BUILDING
§ 96-4 — Building permits.
§ 96-5 — Adoption of codes by reference.
§ 105-9 — Appeals and variances.
105-12B{23} — FREEBOARD
105-12B{42} — SUBSTANTIAL IMPROVEMENT
§ 125-8 — Design and construction standards.
§ 125-11 — Purpose.
§ 125-19 — Enforcement; violations and penalties; waivers, variances and appeals.
§ 132-11 — Nonconforming uses, lots, and structures.
§ 132-14 — Land use standards.
§ 132-15 — Administration.
132-17{17} — EMERGENCY OPERATIONS
§ 136-4 — Excepted signs.
§ 136-10 — Bethel Sign and Information System: roadside directional signs, intra-community directional signs, public information kiosks and gateways.
§ 136-11 — Enforcement; violations and penalties.
§ 136-12 — Waivers and appeals.
136-13{29} — SAFETY CONTROL SIGN
§ 140-6 — Waivers; modifications of approved plans; expiration of approval; multiple-use buildings.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
140-12B{64} — WAIVER
§ 144-2 — Findings and purpose.
§ 144-7 — Two-year updates/revaluation.
§ 144-8 — Site plan application and review.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 144-14 — Waivers and appeals.
§ 150-1 — Purpose.
§ 150-5 — Preliminary plan.
§ 150-9 — Requirements for subdivisions.
§ 150-10 — Waivers.
§ 160-2 — Purpose.
§ 160-10 — CWEF application procedure.
§ 160-12 — CWEF supplements to site plan review performance standards.
§ 160-13 — Two-year updates/revaluation.
add
Salaries and compensation
§ 1-6 — Ordinances saved from repeal.
§ 5-38 — Personnel costs.
add
Sales
§ 1-6 — Ordinances saved from repeal.
§ 5-47 — Sale or disposition of tax- or sewer-acquired properties.
§ 5-48 — Sale or disposition of Town-owned real property.
§ 5-49 — Sale or disposition of Town-owned equipment or other personal property.
§ 29-5 — Special amusement permit.
§ 29-6 — Conduct detrimental to public health, safety, and welfare constituting offenses by licensees.
§ 33-3 — Purpose.
§ 33-5 — Liability.
60-1A{7} — DWELLING UNIT
60-1A{8} — GARBAGE
96-3{5} — DWELLING UNIT
§ 105-8 — Review of subdivision and development proposals.
105-12B{29} — MANUFACTURED HOME PARK OR SUBDIVISION
§ 132-14 — Land use standards.
132-17{3} — AGRICULTURE
132-17{40} — MARINA
132-17{41} — MARKET VALUE
§ 136-9 — Temporary signs.
136-13{24} — ON-PREMISES SIGN
136-13{26} — REAL ESTATE SIGN
136-13{32} — SHOPPING
§ 140-7 — Special regulations.
140-12B{6} — AUTO SALES
140-12B{10} — CAMPGROUND
140-12B{20} — DWELLING UNIT
140-12B{24} — FOOD TRUCK
140-12B{50} — RESTAURANT
140-12B{51} — RETAIL
140-12B{68} — YARD OR GARAGE SALE
§ 150-9 — Requirements for subdivisions.
add
Sanitary facilities
§ 105-6 — Development standards.
105-12B{20} — FLOODPROOFING
add
Sanitation
96-3{3} — CODE
add
Schools
§ 5-7 — Appointment of members of boards and committees.
§ 5-31 — General Assistance Department.
§ 5-57 — Bethel Area Recreation Board.
§ 46-4 — Permit required.
§ 60-54 — Municipal property exempt.
§ 75-19 — Speed limits at specific locations.
§ 75-31 — Schedule of streets where parking is prohibited at all times.
§ 75-41 — Exceptions.
132-17{38} — INSTITUTIONAL
136-13{6} — ENVIRONS
§ 140-5.1 — Final drawing.
§ 150-6 — Final plan.
add
Screens and screening
§ 67-11 — Responsibilities of party performing work.
§ 105-6 — Development standards.
§ 125-8 — Design and construction standards.
§ 125-16 — Minimum design and construction standards.
§ 132-14 — Land use standards.
§ 140-5 — Plans.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
140-12B{52} — SCREENING
140-12B{67} — YARD
§ 144-8 — Site plan application and review.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 144-10 — General restrictions.
add
Security standards
§ 5-50 — Audits available for public inspection.
§ 12-6 — Response by Police, Fire and Ambulance Departments.
§ 17-6 — Disturbing the peace; damaging property; disposal of excrement.
§ 29-7 — Inspections.
§ 46-3 — Building permit requirements.
52-3{6} — PACE LOAN
52-3{7} — PACE MORTGAGE
§ 60-43 — Service charges for sewage disposal.
