[Amended 12-8-1994 by Ord. No. 94-17]
If all required exhibits and fees have been received to the satisfaction
of the Franklin Township Construction Code Official and Township Engineer,
the Franklin Township Construction Code Official will issue the opening permit.
The permit shall contain the following data:
A. A listing of the supporting documents, plans, specifications,
etc., that are the basis for the permit.
B. A brief description of the location of the proposed opening
and the work contemplated.
D. The method and amount of fees paid.
[Amended 2-5-1987 by Ord. No. 87-6]
An opening permit may be renewed for a period of time not to exceed the total time of the original permit, upon request of the permittee and upon payment of an additional fee as provided Chapter
182, Fees.
Opening permits are not transferable.