Upon completion of all required subdivision improvements, the developer may request the Township to accept the improvements for maintenance and release all performance guarantees.
A. 
Request for acceptance of improvements and release of performance guarantees shall be made in writing to the Township Committee.
B. 
Upon notice of request for acceptance, the Board Engineer shall make or cause to be made a final inspection of the improvements. Those improvements not in acceptable condition shall be reported to the developer in writing for correction, repair or replacement. Upon receipt from the developer’s engineer of a report that the necessary correction, repair or replacements have been accomplished, the Board Engineer shall reinspect the improvements.
C. 
Prior to the Board Engineer making a final report and recommendations to the Township Committee, the developer will supply as-built plans, signed and sealed by a licensed New Jersey professional engineer, showing surface grading, including major lot gradings, building finished floor grades and curb and gutter grades, together with horizontal and vertical location of underground facilities. Manholes, inlets and other such appurtenances, together with sidewalks and curbs, shall be shown in true location and grade. The as-built plans shall be submitted on reproducible media.
D. 
The developer shall furnish a maintenance bond in a form acceptable to the Township in the amount of 15% of the total improvement cost estimate for a period of two years.
A. 
After all of the requirements of § § 100-18, 100-19 and 100-20 are complied with, the Township Committee may accept the improvements for maintenance and release the performance bonds.
B. 
The creation of each new lot within the Township of Delanco shall be assessed a one-hundred-dollar fee to offset the cost of amending the Township Tax Map. The creation of any new streets within the Township shall be assessed a fee of $0.20 per linear foot.