a.
|
SUBDIVISION OF
| |||||
LOT __________ BLOCK ___________ ZONE ____________
DATE __________ SCALE ____________________________
APPLICANT
ADDRESS
SUBDIVISION CONTROL NO.
| ||||||
b.
|
I CONSENT TO THE FILING OF THIS SUBDIVISION
PLAT WITH THE PLANNING/ZONING BOARD OF SOUTH HARRISON TOWNSHIP.
| |||||
| ||||||
(Owner)
|
(Date)
| |||||
c.
|
To be signed before issuance of a building permit
and incorporated only on a final plat of a major subdivision:
| |||||
I HEREBY CERTIFY THAT ALL THE REQUIRED IMPROVEMENTS
HAVE BEEN INSTALLED OR A BOND POSTED IN COMPLIANCE WITH ALL APPLICABLE
CODES AND ORDINANCES.
| ||||||
(If improvements installed)
| ||||||
(Township Engineer)
|
(Date)
| |||||
(If bond posted)
| ||||||
(Municipal Clerk)
|
(Date)
| |||||
Building permit issued (date)
| ||||||
d.
|
To be incorporated on final plat for major or
for minor and signed prior to issuance of a building permit:
| |||||
VERIFICATION THAT PAYMENT OF MUNICIPAL TAXES
OR ASSESSMENTS IS CURRENT.
| ||||||
| ||||||
(Tax Collector)
|
(Date)
| |||||
e.
|
The appropriate approval signature block to
be incorporated depending on whether subdivision is a minor or a major.
|
(1)
|
Minor Subdivision Approved
|
(Date of Board Approval)
| ||||
| ||||||
(Chair)
|
(Date)
| |||||
| ||||||
(Planning/Zoning Board Secretary)
|
(Date)
| |||||
Deed to subdivision must be filed with County
Clerk within 190 days of date of Board Approval.
| ||||||
(2)
|
Major Subdivision Approved (Preliminary or Final)
(Date of Board Approval)
| |||||
| ||||||
(Chair)
|
(Date)
| |||||
| ||||||
(Planning/Zoning Board Secretary)
|
(Date)
| |||||
(f)
|
EXPIRATION OF APPROVAL (1) Major: preliminary
– 3 years; final – 2 years; or (2) minor: 2 years.
| |||||
Date (without extensions)
|
"No construction permit or certificate of occupancy
or other required permits for construction of any building on any
lot within this subdivision will be issued and no building shall be
constructed on any lot in this subdivision until the following on-tract
and off-tract improvements have been constructed as required by the
final subdivision approval and approved by the Township Engineer:
|
Upon the issuance of a certificate of occupancy
for a building on a lot in this subdivision the foregoing restrictions
will no longer apply to that lot."
|
"No construction permit, or certificate of occupancy
or other required permits for construction of any building on any
lot within this subdivision will be issued and no building shall be
constructed on any lot in this subdivision until the following on-tract
and off-tract improvements have been constructed as required by the
final subdivision approval and approved by the Township Engineer:
|
Upon the issuance of a certificate of occupancy
for a building on a lot in this subdivision the foregoing restrictions
will no longer apply to that lot.”
|