Item
|
Fee
| |||
---|---|---|---|---|
Minimum fee
|
$65
| |||
Surcharge to provide for required training, certification and
technical support programs
|
As set forth in N.J.A.C. 5:23-4.19(b)
| |||
New construction
| ||||
Buildings and structures of all use groups and types as classified
in Articles 3 and 4 of the Building Subcode
|
$0.038/cubic foot
| |||
Use Groups A-1, A-2, A-3, A-4, F-1, F-2, S-1, and S-2
|
$0.020/cubic foot
| |||
Structures on farms, including commercial farm buildings under
N.J.A.C. 5:23-3.2(d), used exclusively for storage of food or grain,
or sheltering of livestock
|
$0.020/cubic foot
| |||
Additions
|
Computed for the added portion on same basis as for new construction
| |||
Alterations (based on estimated cost of work)
| ||||
Up to $50,000
|
$34/$1,000 estimated cost
| |||
$50,000 to $100,000
|
$26/$1,000 estimated cost
| |||
Above $100,000
|
$22/$1,000 estimated cost
| |||
Combined renovations and additions
|
Sum of fees computed separately for additions and alterations
| |||
Tank abandonment in place or tank removal
|
$75
| |||
In-ground pool and required fence
|
$300
| |||
Aboveground pool
|
$125
|
Item
|
Fee
| ||
---|---|---|---|
Installation or replacement of plumbing fixtures
|
$15/fixture
| ||
Installation or replacement of plumbing appurtenance or special
device
|
$91/appurtenance or device
| ||
Cross-connections and backflow preventers subject to testing**
|
$75/device
| ||
Annual test of cross-connections and backflow preventers
|
$75
| ||
Installation or replacement of plumbing appliance
|
$35
| ||
Installation or replacement of dishwashers, ice makers and instant
hot water coils when installed in Use Groups R-3 and R-4, new construction,
or a complete renovation
|
$15
| ||
Installation of house or building sewer and/or water service
pipe
|
$75
| ||
Installation of lawn sprinkler system
|
$5/sprinkler head
| ||
Installation or replacement of subsoil drains
|
$75/drain
| ||
Removal or abandonment in place of sewage disposal system or
septic tank
|
$75
| ||
Installation or replacement of roof drains and/or area drains
|
$75
| ||
Gas line piping
|
$15/gas appliance connection
| ||
Installation or replacement of oil lines and/or oil tank piping
|
$75
| ||
Radon mitigation, lead abatement, or asbestos abatement
|
$24/$1,000 estimated cost
| ||
**NOTE: Testing is required every three months.
|
Item
|
Fee
| ||
---|---|---|---|
Receptacles or fixtures
| |||
1 to 50
|
$65
| ||
Each additional 25
|
$15
| ||
Motor or electric device
| |||
1 hp to 10 hp
|
$20
| ||
Greater than 10 hp to 50 hp
|
$65
| ||
50 hp to 100 hp
|
$129
| ||
Greater than 100 hp
|
$640
| ||
Transformers and generators
| |||
1 kw to 10 kw
|
$20
| ||
Greater than 10 kw to 45 kw
|
$65
| ||
45 kw to 112.5 kw
|
$120
| ||
Greater than 112.5 kw
|
$560
| ||
Service panel, service entrance or subpanel
| |||
Less than or equal to 200 amperes
|
$92
| ||
Greater than 200 amperes to 1,000 amperes
|
$129
| ||
Greater than 1,000 amperes
|
$560
| ||
Annual pool inspection
|
$77
|
Item
|
Fee
| ||
---|---|---|---|
Sprinklers and detectors (smoke and heat)
| |||
20 or fewer heads or detectors
|
$95
| ||
21 to 100 heads or detectors
|
$168
| ||
101 to 200 heads or detectors
|
$321
| ||
201 to 400 heads or detectors
|
$670
| ||
401 to 1,000 heads or detectors
|
$950
| ||
Standpipe
|
$300 each
| ||
Pre-engineered system
|
$300 each
| ||
Gas- or oil-fired appliance not connected to plumbing system
|
$65 each
| ||
Kitchen exhaust system
|
$75 each
| ||
Incinerator
|
$600 each
| ||
Crematorium
|
$600 each
| ||
Tank abandonment in place or tank removal
|
$92
|
Item
|
Fee
| ||||
---|---|---|---|---|---|
Installation of a new elevator
|
$300
| ||||
Witnessing acceptance tests and performing inspections
| |||||
Traction and winding drum elevators
| |||||
1 to 10 floors
|
$243
| ||||
Over 10 floors
|
$405
| ||||
Hydraulic elevators
|
$216
| ||||
Roped hydraulic elevators
|
$243
| ||||
Escalators, moving walks
|
$216
| ||||
Dumbwaiters
|
$54
| ||||
Stairway chair lifts, inclined and vertical wheelchair and man
lifts
|
$54
| ||||
Additional charges for the following features
| |||||
Oil buffers
|
$43 each
| ||||
Counterweight governor and safeties
|
$108
| ||||
Auxiliary power generator
|
$81
| ||||
Elevators in Use Group R-3 or R-4 or exempt R-2
|
$162
| ||||
Witnessing acceptance test and performing inspections of alterations
|
$54
| ||||
Tests and inspections for devices not in Use Group R-3 or R-4
or otherwise exempt R-2 structures:
| |||||
Six-month inspections
| |||||
Traction and winding drum elevators
| |||||
1 to 10 floors
|
$243
| ||||
Over 10 floors
|
$405
| ||||
Hydraulic elevators
|
$216
| ||||
Roped hydraulic elevators
|
$243
| ||||
Escalators or moving walks
|
$216
| ||||
Dumbwaiters
|
$54
| ||||
Stairway chair lifts, inclined and vertical wheelchair and man
lifts
|
$54
| ||||
Additional charges for the following features:
| |||||
Oil buffers
|
$43 each
| ||||
Counterweight governor and safeties
|
$108
| ||||
Auxiliary power generator
|
$81
| ||||
Elevators in Use Group R-3 or R-4 or exempt R-2
|
$162
| ||||
Witnessing acceptance test and performing inspections of alterations
|
$54
| ||||
Tests and inspections for devices not in Use Group R-3 or R-4
or otherwise exempt R-2 structures
| |||||
Six-month inspections
| |||||
Traction and winding drum elevators
| |||||
1 to 10 floors
|
$151
| ||||
Over 10 floors
|
$194
| ||||
Hydraulic elevators
|
$108
| ||||
Roped hydraulic elevators
|
$151
| ||||
Escalators or moving walks
|
$151
| ||||
One-year inspections
| |||||
Traction and winding drum elevators
| |||||
1 to 10 floors
|
$216
| ||||
Over 10 floors
|
$259
| ||||
Hydraulic elevators
|
$162
| ||||
Roped hydraulic elevators
|
$216
| ||||
Escalators and moving walks
|
$346
| ||||
Dumbwaiters
|
$86
| ||||
Stairway chair lifts, inclined vertical wheelchair and man lifts
|
$130
| ||||
Additional annual charges for the following features:
| |||||
Oil buffers
|
$43
| ||||
Counterweight governor and safeties
|
$86
| ||||
Auxiliary power generator
|
$54
| ||||
Three-year or five-year inspections
| |||||
Traction and winding drum elevators
| |||||
1 to 10 floors
|
$367
| ||||
Over 10 floors
|
$410
| ||||
Hydraulic elevators
| |||||
3-year inspection
|
$270
| ||||
5-year inspection
|
$162
| ||||
Roped hydraulic elevators
| |||||
3-year inspection
|
$270
| ||||
5-year inspection
|
$162
|
Item
|
Fee
| ||
---|---|---|---|
Demolition permits
| |||
Demolition of structure less than 5,000 square feet in area
and 30 feet in height
|
$75
| ||
Demolition of one- or two-family residences and structures on
farms, including commercial farm buildings under N.J.A.C. 5:23-3.2(d),
used exclusively for storage of food or grain, or sheltering of livestock
|
$75
| ||
Demolition of structures in all other groups
|
$120/story
| ||
Permit to construct a sign
|
$24/$1,000 estimated cost
| ||
Certificates of occupancy
| |||
In general
|
10% of cost of new construction permit fee; minimum fee of $120
| ||
One- or two-family structures less than 5,000 square height
in area and 30 feet in height, and structures on farms, including
commercial farm buildings subject to N.J.A.C. 5:23-3.2(d), used exclusively
for storage of food or grain, or sheltering of livestock
|
10% of cost of new construction permit fee; minimum fee of $120
| ||
Certificate granted pursuant to a change of use group
|
$120
| ||
Certificate of continued occupancy
|
$40
| ||
Temporary certificate of occupancy or certificate of approval
|
No fee
| ||
Extension of temporary certificate of occupancy or certificate
of approval
|
$65
| ||
Certificate of compliance for new elevator device
|
$85
| ||
Review of building for compliance under alternate systems and
nondepletable energy source provisions of Energy Subcode
| |||
One- and two-family homes and for light commercial structures
having the indoor temperature controlled from a single point
|
$200
| ||
All other buildings
|
$500
| ||
Application for a variation in accordance with N.J.A.C. 5:23-2.10
| |||
Class 1 structures
|
$200
| ||
Class 2 and 3 structures
|
$200
| ||
Resubmission of application for variation in accordance with
N.J.A.C. 5:23-2.10
| |||
Class 1 structures
|
$200
| ||
Class 2 and 3 structures
|
$200
| ||
Annual construction permit based on number of maintenance workers
| |||
1 to 25 workers (including foreman)
|
$425
| ||
Each additional worker over 25
|
$165
| ||
Annual training registration
|
$140/subcode
| ||
Certificate of smoke detector and carbon monoxide alarm compliance
|
$35
| ||
Each additional inspection of smoke detector and carbon monoxide
alarm compliance
|
$35
|
Item
|
Fee
| ||
---|---|---|---|
Fees for replacement or new installation of:
| |||
Wood- or gas-fired stove or fireplace, water heater, boiler,
furnace, air-conditioning unit, pool heater, oil and propane tanks,
oil or gas lines, existing R-2, R-4 and R-5
|
$100
| ||
For each additional appliance on the same permit
|
$75
|