A. For licensed dogs: $25 pickup fee plus board charge.
B. For unlicensed dogs: $50 pickup fee plus board charge.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
The driveway connection application fee is $50. See Chapter
277, Streets and Sidewalks, Article
I, Connection of Driveways to Public Streets.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
The fee for each false alarm shall be as follows:
Number of False Alarms Within 12 Calendar
Months
|
Fee per Each False Alarm
|
---|
1 to 2
|
$0.00
|
3
|
$35.00
|
4 to 5
|
$50.00
|
6 or greater
|
$75.00
|
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
Pursuant to Chapter
190, Junkyards and Junk Dealers, the following fees apply:
B. Transfer of license fee: $10.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
Transfer or issuance (Local Agency Law, 2 Pa.C.S.A.
§ 551 et seq.): $400.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
A. Annual operation permit: $20 per mobile home lot with
a minimum of $100 per mobile home park.
B. Permit to authorize removal of a mobile home [issued
by the Township Tax Collector, as required by the Act 1 of July 8,
1969, P.L. 130, § 72 P.S. § 5020-407(d)]: $20
plus real estate taxes assessed against the mobile home and unpaid
at the time the permit is requested.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
A. Plumber's fees.
(1) Every plumber and sewer contractor performing work
covered by this code for a fee, annual license fee: $30 for first
permit, plus $5 for each additional plumber in same firm.
(2) Minimum license fee to be paid by any plumber or sewer
contractor regardless of whether such plumber or sewer contractor
does business as a sole proprietorship, a partnership or a corporation:
$30.
The Township hereby establishes the following
fees in connection with requests for inspection and duplication of
public records:
A. Photocopying per page: $0.15.
B. Formatted computer disks: $5.
C. Certification of any document as a true and correct
copy of a Township record: $10.
D. Certification that the Township has examined its records
and an identified record does not exist: $5.
E. Postage or express mail charges to respond to request
for public record by forwarding records to requester: actual cost
incurred by Township.
F. Reproduction of record by third party when Township
does not have necessary equipment: actual cost incurred by Township.
G. Search of records by Township employee if written
request does not precisely identify the public record: $10 per 1/2
hour.
H. Duplicate police report: $15.
[Added 2-18-2004 by Res. No. 02-18-04-3]
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
Pursuant to Chapter
277, Streets and Sidewalks, Article
II, Construction, Opening or Dedication of Public Streets, the following fees apply:
A. Fees for processing the acceptance of streets which
have been offered for dedication to the Township:
(1) First street which the Township is requested to accept:
$1,000.
(2) For each additional street which the Township is requested
to accept at the same time: $500.
B. Should the fees and costs incurred by the Township
in processing the acceptance of dedication of streets be greater than
the fees established herein, the Township shall bill the person requesting
that such streets be accepted for all such additional fees and costs.
The person requesting acceptance of streets shall pay the bill for
the additional fees and costs within 30 days after the bill is issued
by the Township.
C. The request by any person for the Township to accept
dedication of a street or streets shall constitute and be deemed an
implied promise and contract to pay all fees imposed by this section.
D. This section and the payment of fees established herein
shall create no obligation upon the Township to accept dedication
of any street or streets.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
A. General permit and other fees for on-lot septic systems. All fees
associated with the receipt, review, processing and issuance of on-lot
septic system(s) shall be the responsibility of the applicant and
made payable to Warwick Township. These fees have been established
to allow Warwick Township to reimburse the Township SEO for its services
rendered in addition to recovery of administrative costs incurred
by the Township. The SEO shall be reimbursed directly by the Township
(not applicants) at the fee schedule as established at the time of
appointment by the Township. All designs for sewage systems must be
completed by the applicant or his/her agent for review and approval
by the Township SEO. The fees set forth herein do not cover any design
work for a sewage system. They are considered other costs in addition
to these fees and are the responsibility of the applicant or his/her
agent.
[Amended 4-3-2013 by Res. No. 04-03-13-01]
(1)
Residential dwelling for installation of new sewage system or
to repair the system and the renewal or reissue of a revoked or expired
permit. This permit fee does not include other services necessary
in the permit process as necessary and described below such as site
testing, design reviews and planning. These other services shall be
paid in addition to this permit fee. Fee: $100.