§ 75-42 — Permits.
§ 105-6 — Development standards.
§ 132-14 — Land use standards.
§ 136-9 — Temporary signs.
§ 140-5.1 — Final drawing.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
§ 144-6 — Financial responsibilities of applicant/owner/operator.
§ 150-6 — Final plan.
§ 150-9 — Requirements for subdivisions.
§ 160-7 — Financial responsibilities of applicant/owner/operator.
§ 160-12 — CWEF supplements to site plan review performance standards.
add
Seizure
§ 17-3 — Impoundment.
add
Septic systems
§ 132-11 — Nonconforming uses, lots, and structures.
add
Septic tanks
60-1A{20} — SEPTAGE
§ 60-26 — Building sewers.
§ 60-34 — Industrial sludges.
132-17{81} — SUBSURFACE SEWAGE DISPOSAL SYSTEM
140-12B{55} — SOLID WASTE
add
Service dogs
§ 17-6 — Disturbing the peace; damaging property; disposal of excrement.
§ 76-8 — Dogs and other pets.
add
Service stations
§ 140-7 — Special regulations.
140-12B{14} — COMMERCIAL
140-12B{30} — GASOLINE SERVICE STATION
add
Setbacks
§ 96-6 — Other requirements.
§ 125-19 — Enforcement; violations and penalties; waivers, variances and appeals.
§ 132-11 — Nonconforming uses, lots, and structures.
§ 132-14 — Land use standards.
§ 132-15 — Administration.
132-17{14} — DIMENSIONAL REQUIREMENTS
132-17{35} — INCREASE IN NONCONFORMITY OF A STRUCTURE
132-17{49} — NONCONFORMING STRUCTURE
132-17{72} — SETBACK
§ 140-5 — Plans.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
§ 140-10 — Appeals.
140-12B{53} — SETBACK
140-12B{62} — VARIANCE
§ 144-9 — Additional standards for industrial solar energy systems.
§ 144-10 — General restrictions.
§ 150-9 — Requirements for subdivisions.
§ 160-12 — CWEF supplements to site plan review performance standards.
160-16{30} — SETBACK
add
Sewage disposal, private
§ 105-5 — Review of permit applications.
105-12B{31} — MINOR DEVELOPMENT
add
Sheds
96-3{1} — ACCESSORY BUILDING
105-12B{39} — START OF CONSTRUCTION
add
Shrubs
§ 132-11 — Nonconforming uses, lots, and structures.
§ 132-14 — Land use standards.
132-17{88} — VEGETATION
132-17{94} — WOODY VEGETATION
140-12B{45} — OPEN SPACE
add
Signs
§ 5-29 — Public Works Department.
§ 33-5 — Liability.
§ 46-3 — Building permit requirements.
§ 60-35 — Grease interceptors.
§ 60-47 — Public sewer extension by Town.
§ 75-4 — Intent.
75-5{16} — STOP, STOPPING or STANDING
75-5{18} — THROUGH STREET
§ 75-10 — Emergency vehicles.
§ 75-13 — Authority to install traffic control devices.
§ 75-14 — Uniform traffic control devices.
§ 75-15 — Obedience to traffic control devices; missing and illegible signs.
§ 75-16 — Schedule of stop signs.
§ 75-19 — Speed limits at specific locations.
§ 75-26 — Public utility vehicles.
§ 75-27 — Interference with snow removal and ice control.
§ 75-28 — Authority to place signs at places of assemblage.
§ 75-30 — Parking prohibited in specified places.
§ 75-31 — Schedule of streets where parking is prohibited at all times.
§ 75-32 — Schedule of streets where parking is prohibited/tow-away zones.
§ 96-4 — Building permits.
§ 105-5 — Review of permit applications.
§ 105-8 — Review of subdivision and development proposals.
105-12B{8} — CERTIFICATE OF COMPLIANCE
§ 132-4 — When effective.
§ 132-7 — Amendments.
§ 132-14 — Land use standards.
§ 132-15 — Administration.
Ch 136 — Signs
§ 136-1 — Findings and purpose.
§ 136-3 — Applicability.
§ 136-4 — Excepted signs.
§ 136-5 — General restrictions.
§ 136-6 — Permit required.
§ 136-7 — General standards for interior signs.
§ 136-8 — General standards for exterior signs.
§ 136-9 — Temporary signs.
§ 136-10 — Bethel Sign and Information System: roadside directional signs, intra-community directional signs, public information kiosks and gateways.
§ 136-11 — Enforcement; violations and penalties.
