The purpose of these regulations is to provide for the protection
of the environment, and the protection of the public health, safety,
and general welfare by requiring the proper siting, construction,
upgrade, and maintenance of on-site sewage disposal systems in the
Town of Southwick.
Disposal system installers must demonstrate proficiency in the
installation of septic systems acceptable to the Board of Health.
This demonstration of proficiency may include, but may not be limited
to the following:
A. Passing of a written test with a minimum grade of 70% as administered
by the Board of Health.
B. Written verification that demonstrates that the applicant has performed
similar work for a period of at least two years.
C. Documentation of contractor liability insurance.
The Department of Environmental Protection (DEP) approved system
inspector is required to notify the Board of Health at least five
business days in advance of a pending disposal system inspection.
Notification shall include date, time, and location of the disposal
system inspection. A member of the Board of Health or its agent shall
have the option to witness any disposal system inspection.
Any person aggrieved by the final decision of the Board based
on these regulations, may appeal that decision provided that a written
request for a hearing is filed with the Board within seven days of
receipt of the decision.