(2)
Commercial, industrial or institutional structure for installation
of new sewage system or to repair the system and the renewal or reissue
of a revoked or expired permit. This permit fee does not include other
services necessary in the permit process as necessary and described
below such as site testing, design reviews and planning. These other
services shall be paid in addition to this permit fee. Fee: $130.
(3)
Special permit for a repair activity when something broken is
either fixed or replaced. Examples include replacing a broken pipe,
replacing a pump, replacing a cracked lid (tanks or on a riser trap),
replacing a gas deflector, replacing a solids retainer, etc. NOTE:
This does not include replacing tanks or an absorption field. Fee:
$75.
(4)
Special permit for a modification activity when a structural
change to an existing system that would not constitute a "repair."
Examples include adding a riser, adding an effluent filter, adding
an inspection port, etc. NOTE: This does not include adding an additional
septic tank, adding a pump tank or expansion of an absorption field.
Fee: $75.
(5)
Additional services required for above permits: The fees established
above have been established based upon "standard conditions." If permitting
on a particular site exceeds these limitations or "standard" conditions
and requires additional time, then the fees incurred and associated
with additional time or services necessary shall be paid on an hourly
basis. When determining service fees required beyond the base fee,
a separate reconciliation shall be provided (invoice) for actual hours
spent at the hourly rate ($75) demonstrating fees in excess of the
base fee amount. Additional time/services required: $75/hour.
(6)
Miscellaneous inspections and reviews required: Miscellaneous
inspections and review fees such as annual holding tank or system
inspections, review of reports or findings (on-lot management program)
shall be paid on an hourly basis. Any and all sites which incur services
by the SEO whether necessitated by annual maintenance agreements or
obligations or otherwise as identified in the regular maintenance
program or initiated by the property owner or other agents or officials
of the Township shall be responsible for any and all costs associated
with these services as follows. Time/services required: $75/hour.
B. Fees for site testing, design reviews and planning reviews. All fees
associated with the receipt, review, processing and completion of
on-lot system(s) testing and planning shall be the responsibility
of the applicant and made payable to Warwick Township. These fees
have been established to allow Warwick Township to reimburse the Township
SEO for its services rendered in addition to recovery of administrative
costs incurred by the Township. The SEO shall be reimbursed directly
by the Township (not applicants) at the fee schedule as established
at the time of appointment by the Township. Please take note that
all other costs associated with this work (additional consultant fees,
backhoe fees, etc.) are the responsibility of the applicant or his/her
agent for coordination with the Township SEO. The fees set forth herein
do not cover any related costs other than the SEO services and administration.
These other costs are in addition to these fees and are the responsibility
of the applicant or his/her agent.
[Amended 4-3-2013 by Res. No. 04-03-13-01]
(1)
Percolation testing. The Township SEO performs complete percolation
testing only as required for each lot. The base fee is limited to
percolation testing on six tests per lot under "standard conditions."
If testing exceeds these limitations or conditions and requires additional
time, then the fees incurred and associated with additional time or
services necessary shall be paid on an hourly basis. When determining
service fees required beyond the base fee, a separate reconciliation
shall be provided (invoice) for actual hours spent at the hourly rate
($75) demonstrating fees in excess of the base fee amount.
(a)
Base fee (six holes/lot): $350/lot.
(b)
Additional time/services required: $75/hour.
(2)
Deep probe readings. The Township SEO performs the deep probe
readings on site as required for each lot. The hourly fee for services
rendered shall include any and all time associated with performing
deep probe readings, preparation of reports, distribution of findings
and any administrative or other related activities. Hourly rate for
services: $75/hour.
(3)
Septic system design review. The Township SEO shall review all on-lot sewage system designs submitted for permitting. The fees incurred and associated with these services shall be paid on an hourly basis. A permit will not be issued until the permit fee (Subsection
A above) and all design review fees (or other applicable fees) are fully paid by the applicant. Hourly rate for services: $75/hour.