136-13{1} — AWNING SIGN
136-13{2} — BANNER
136-13{3} — BILLBOARD
136-13{8} — EVENT FULFILLMENT SIGN
136-13{10} — FREESTANDING SIGN
136-13{13} — GRANDFATHERED SIGNS
136-13{14} — GROUND SIGN
136-13{20} — MARQUEE SIGN
136-13{22} — NAME SIGN
136-13{23} — OFFICIAL BUSINESS DIRECTIONAL SIGN
136-13{24} — ON-PREMISES SIGN
136-13{26} — REAL ESTATE SIGN
136-13{27} — ROADSIDE DIRECTIONAL SIGN
136-13{28} — ROOF SIGN
136-13{29} — SAFETY CONTROL SIGN
136-13{30} — SEASONAL AGRICULTURAL SIGNS
136-13{33} — SIGN
136-13{34} — SIGN AREA
136-13{36} — SUFFICIENT FRONTAGE
136-13{37} — TEMPORARY SIGN
136-13{38} — TRAFFIC CONTROL SIGN
136-13{39} — TRAFFIC FLOW INFORMATIONAL SIGN
136-13{41} — WALL SIGN
§ 140-5 — Plans.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 150-9 — Requirements for subdivisions.
§ 160-12 — CWEF supplements to site plan review performance standards.
§ 160-15 — Complaints; enforcement; violations and penalties.
160-16{21} — PARTICIPATING PARCEL
§ DL-1 — Disposition of legislation.
add
Single-family dwellings
132-17{16} — DRIVEWAY
add
Site plan approval
§ 160-5 — Expert consultants; extension of time limits; documentation; change of ownership.
§ 160-14 — Expiration of site plan approval.
add
Site plan review
§ 5-65 — Select Board approval required.
§ 46-3 — Building permit requirements.
§ 96-6 — Other requirements.
§ 96-9 — Appeals.
§ 125-12 — Applicability.
§ 125-19 — Enforcement; violations and penalties; waivers, variances and appeals.
§ 136-12 — Waivers and appeals.
Ch 140 — Site Plan Review
§ 140-2 — Statutory authority; title; administration.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
§ 144-2 — Findings and purpose.
§ 144-8 — Site plan application and review.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 144-10 — General restrictions.
§ 144-12 — Application procedure.
§ 144-13 — Enforcement; violations and penalties.
§ 144-14 — Waivers and appeals.
§ 146-10 — Appeals.
§ 150-13 — Appeals.
§ 160-2 — Purpose.
§ 160-3 — Authority; right of entry for inspection.
§ 160-5 — Expert consultants; extension of time limits; documentation; change of ownership.
§ 160-6 — Applicability; violation; burden of proof.
§ 160-8 — Meteorological study requirement; application procedure.
§ 160-9 — Meteorological study application review and performance standards.
§ 160-10 — CWEF application procedure.
§ 160-11 — CWEF application review.
§ 160-12 — CWEF supplements to site plan review performance standards.
§ 160-15 — Complaints; enforcement; violations and penalties.
§ DL-1 — Disposition of legislation.
add
Site plans
§ 1-6 — Ordinances saved from repeal.
§ 5-65 — Select Board approval required.
§ 46-3 — Building permit requirements.
§ 96-6 — Other requirements.
§ 96-9 — Appeals.
§ 105-3 — Application for permit.
§ 125-12 — Applicability.
§ 125-19 — Enforcement; violations and penalties; waivers, variances and appeals.
§ 132-14 — Land use standards.
§ 132-15 — Administration.
§ 136-12 — Waivers and appeals.
Ch 140 — Site Plan Review
§ 140-2 — Statutory authority; title; administration.
§ 140-5 — Plans.
§ 140-5.1 — Final drawing.
§ 140-6 — Waivers; modifications of approved plans; expiration of approval; multiple-use buildings.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
§ 144-2 — Findings and purpose.
§ 144-8 — Site plan application and review.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 144-10 — General restrictions.
§ 144-12 — Application procedure.
§ 144-13 — Enforcement; violations and penalties.
§ 144-14 — Waivers and appeals.
§ 146-10 — Appeals.
§ 150-13 — Appeals.
§ 160-2 — Purpose.
§ 160-3 — Authority; right of entry for inspection.
§ 160-5 — Expert consultants; extension of time limits; documentation; change of ownership.
§ 160-6 — Applicability; violation; burden of proof.
§ 160-8 — Meteorological study requirement; application procedure.
§ 160-9 — Meteorological study application review and performance standards.
§ 160-10 — CWEF application procedure.
§ 160-11 — CWEF application review.
§ 160-12 — CWEF supplements to site plan review performance standards.
§ 160-14 — Expiration of site plan approval.
§ 160-15 — Complaints; enforcement; violations and penalties.
