All deeds covering land to be used for public
purposes, easements, and rights-of-way over property to remain in
private ownership, and rights of drainage across private property,
shall be submitted in a form satisfactory to the Town Attorney.
As-built construction drawings, plan and profile,
of all infrastructure improvements, buildings and structure footprints
shall be prepared at a scale of one inch to 20 feet, including, but
not limited to:
A. Underground utilities (sewer lines, storm drains,
water lines, electrical, phone, cable, natural gas lines, etc.).
B. Drainageways, ditching, impoundments, swales, etc.
A financial surety shall be in an amount equal
to 10% of the cost for completion of all roads (public or private)
drainage, and landscaping. The financial surety shall be effective
for a period two years after site improvements are completed. If such
repairs are needed and are not satisfactorily installed by the developer,
then such guarantee shall be used to complete and/or install such
improvements.