(4)
Planning documentation review. The Township SEO reviews, recommends
and processes any and all planning documents, sewage modules and other
necessary documents associated with a particular site. The SEO work
shall be completed as required by the PADEP as prescribed in their
regulations and requirements. The fees associated with this work shall
be based upon an hourly fee for services rendered applicable to the
particular site. Hourly rate for services: $75/hour.
E. Fees to be paid to the Sewage Enforcement Officer
by the Township for all activities not included in the above at the
rate of $65 per hour.
F. Applicant to supply water for testing. Applicant shall
supply any water necessary for testing if the terrain or other conditions
are such that the Sewage Enforcement Officer is unable to reasonably
transport water to the testing site.
G. Applicant responsible for additional costs. The cost
of any professional services (e.g., engineers or soil scientists)
rendered to provide additional soil information and other opinions
shall be the responsibility of applicant.
H. Payment of fees. All fees and charges required to
be paid by the applicant shall be paid prior to the performance of
the designated services by the Sewage Enforcement Officer in accordance
with the rates of compensation set forth above.
I. Disposition of fees paid. All fees and charges received
by the Township shall be paid prior to the performance of the designated
services by the Sewage Enforcement Officer in accordance with the
rates of compensation set forth above.
J. Monthly report. The Sewage Enforcement Officer shall
submit a complete report each month for the reimbursement of fees
and charges due him/her.
K. Additional duties of Sewage Enforcement Officer. The
Sewage Enforcement Officer shall assist with the preparation of the
application for reimbursement of expenses in accordance with Section
6 of the Pennsylvania Sewage Facilities Act and shall supply such
information and data as is required by the Pennsylvania Department
of Environmental Protection.
M. Waiver for designation of relocation site: $15.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03; 4-16-2014 by Res. No.
04-16-14-02]
A. Application fee established. Fees shall be imposed at the preliminary,
final and improvement construction plan stages and for revised plans,
lot add-on plans and stormwater management plans. The preliminary,
final, revised and lot add-on plan filing fees shall consist of two
parts, namely, a basic fee and a lot and/or unit of occupancy fee.
The basic fee covers the cost of the initial lot (remaining acreage)
or unit of occupancy based upon the type of development involved.
The lot fee is charged for each additional proposed lot and/or each
existing lot which receives additional area (lot add-on). The unit
of occupancy fee is charged for each proposed unit of occupancy in
excess of one unit per lot. The amount of the above-mentioned fee
shall be as follows:
|
Plan Type
|
Subdivision/Land Development Fees
|
Escrow Fund
|
---|
|
Sketch
|
$250
|
|
$1,000
|
|
Residential:
|
|
|
|
|
|
Preliminary
|
$350
|
Lots - 1 to 5
|
$5,000
|
|
|
|
+$30 each lot/unit
|
Each additional lot
|
$200
|
|
|
Final
|
$350
|
Lots - 1 to 5
|
$5,000
|
|
|
+$20 each lot/unit
|
Each additional lot
|
$200
|
|
Nonresidential
|
$400
|
1 Acre
|
$5,000
|
|
|
|
Over 1 Acre
|
$10,000
|
|
Lot add-on
|
$250
|
|
$1,000
|
|
Land development
|
$400
|
1 Acre
|
$5,000
|
|
|
+$10 per 1,000 square feet
|
Over 1 Acre
|
$10,000
|
|
Waiver application
|
$350
|
|
$1,000
|
|
Stormwater management review
|
$250
|
|
$1,500
|
|
Stormwater management review: small projects
|
|
|
|
|
|
Certified
|
$175
|
|
$500
|
|
|
Uncertified
|
$250
|
|
$1,500
|
|
Improvement construction plan
|
$300
|
|
$5,000
|
|
Revised plan
|
$250
|
|
$1,000
|
B. Fee payable with application. All fees must be submitted to the Township
with plan applications. Plan applications shall not be accepted without
fees, and neither the Warwick Township Planning Commission nor the
Warwick Board of Supervisors shall take action on a plan application
submitted without a fee. The fees imposed by this resolution are in
addition to any fees imposed by the Lancaster County Planning Commission
pursuant to § 502 of the Pennsylvania Municipalities Planning
Code for its review of plans showing improvements, extensions
or connections to the Authority's sewer and/or water lines. All
fees shall be paid by check or money order drawn to the Treasurer
of Warwick Township.