160-16{12} — ISSUANCE OF NOTICE DATE
160-16{24} — PROJECT BOUNDARY
§ DL-1 — Disposition of legislation.
add
Skateboards
§ 75-38 — Use of streets by nonmotorized vehicles.
§ 76-6 — Access restricted; exemptions.
add
Sketch plans
§ 140-4 — Determination of applicability.
§ 150-4 — Determination of applicability.
§ 150-9 — Requirements for subdivisions.
add
Snow and ice removal
§ 75-27 — Interference with snow removal and ice control.
add
Soil erosion and sediment control
§ 132-11 — Nonconforming uses, lots, and structures.
§ 132-14 — Land use standards.
§ 132-15 — Administration.
§ 140-5 — Plans.
§ 140-8.1 — Requirements for site plan.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 150-5 — Preliminary plan.
§ 150-9 — Requirements for subdivisions.
add
Solar collectors
§ 144-8 — Site plan application and review.
add
Solar energy systems
Ch 144 — Solar Energy Systems
§ 144-1 — Title.
§ 144-2 — Findings and purpose.
§ 144-4 — Applicability.
§ 144-6 — Financial responsibilities of applicant/owner/operator.
§ 144-7 — Two-year updates/revaluation.
§ 144-8 — Site plan application and review.
§ 144-9 — Additional standards for industrial solar energy systems.
§ 144-10 — General restrictions.
§ 144-11 — Restrictions on industrial solar energy systems.
§ 144-12 — Application procedure.
144-15{1} — DECOMMISSIONING
144-15{2} — SOLAR ENERGY SYSTEM
144-15{3} — SOLAR ENERGY SYSTEM, GROUND-MOUNTED
144-15{4} — SOLAR ENERGY SYSTEM, ROOF-MOUNTED
§ DL-1 — Disposition of legislation.
add
Special exceptions
§ 132-15 — Administration.
add
Special permits
§ 29-2 — Purpose.
add
Speed limits
§ 75-10 — Emergency vehicles.
§ 75-19 — Speed limits at specific locations.
§ 125-8 — Design and construction standards.
§ 125-16 — Minimum design and construction standards.
§ 136-6 — Permit required.
§ 136-8 — General standards for exterior signs.
§ 136-9 — Temporary signs.
add
Steep slopes
§ 132-14 — Land use standards.
§ 144-8 — Site plan application and review.
§ 150-9 — Requirements for subdivisions.
add
Stop work orders
§ 105-4 — Fees.
add
Storage
52-3{1} — ENERGY SAVING IMPROVEMENT
60-1A{8} — GARBAGE
67-7{7} — UNDERGROUND FACILITY
96-3{6} — STRUCTURE
§ 105-5 — Review of permit applications.
§ 105-6 — Development standards.
105-12B{10} — DEVELOPMENT
105-12B{24} — FUNCTIONALLY DEPENDENT USE
105-12B{27} — LOWEST FLOOR
105-12B{31} — MINOR DEVELOPMENT
105-12B{40} — STRUCTURE
§ 125-17 — Drainage.
§ 132-14 — Land use standards.
132-17{18} — ESSENTIAL SERVICES
132-17{28} — FUNCTIONALLY WATER-DEPENDENT USES
132-17{40} — MARINA
§ 140-5 — Plans.
§ 140-7 — Special regulations.
§ 140-8.1 — Requirements for site plan.
140-12B{14} — COMMERCIAL
140-12B{37} — INDUSTRIAL
140-12B{57} — STRUCTURE
§ 150-9 — Requirements for subdivisions.
add
Stormwater
60-1A{18} — SANITARY SEWER
60-1A{22} — SEWAGE
60-1A{27} — STORM DRAIN
§ 60-30 — Unpolluted water.
§ 125-8 — Design and construction standards.
§ 125-17 — Drainage.
§ 132-14 — Land use standards.
§ 140-5 — Plans.
§ 140-5.1 — Final drawing.
§ 140-8.1 — Requirements for site plan.
§ 150-6 — Final plan.
§ 150-9 — Requirements for subdivisions.
150-15{2} — DIRECT WATERSHED OF A GREAT POND
add
Stormwater management
§ 125-17 — Drainage.
§ 132-14 — Land use standards.
§ 140-5 — Plans.
§ 140-5.1 — Final drawing.
§ 140-8.1 — Requirements for site plan.
§ 150-6 — Final plan.
§ 150-9 — Requirements for subdivisions.
add
Streetlighting
§ 125-7 — Applications.
add
Street openings
§ 67-8 — Street opening permit.
§ 67-9 — Town services used.
§ 67-10 — Private contractor used.
§ 67-11 — Responsibilities of party performing work.
§ 140-5 — Plans.
§ 150-5 — Preliminary plan.