C. Recording fees. Any cost relating to the reduction of final plans
for the purpose of recording the same with the Recorder of Deeds of
the County of Lancaster shall be paid by the applicant.
D. Escrow fees for plan review expenses. Applications shall be accompanied by a fee to be placed in escrow to cover all reasonable and necessary charges that may be incurred by the Township's professional consultants, including the Township Solicitor and the Township Engineer, for the review and any report or reports to the Township on an applicant's application, plans, supporting data, proposed agreements relating to the maintenance of improvements or open space, deeds of dedication and similar matters, stormwater management permits, and subdivisions and land developments. Such review fees shall be the actual fees charged by the Township Solicitor, Township Engineer or other professional consultant for the services performed. The present fee schedule of the Township Engineer is on file at the Township Offices. Such schedule shall be revised to reflect changes in the rates charged to the Township by the Township Engineer. Any amount in the escrow funds which exceeds the professional consultant review costs shall be returned to the applicant. If this amount in the escrow fund is not sufficient to meet all professional consultant review costs, the applicant shall be billed therefor and shall pay the amount due within 45 days of such billing. The filing of a plan or application under this chapter, or the Warwick Township Stormwater Management Ordinance (Chapter
270), shall constitute an implied agreement by the applicant to pay such expenses.
E. Reimbursement for inspection of improvements when such inspection
is performed by Township Engineer or other professional consultant.
Developers shall reimburse the Township for all reasonable and necessary
charges incurred by the Township's professional consultants or
the Township Engineer for inspection of the improvements required
to be constructed and any report or reports to the Township thereon.
Such inspection fees shall be the actual fees charged by the Township
Engineer. The present fee schedule of the Township Engineer is on
file at the Township offices. Such schedule shall be revised to reflect
changes in the rates charged to the Township by the Township Engineer.
F. Reimbursement for inspection of improvements when such inspection
is performed by Township personnel. In some circumstances, inspection
of improvements may be performed by personnel employed by the Township.
If the inspection is performed by Township personnel, developers shall
reimburse the Township for all reasonable and necessary charges incurred
by the Township for inspection of the improvements required to be
constructed and any report or reports to the Township thereon. When
the inspection is performed by Township personnel, the fee shall be
the hourly inspection rate of the particular employee who performed
the inspection services plus any expenses incurred, including mileage
charges for the Township vehicles used for transportation to the site.
A minimum charge of $20 per hour per person will be billed for the
first hour or any portion thereof. Any time in excess of one hour
shall be billed at the same rate on a proportional basis. This charge
shall be revised to reflect changes in the costs to the Township for
utilizing its personnel to perform such inspections.
G. Resolution of fee disputes. In the event the developer disputes the
amount of any such inspection fee or expenses, the developer shall,
within 30 days of the billing date, notify the Township Secretary
that such fees are disputed as unreasonable or unnecessary, in which
case the Township shall not delay or disapprove any approval or permit
related to development due to the developer's dispute of the
fees. Disputes shall be resolved as follows:
(1)
If, within 45 days of the date of billing, the Township and
the developer cannot agree on the amount of expenses which are reasonable
and necessary, then the Township and the developer shall jointly,
by mutual agreement, appoint an arbitrator to resolve such dispute
who shall be of the same profession or discipline as the professional
consultant whose fees are being disputed, who shall review such charges
and expenses and make a determination as to the amount thereof which
is reasonable and necessary.
(2)
The arbitrator so appointed shall hear such evidence and review
such documentation as the professional in his/her sole opinion deems
necessary and render a decision within 50 days of the billing date.
The developer shall pay the entire amount determined in the decision
within 60 days from the billing date.
(3)
The fee the arbitrator shall be paid by the applicant if the
review fee charged is sustained by the arbitrator; otherwise, it shall
be divided equally between the parties. If the disputed fees are found
to be excessive by more than $5,000, the arbitrator shall have the
discretion to assess the arbitration fee in whole or in part against
either the applicant or the professional consultant. The Board of
Supervisors and the consultant whose fees are the subject of the dispute
shall be parties to the proceeding.
H. Additional expenses. All expenses incurred by the Township prior to street dedication for the installation, maintenance or operation of street signs, traffic control signs, traffic control lights, streetlights and any other signs or lights which are necessitated by the applicant's land development or subdivision shall be charged to and paid by the applicant. A minimum charge of $30 per hour, per person, shall be billed for the first hour or any portion thereof for the costs of installing traffic control signs or performing other services for the development. The actual cost of all supplies, including signs, poles and other materials, shall be paid by the developer. If the Township is required to provide snow removal services on a road not accepted by the Township, the developer shall be charged the reasonable and customary commercial rate for such services plus the actual cost of all materials used. The filing of a plan or application under the provisions of the Subdivision or Land Development Ordinance (Chapter
285) or the Warwick Township Stormwater Management Ordinance (Chapter
270) shall constitute an implied agreement by the applicant to pay such expenses.
[Amended 6-18-2014 by Res. No. 06-18-14-01]
A. The Board of Supervisors of the Township of Warwick
hereby authorizes the Tax Collector to impose the following fees for
services provided by the Tax Collector which are not part of the Tax
Collector's required duties under the Local Tax Collection Law:
(1)
Issuing of tax certification: $20.
(2)
Issuing of duplicate bills, receipts or similar
records: $5.
B. The Tax Collector is hereby authorized to obtain reimbursement
from any person who does not make proper payment to the Tax Collector
for any costs, fees or expenses which result from such improper payment.
Such costs include, but are not limited to, fees and charges imposed
by financial institutions for processing checks which are deposited
and returned because the account has insufficient funds.
(1) Bank
check return fee: $20.
C. The Board of Supervisors hereby appoints the elected
Tax Collector as the municipal officer authorized to provide tax certifications
and administrative real estate tax services and to impose fees therefor
relating to the collection of real estate taxes upon request by the
public.
D. All fees established in accordance with Subsections
A,
B and
C shall be assessed, collected and retained by the Tax Collector.
E. These fees shall take effect and be in force immediately
and shall apply to all charges imposed by the Tax Collector for tax
certifications issued on or after July 1, 2014.
[Amended 8-16-2006 by Res. No. 08-16-06-03; 2-18-2009 by Res. No. 02-18-09-01; 3-16-2011 by Res. No. 03-16-11-03]
Pursuant to Chapter
222, Peddling and Soliciting, the following applies:
A. The transient retail business license fee shall be
$15.
B. Expiration. All annual licenses shall be for the period
of October 1 to September 30. There shall be no prorated license fees,
and all licenses shall expire on September 30.
C. Appeals. The fee for an appeal to the Board of Supervisors
from the revocation or suspension of a license application shall be
$150.
[Added 12-6-2006 by Res. No. 12-06-06-01; 2-18-2009 by Res. No. 02-18-09-01; 2-18-2009 by Res. No. 02-18-09-02; 2-3-2010 by Res. No. 02-03-10-01; 3-16-2011 by Res. No. 03-16-11-03; 5-7-2014 by Res. No. 05-07-14-01]
Pursuant to Chapter
120, Construction Codes, Uniform, the following applies:
A. Time of payment of fees. The zoning, residential and nonresidential/multifamily fees hereby established must be paid by applicants prior to the issuance of a zoning/building permit, and all nonresidential and multifamily plan review and inspection fees must be paid to the approved third-party agency prior to the Township collecting its own fees and issuing the zoning/building fees for construction activity covered by Chapter
120, Construction Codes, Uniform, of the Code of Ordinances.
B. Zoning permit fees. All applicants for a zoning permit shall pay
a fee which consists of the following two components: (1) Act 157
of 2009 fee; and (2) zoning fee, which shall be calculated as follows:
(2)
Zoning and inspection fees:
(a)
Stormwater small projects: actual cost.
(b)
Driveway permit fee: $40.
(c)
Decks and patios (on grade) and fences: $40.
(d)
Sheds and accessory structures (zero to 1,000 square feet):
$50 with no utilities.
(e)
Sheds and accessory structures (zero to 1,000 square feet):
$50 plus inspections with utilities.
(i)
Residential demolition: $100.
C. New residential construction. All applicants for a permit for new
residential construction shall pay a fee which shall consist of three
components: (1) plan review; (2) Act 157 of 2009 fee; and (3) administrative
and inspection fee, which shall be calculated as follows:
(1)
Plan review fee: actual cost.
(3)
Administrative and inspection fees:
(a)
Cost/value of improvements:
[2]
Each $1,000 or fraction thereof in excess of $5,000: $3.
(c)
Residential demolition: $100.
(d)
Use and occupancy fee: $40.
(f)
Dwellings. This fee shall include all usable space, additions
to existing structures and shall exclude garages, unfinished basements,
porches at main entrance and decks.
[1]
Cost: $0.40 per square foot (minimum $200).
(g)
Accessory structures over 1,000 square feet and mobile homes.
[1]
Cost: $0.25 per square foot (minimum $200).
(h)
Decks and patios above grade and screened porches.
[1]
Cost: $0.15 per square foot (minimum $100).
D. New nonresidential and multifamily construction. All applicants for
a permit for new nonresidential and multifamily construction shall
pay a fee which shall consist of three components: (1) plan review;
(2) Act 157 of 2009 fee; and (3) administrative and inspection fee,
which shall be calculated as follows:
(1)
Plan review and recording fee: $100.
(3)
Administrative and inspection fee:
(a)
Cost/value of improvements:
[2]
Each $1,000 or fraction thereof in excess of $5,000: $3.
(c)
Decks, patios (on grade) and fences: $40.
(d)
Sheds and accessory structures (zero to 1,000 square feet):
$75 with no utilities.
(e)
Sheds and accessory structures (zero to 1,000 square feet):
$100 plus inspections with utilities.
(f)
Commercial demolition: $200.
(h)
New structures other than agricultural buildings; includes basements,
decks, patios, porches (covered or not) and fire detection and/or
protection submitted with plans for new construction.
[1]
Cost: $0.07 per square foot (minimum $250).
E. New agricultural construction.
(1)
The Board of Supervisors recognizes the need to provide agricultural
buildings in the community without the intrusion of complex construction
regulations. Therefore, agricultural buildings not used for human
habitation (barns and similar buildings), and not used for the sole
purpose of storage of manure or other uses which may potentially damage
the environment, shall be exempt from the UCC, inspections and standard
fees. Notwithstanding this exemption, a zoning permit will be required
for all agricultural construction.
(2)
A building permit and subsequent inspections will be required
for manure storage pits and any other construction determined to be
hazardous or injurious to the environment. Fees for these permits
are based on the following schedule:
(b)
Administrative and inspection fee for new agricultural building
construction which is not exempt from the Construction Code Ordinance:
[1]
Dollar value of improvement up to $3,000: $30.
[2]
Dollar value of improvement over $3,000: $3 per each additional
$1,000 or fraction thereof.
F. Certificate of occupancy. The fee shall be $40.
G. Signs. Each applicant for a permit shall pay the Act 157 of 2009
fee of $4 and in addition shall pay:
(2)
Nonresidential new: Township fee of $50 per sign.
(3)
Nonresidential replace: Township fee of $50 per sign.
H. Temporary buildings. Each applicant for a permit shall pay the Act
157 of 2009 fee of $4 and in addition shall pay $100.
I. Remodeling and renovations. All applicants for a permit for remodeling
or renovation construction shall pay a fee at the time of application
which shall consist of two components: (1) Act 157 of 2009 fee; and
(2) administrative and inspection fee, which shall be calculated as
follows:
(1)
Act 157 of 2009 fee:
(a)
Residential construction: $4.
(b)
Nonresidential construction: $4.
(2)
Residential construction:
(a)
Dollar value of improvement up to $5,000: $150 plus inspection
fees.
(b)
Dollar value of improvement over $5,000: $200 plus inspection
fees.
(3)
Nonresidential construction: 0.001 of construction cost ($250
minimum).
(4)
Residential mechanical, electrical and/or plumbing, Township
fees only:
(a)
Fifty dollars plus inspection fees.
(5)
No permit or fee will be required for an existing dwelling that
is compelled to connect to a municipal water or sanitary facility.
No inspections will be required since the Municipal Authority will
certify such hookups.
(6)
Roofs structural improvements not considered repairs or maintenance:
$0.15 per square foot with a minimum fee of $100.
(7)
Plan review fee: actual cost.
J. Demolition permit. A permit is not required for small structures
less than 500 square feet, agricultural buildings or any building
without a permanent foundation. All others require a permit with a
fee of $100 for residential and $200 for nonresidential.
K. Renewals of expired building, electrical and plumbing permits. The
fee shall be 1/2 of original fee.
L. Certification letter pertaining to sale, certification or use of
property. The fee shall be $10.
M. Appeals to Warwick Area Appeals Board. Any person desiring to file
an appeal from a determination of the building code official or construction
code official, a request for a variance of any provision of the UCC,
or any request for an extension of a time limit imposed by the UCC
or a determination of the Construction Code Official or Building Code
Official shall file a written appeal to the Warwick Area Appeals Board
(the "Appeals Board") on a form provided by the Township together
with the required fee of $400. Appeals or applications to the Appeals
Board shall be filed with the Building Code Official. The Building
Code Official shall not accept any appeal or application to the Appeals
Board without the required appeal fee.
N. Act 157 of 2009 fee. Act 157 of 2009 amended Section 703 and Act
13 of 2004 of the Pennsylvania Construction Code Act to require municipalities
to remit $4 from each permit fee collected to the commonwealth for
deposit in the Municipal Code Official Training Account. If the Pennsylvania
Legislature enacts a statute to increase the fee imposed by Act 157
of 2009, all parts and provisions of this section which impose a fee
pursuant to Act 157 of 2009 shall be interpreted to impose the fee
as increased by the Legislature.
[Added 3-5-2008 by Res. No. 03-05-08-01]
The fee schedule, as follows, and incorporated herein is hereby
adopted in connection with the administration of the Zoning Ordinance and with respect to conditional use hearings before the
Board of Supervisors and hearings before the Zoning Hearing Board.
A. Fees
must be submitted to the Township along with the required appeal,
application or petition. No action will be taken on an appeal, application
or petition without payment of the required fee. Fees should be in
the form of a check or money order drawn to the Township of Warwick.
B. Fee schedule.
(1) Appeal
or application to the Zoning Hearing Board.
(b) Request for continuance of a hearing to another date: $100 (in addition
to base fee).
(2) Challenges
to the validity of the Zoning Ordinance (the fee for a hearing on
a petition for a curative amendment to the Zoning Ordinance or Zoning
Map which has been submitted to the Board of Supervisors or for a
hearing before the Zoning Hearing Board challenging the validity of
the Zoning Ordinance or Map).
(b) Request for continuance of a hearing to another date: $100 (in addition
to base fee).
(3) Application
for conditional use hearing.
(b) Request for continuance of a hearing to another date: $100 (in addition
to base fee).
(4) Petition
for amendment to the Zoning Ordinance or Zoning Map.
(b) Request for continuance of a hearing to another date: $100 (in addition
to base fee).
[Added 3-4-2009 by Res. No. 03-04-09-01]
|
Fee
|
---|
Facility/Type
|
Class A1
|
Class B2
|
Class C3
|
---|
Township meeting room and facilities
|
N/C
|
N/C
|
$35/hour
|
Pavilion kitchen
|
N/C
|
$50/day
|
$60/day
|
Pavilion only
|
N/C
|
$25/day
|
$50/day
|
Security deposit
|
N/C
|
Up to $200
|
Up to $500
|
Recreational fields
|
N/C
|
N/C
|
Up to $500
|
1Class A: All organizations affiliated
with or supervised by Warwick Township, or as determined by the Board
of Supervisors.
|
2Class B: Warwick Township residents
and businesses, Warwick Township nonprofit organizations (civic, fraternal,
religious, educational).
|
3Class C: All others.
|